2 LAKHRA POWER GENERATION COMPANY Ltd. (GENCO-IV)
LPGCL is a Public limited Co. which was incorporated under Companies Ordinance in Feb 2002 and started functioning from 1st July 2002. The company has been granted Generation License # GL/06/2005 by NEPRA on 18th Feb ’05. NEPRA made determination of Tariff on 21st Feb ’05.

3

4 Fluidized Bed Combustion Coal supplied Agreement with LCDC
Unit-Wise Detail Unit Name Type COD/Age Installed Capacity Dependable Capacity Fuel FSA ST-1 Fluidized Bed Combustion 50 MW 40 MW Lignite Coal Coal supplied Agreement with LCDC ST-2 ST-3

5 FBC POWER STATION LAKHRA
Ever since commissioning , this Plant faces many technical problems resultantly its availability and performance remained low, during 2001, it was decided that the Government of Sindh should take necessary action to privatize Lakhra Power Plant in consultation with Wapda. The privatization process of this plant remained very slow.

6 The station management in 2003 made a rehabilitation programme amounting to Rs.441 million which was scrutinized by a Tech Committee in June ’03 on the directive of BOD meeting. However based upon Non Destructive Testing by experts of WAPDA Central workshop Faisalabad and historical data of Shutdowns, areas of replacements further reduced and expenditure to Rs.254 million.

7 But later it was decided to lease out Lakhra Power Plant and related facility on ROMM (Rehabilitation Operation Maintenance, & Management basis). In result of an open bid , agreement for 20 years was signed on between LPGCL and M/s Associated Lakhra Energy Limited. The management has stopped the comprehensive maintenance of Lakhra Power Plant after the lease agreement.

8 The Zonal Labor Union Lakhra has filed a petition in Sindh High Court , Challenging the leasing of Lakhra Power Plant . M/s Habibullah energy the other bidder also filed petition in Sindh High Court against leasing . After the Court case , the local management strives hard and rehabilitates the boiler No.1 and finally commission the boiler on Since then same unit is under operation successfully on 35 MW continuously.

9 On both Petitions Sindh High Court Hyderabad Circuit decides in favour of leasing.
Labour Union & M/s Habibullah Energy appealed in the Supreme Court of Pakistan against the decision of High Court of Sindh., which is still pending. The date is in office from April 2010

10 General Characteristics
Maximum Load (MW) 42 37 38 Minimum Load 03 04 05 Plant Capacity Factor (%) 35 31 32 Load Factor Utilization Factor 13 11

11 Availability Characteristics
Total No. of Shutdowns Nos 17 18 Total Shutdown (Hours) (Hrs.) 4941 5254  4854 No. of forced shutdowns Operating Period 3819 3506 3906 Standby Period --- 263 Forced Outage Factor (%) 56 57 55 Planned Outage Factor Operating Factor 44 40 45 Standby Factor 3 Plant Availability Factor 15

12 Operation Characteristics
Gross Energy Generation (MkWh) Energy Sent Out 99.244 83.829 85.737 Reactive Power MVAR Generation 93.807 78.567 97.895 Auxiliary Consumption 3.822 4.297 3.296 (%) 27 26 Output Fctor 73 74

13 Fuel Operation Factors
Total Fuel Consumption (M. Ton) 162,200.00 121,030.00 125,482.00 Fuel Consumption/kWh (Kg/kWh) 1.19 1.07 1.08 Gross Heat Rate (Btu/kWh) Design Heat Rate at Maximum Load Net Heat Rate Thermal Efficiency (Gross) (%) 21.45 23.75 23.42 Thermal Efficiency (Net) 15.61 17.59 17.26

14 Cost Factor 2007-08 2008-09 2009-10 Fuel Cost (Rs./Kwh) 2.08 2.20 2.56
Fuel Cost (Rs./Kwh) 2.08 2.20 2.56 O & M Cost 4.64 6.96 5.69 Total Cost of Energy Generated 6.72 9.16 8.25

15 Present Major Technical Problems
Acute shortage of cooling water, as river Indus changes its course and moves forward about 0I k.M. Efforts are being made to deepen & dig out a channel to connect the intake pound with river. Efforts for new site selection of Pump House Deterioration of Main cooling Towers Rehabilitation of Stacks & structure Replacement of Cooling Fan & cables

16 Present Major Technical Problems
Coal Handling System Rehabilitation of coal Bunkers. Rehabilitation of gear boxes, Coal Crushers & Limestone crushers, Pocking Impeller & Emergency reciprocating feeders Rehabilitation of Coal Cranes & Limestone Cranes. Modification & revival of Dust collectors, Iron removers Boiler Installation of Double Scraper chain for Boiler 1, 2 & 3. Rehabilitation of bags House; doors, ducts & filter bags Rehabilitation of Coal Feeders, Spent bed Coolers for Boiler Rehabilitation of Coal Spreader for Boiler 2&3. Rehabilitation of insulation & cladding, Expansion joints. Modification of re-injection system

17 ESTIMATED AOMOUNT IN MILLION Rs.
REFURBISHMENT PLAN Sr. No. SCOPE WORK PLAN ESTIMATED AOMOUNT IN MILLION Rs. 01. Boilers & Related Auxiliary Equipments Due to deteriorating condition of boilers. Complete rehabilitation alongwith related auxiliary equipments is necessary. Overall reliability / availability of systems improve and efficiency also improved. 560.00 02 Turbo Generator and Related Auxiliary Equipments Turbine & Generator need overhauling along with supervisory equipments Efficiency will be improved. 253.00

18 SCOPE OF REHIBILITATION ESTIMATED AOMOUNT IN MILLION Rs.
REFURBISHMENT PLAN Sr. No. SCOPE OF REHIBILITATION WORK JUSTIFICATION OF WORK ESTIMATED AOMOUNT IN MILLION Rs. 03 Fuel Handling Systems Due to deteriorating conditions of Fuel Handling Systems. Related auxiliary equipments needs to be replaced / rehabilitate .Overall reliability / availability of systems improve and efficiency also improved. 330.00 04 Switch Gears and Switch Yard Equipments Existing position of most of the equipments is worst and requires renovation & replacement. Overall reliability / availability of systems improve and efficiency also improved. 148.00

19 SCOPE OF REHIBILITATION ESTIMATED AOMOUNT IN MILLION Rs.
REFURBISHMENT PLAN Sr. No. SCOPE OF REHIBILITATION WORK JUSTIFICATION OF WORK ESTIMATED AOMOUNT IN MILLION Rs. 05. Civil Works. Rehabilitation of existing acid resistance tiles and fiber glass treatment at dami plant, repair of coal bunker and coal shed. 25.00 06. Water Intake System The river has changed the direction and flowing away from the pump house. The whole area is silt Re-location of existing pump house complete study and commissioning including replacement of pipe line and renovation of power supply system becomes evident 149.50

20 SCOPE OF REHIBILITATION ESTIMATED AOMOUNT IN MILLION Rs.
REFURBISHMENT PLAN Sr. No. SCOPE OF REHIBILITATION WORK JUSTIFICATION OF WORK ESTIMATED AOMOUNT IN MILLION Rs. 07 Chiller Plant Old plant was out of order since long and could no be made serviceable due to lack of spears being absolute model. Improve the efficiency and working environment. 27.00 08 Laboratory Equipments. All equipments are needed for efficiency improvement and quality control of stem water, fuel and environment monitoring. 17.00

21