COMBINED NATURAL GAS POWER PLANT. POWER PLANT LAYOUT.

Similar presentations


Presentation on theme: "COMBINED NATURAL GAS POWER PLANT. POWER PLANT LAYOUT."— Presentation transcript:

1 COMBINED NATURAL GAS POWER PLANT

2 POWER PLANT LAYOUT

3 OFFERING TO SELL ; - 6 ALSTOM Power Plant U.K. construction TYPHOON model gas turbines ( 5.08 MW ) - 1 ALSTOM Power s.r.o. construction ST3- C.V56 steam turbine ( Nom ; MW, Max: 16.3 MW ) - Build in 2003 and has been active since - Maintenance of the turbines are carried out by Siemens - 2 Boilers (heat recover steam generators) - 7 ALSTOM power transformers - Two bus-bar systems (34,5 kV) - Air filtering system for effective performance in polluted enviroments - The facility works with 43% efficency and has a total capacity of 45 MWh.

4 GAS TURBINES (6)

5 Technical Data of the Turbines (6) SGT-100-1S single-shaft turbine for Power Generation Power output 5.25 MW(e) Fuel: Natural gas / liquid fuel / dual fuel and other fuels capability on request Automatic changeover from primary to secondary fuel at any load Frequency: 50/60Hz Electrical efficiency: 30.5% Heat rate: 11,815kJ/kW-hr (11,199Btu/kW-hr) Turbine speed: 17,384rpm Compressor pressure ratio: 14.6:1

6 STEAM TURBINE (1)

7 Technical Data of the Steam Turbine (1) TURBINE : ALSTOM Brno/ Czech Repuplic TYPE : ST3-C, V56A ATP2 (Condensing) TURBOSE OUTPUT: (at generator terminals ) Rated:15,25 MW maximal:16,3 MW Speeds :5952 rpm Live steam Pressure : 45 Bar Temperature: 440 C Flow : 52,2 t/h LP admissio steam Pressure : 6 Bar Temperature :243 C Flow :12,6 t/h

8 Heat Recover Steam Generators/Boilers (2)

9 TECHNICAL DATA FOR BOILERS

10 TRANSFORMERS - To increase the output voltages of generators from 11 kV to 34.5 kV, 7 ALSTOM power transformers are used. - Gas turbine's power transformers are 11 / 34.5 kV and 6550 kVA the - The steam turbine transformer is 11/34.5kV and 20,400 kVA power. - In addition, for internal need we have 4 transformers. 2 of them are 0.4 kV / 1000 KVA, the other 2 are 0.4 kV / 1600 KVA power.

11 COOLING TOWERS

12 AIR FILTERING SYSTEM

13 LIQUID FUEL SYSTEM Gas turbines and natural gas alternative-fuel units, can operate with diesel and naphtha fuels. Fuel transitions can take place without interruption. If there is a drop in gas pressure, the liquid fuel passage is provided automatically.

14 PROCESS FLOW OF THE POWER PLANT

15 TURBINES WORKING AND MAINTANENCE SCHEDULE Turbine Total Working hours until Start Count Net working hours per turbine until Turbine working hours and start count after B-type maintenance B-type (extensive) maintenance dates A-type maintenance dates Gas (core change on Sept 2008) March 2011( ) Nov 2012 ( ) Gas July 2011( ) Nov 2012 ( ) Gas Feb 2011 ( ) Nov 2012 ( ) Gas (core change on July 2011) June 2011 ( ) July 2011 ( ) Gas (core change on Sept 2008) Nov 2010 ( ) Nov 2011 ( ) Gas Nov 2010 ( ) Dec 2011 ( ) Steam Apr 2011 ( ) Total working hours: Working hours of all systems related to turbines Net working hours : Working hours of turbines only B-type maintenance: Extensive maintenance of all systems related to turbines A-type maintenance: Second degree maintenance of all systems related to turbines