Building for Learning Project Photo Progress Report December 2009 Project commencement 21 st September 2009.

Similar presentations


Presentation on theme: "Building for Learning Project Photo Progress Report December 2009 Project commencement 21 st September 2009."— Presentation transcript:

1 Building for Learning Project Photo Progress Report December 2009 Project commencement 21 st September 2009

2 December new on-site substation for power required.

3 December – carpet, ceilings and windows in modernised Administration area

4 December – steel, bond deck arrives for 1 st Floor

5 December – underground cable boring and concrete footings for stairways and elevator

6 December – Company Directors tour with Graeme Connelly – girls were happy, boys were serious. L-R. Chairperson Kerryn Dwyer-Parish, Director Jan Wyatt-Brown, Director Alison Mitchell, Corporate Services Manager Pauline Butler, Builder Graeme Connelly, Director Rod Jones, Director David Ryan.

7 December – bracing underneath bond deck and steel ready for concrete floor above

8 Final preparations and then concrete pour starting 6am, 22 nd December – 150 tonne concrete

9 22 nd December – 11 truck loads of concrete


Download ppt "Building for Learning Project Photo Progress Report December 2009 Project commencement 21 st September 2009."