Presentation is loading. Please wait.

Presentation is loading. Please wait.

TAN : Chemin de Croix Inverse… 5/10/20124th TSG Meeting – JP.Corso1.

Similar presentations


Presentation on theme: "TAN : Chemin de Croix Inverse… 5/10/20124th TSG Meeting – JP.Corso1."— Presentation transcript:

1 TAN : Chemin de Croix Inverse… 5/10/20124th TSG Meeting – JP.Corso1

2 Cahier des Charges Ramener les TANs doù ils sont venus 25/10/20124th TSG Meeting – JP.Corso

3 Rappel Four identical Neutral Beam Absorbers (TAN) First installation: TANC.4R5 (4-5 April 2006) The TAN transport and installation was scheduled before the cryomagnets were installed in the concerned sectors. 7/6/201211h LTEX Meeting - S. Bartolomé Jiménez3 Official name LocationBeam height (mm) Tunnel access shaft Average travel distance (km) Dcum (Start) (m) Dcum (End) (m) TANC.4R5R571 (5R)950 PX TANC.4L5UJ53 (5L)950PX TANAL.4L1RI132 (1L)1100 PX TANAR.4R1RI171 (1R)1100PX

4 Transport and installation Main constraints Access shafts: PX24 and PX64 travel distance in the tunnel ~3.3 km instead of 140 m. 7/6/201211h LTEX Meeting - S. Bartolomé Jiménez4

5 TAN Point 1 RI132 & RI171 Zones à traverser : UJ13-14 ; UL14 ; US15 ; UL16 ; UJ16-17 ; RR17 Arc 1-2 UJ22 ; RH23 ; RA23 ; UX25 ??? Preparations Blindages UJ13 ; UJ17 Ctrl Accès UL14 ; UL16 Accès à UX25 ??? 55/10/20124th TSG Meeting – JP.Corso

6 TAN Point 5 UJ53 & R571 Zones à traverser : UJ53 ; by-pass ; UJ57 ; RR57 Arc 5-6 UJ63 ; RA63 ; RB64 ; UX65 Preparations Blindages RR57 ? Toit quai UX65 65/10/20124th TSG Meeting – JP.Corso

7 Transport and installation Installation process 7/6/201211h LTEX Meeting - S. Bartolomé Jiménez7


Download ppt "TAN : Chemin de Croix Inverse… 5/10/20124th TSG Meeting – JP.Corso1."

Similar presentations


Ads by Google