1 TAN : Chemin de Croix Inverse… 5/10/20124th TSG Meeting – JP.Corso1

2 Cahier des Charges Ramener les TANs doù ils sont venus 25/10/20124th TSG Meeting – JP.Corso

3 Rappel Four identical Neutral Beam Absorbers (TAN) First installation: TANC.4R5 (4-5 April 2006) The TAN transport and installation was scheduled before the cryomagnets were installed in the concerned sectors. 7/6/201211h LTEX Meeting - S. Bartolomé Jiménez3 Official name LocationBeam height (mm) Tunnel access shaft Average travel distance (km) Dcum (Start) (m) Dcum (End) (m) TANC.4R5R571 (5R)950 PX64 3.313469.691613473.9416 TANC.4L5UJ53 (5L)950PX643.313184.941613189.1916 TANAL.4L1RI132 (1L)1100 PX24 3.326514.383226518.6332 TANAR.4R1RI171 (1R)1100PX243.3140.25144.50

4 Transport and installation Main constraints Access shafts: PX24 and PX64 travel distance in the tunnel ~3.3 km instead of 140 m. 7/6/201211h LTEX Meeting - S. Bartolomé Jiménez4

5 TAN Point 1 RI132 & RI171 Zones à traverser : UJ13-14 ; UL14 ; US15 ; UL16 ; UJ16-17 ; RR17 Arc 1-2 UJ22 ; RH23 ; RA23 ; UX25 ??? Preparations Blindages UJ13 ; UJ17 Ctrl Accès UL14 ; UL16 Accès à UX25 ??? 55/10/20124th TSG Meeting – JP.Corso

6 TAN Point 5 UJ53 & R571 Zones à traverser : UJ53 ; by-pass ; UJ57 ; RR57 Arc 5-6 UJ63 ; RA63 ; RB64 ; UX65 Preparations Blindages RR57 ? Toit quai UX65 65/10/20124th TSG Meeting – JP.Corso

7 Transport and installation Installation process 7/6/201211h LTEX Meeting - S. Bartolomé Jiménez7