Week #1 but not confirmed date Week #1 but not confirmed date (5 th ?) Week #3 January 5 th January 6 th for 1 week minimum Week #2 and #3 Week #1.

Similar presentations


Presentation on theme: "Week #1 but not confirmed date Week #1 but not confirmed date (5 th ?) Week #3 January 5 th January 6 th for 1 week minimum Week #2 and #3 Week #1."— Presentation transcript:

1 Week #1 but not confirmed date Week #1 but not confirmed date (5 th ?) Week #3 January 5 th January 6 th for 1 week minimum Week #2 and #3 Week #1

2 C&V 6/5/20142 Mardi 5/1 Mercredi 6/1 Scheduled by GLIMOS NOT this year Mercredi 6/1 Vu avec Merlet possible toute la semaine 1 Semaine 2 Jeudi 7/1 Semaine 2

3 Detector Cooling 6/5/20143

4 Gas systems 1-2 days per gas system. Time agreed with systems All finished in week 1 MDT system will need few days work to debug the profibus cable problem Agreed with MDT during 1 st week (start jan. 4 th ) RPC on Ar over Christmas; TFC (CO2 backup) TGC on CO2 as from 18/12 6/5/20144

5 DCS 5

6 Computers & network infrastructure Access management open 18/12 to 4/1 21/12: work on 4 ACR machines which do not have IPMI. Machines available for the rest of the Christmas period Update of Linux nodes to latest version (requires reboot) Replacement of internal web server: TBS Security updates for gateway machines (transparent) 6/5/20146