Presentation is loading. Please wait.

Presentation is loading. Please wait.

Contents Application for Participation 1 Greetings 2 Company Overview

Similar presentations


Presentation on theme: "Contents Application for Participation 1 Greetings 2 Company Overview"— Presentation transcript:

0 Company Introduction Bestec E&C Co., Ltd.

1 Contents Application for Participation 1 Greetings 2 Company Overview
3 4 Business Fields Licenses and Certificates 5 Equipments and Facilities 6 Major Clients 7 Business Performances 8 Map 9

2 1. Application for Participation
Dear Sirs, We wish to participate in the project to be carried out by your esteemed company and hereby submit our Application for Participation. Your careful consideration shall be greatly appreciated. DATE Lee Jeong Gook CEO Headquarter : , Digital Empire II 486, Sin-dong, Yeongtong-gu, Suwon City, Gyeonggi-do Phone : FAX : Paju Branch : 471-3, Geumseung-ri, Tanhyeon-myeon, Paju City, Gyeonggi-do Phone : ~ FAX :

3 2. Greetings Bestec E&C is an integrated engineering company full of creative wisdom and challenging spirits in the fields of machinery facility construction and electronic construction for electronic, semi-conductor, LCD, OLED, bio, pharmaceutical, power plants, and petro-chemical industries to cover whole range from the early phase for clean room facilities, utilities system, electronic works, and automatic control to design, procurement, construction and following-up control. We always put top priority on customers’ satisfaction through our best performance. Thanks to our long experience on sites, we know what to do and how to do for the customers by our “Cost Down, High Quality, Safety, Delivery, Best A/S” Our basic corporate policy lies in creation, passion, and trust. We give our words that we will always do our best to accompany our customers for healthy growth. Thank you very much. Lee Jeong Gook/CEO Bestec E&C Co., Ltd.

4 3. Company Outlook Introduction
■ Name of the Company: Bestec E&C Co., Ltd. ■ Represented by: Lee Jeong Gook ■ Established on: April 21, 2008 ■ Paid-in Capital: ₩800,000,000 ■ Major Business:Semi-conductor, LCD, Display, Industrial Plants, Clean Room Utilities System, Design for Electronic and Automatic Control Battery Drying Room and Aging Room, Dehydrating works Water Humidifying Facilities, Leakage Detection System UPS, Instant Voltage Drop and Power Failure Compensation works VOC Scrubber and Solvent Collection Facilities Sales of Air Shower and Uninterruptible Products (PLATE, PC,ACRYLIC,PVC) LCD protect film, Tray Products Sales of Pipes, Electric Components, Water Saver, Bus Duct? Industrial Boiler, Sales of Ultrasonic Flow meter ■ Headquarter: , Digital Empire II 486, Sin-dong, Yeongtong-gu, Suwon City, Gyeonggi-do TEL : , FAX : – 7559 ■ Paju Branch:471-3, Geumseung-ri, Tanhyeon-myeon, Paju City, Gyeonggi-do TEL : ~3 , FAX : – 4272 ■ Homepage:

5 3. Company Outlook Brief History
■ 2008 April - Established (Pain-in Capital W400,000,000) June - License of machinery construction - Member of Korea Mech. Const. Contractors Association - Member of Mutual Aid Society of Korea Mech. Const. Contractors Association - Partner Company of Hydis Technology July - Partner Company of SERVEONE November - Partner Company of DONGWOO FINE-CHEM - Partner Company of LG Display - Capital increase up to W400,000,000 - License of electric construction December - Member of Korea Electrical Contractors Association ■ 2009 January - ISO 9001 Certificates February - Capital increase up to W500,000,000 - Dealer of Uninterruptible (PLATE, PC, ACRYLIC, PVC, Aluminum Alloy) Products for Korea Plate April - Established Paju Branch - Partner Company of LGINNOTEC

6 3. Company Outlook Brief History
■ 2009 June - Partner Company of ILJIN Display - Venture Company Certificate July - Dealer of KOSDO October - Capital increase up to W800,000,000 ■ 2010 May - Partner Company of ILJIN June - Partner Company of SK Corporation (Innovation, Energy, Synthetic Chemistry) September - Partner Company of SK Construction November - Dealer of ㈜LS Cable (BUS Duct? and Cable) ■ 2011 May - Partner Company of Oriental Brewery June - Partner Company of ILJIN diamond - Certificate of Innovative Small-and-Medium-Sized Company

7 Technical Marketing Team Resource Marketing Team
3. Company Outlook Organization Chart CEO Vice President Management Team Facility Team Electricity Team Technical Marketing Team Resource Marketing Team Maintenance Human Resources Finance Accounting Design Site Control Quality Control Safety Control Design Site Control Quality Control Safety Control Electric, Semi-conductor, LCD Pharmaceutical Bio, Clean Room, Battery Drying Room Aging Room Dehydrator, VOC Scrubber, Water Hydrating Facilities, Water/Thermal Power Plants, Petrochemical Plants UHP Fitting, Bellows V/V SUS316L BA, EP Regulator Teflon Tube Generator, UPS DVC, Cable, Panel, Bus-Duct

8 4. Business Fields ICR(Industrial Clean Room)
- Clean Room in the semi-conductor plants - Clean Room in LCD,OLED,PDP plants - Extremely sensitive machinery industries - Utility System Design & Construction Clean Room Electric Design & Construction Battery Drying Room, Aging Room and Dehydrator

9 4. Business Fields BCR(Bio Clean Room)
- Pharmaceutical product industries - Food industries - Hospitals (Operation room, Sterile room, ICU) and related sectors - BCR Electric Design & Construction - Utility System Design & Construction

10 W.S.H (Using Water in the Clean Room (using Steam in the Clean Room)
4. Business Fields Water Hydration Before After W.S.H (Using Water in the Clean Room Steam Hydration (using Steam in the Clean Room) From all-time steam hydration To direct water spraying hydration in the Clean Room Effects 1. Less burden for steaming 2. Less burden for cooling dry coils 3. Less CO2 Features

11 4. Business Fields Others
- Power plants, Petrochemical, Gas processing plants - VOC Scrubbers - Semiconductor, LCD and Portable Scrubbers - Design and construction of cold storages - Design and construction of automatic plant controlling system - DI Utility System Design & Construction - Building Utility System Design & Construction - Plant Utility System Design & Construction

12 4. Business Fields Clean Room Power Facilities Illumination Facilities
- Clean Room Illumination Design & Construction - Power Panel Design & Construction - Mcc panel Design & Construction Design & Construction for Extension and Repair Illumination Facilities - Design & Construction for Illumination - Industrial/Residential/Specialty Illumination - Usual Illumination - Solar Illumination Electric Construction Works

13 4. Business Fields Electric Construction Works
Power Facilities in Plants - Substation facility works - Automatic control facilities, leakage detectors - Construction works for electricity transmission, transformation, distribution, and lines - Enlargement works - Installation of automatic control (PLC works) electric panel - Installation of Bus Ducts - Remodeling and maintenance of transformers and substation facilities Electric Installation in Public Facilities - Electric installation works for shopping centers, buildings, apartments, residential houses - Electric installation works for hotels and hospitals - Electric installation works for officetles, churches, public agencies - Electric installation works for offices - Electricity design and construction of intelligent buildings

14 4. Business Fields Electric Construction Works
Electric Installation in Industrial Plants - Electric installation works for petrochemical plants - Electric installation works for hydro/nuclear power plants - Electric installation works for wastewater treatment facilities - Electric installation works for water treatment facilities Installation of Automatic Control Systems - Electric installation works for automatic control system in wastewater treatment facilities - Electric installation works for automatic control system in oil refinery/chemical plants - Electric installation works for automatic control system in power plants - Electric installation works for automatic control system in Di system - Electric installation works for Inverter, plc

15 System Installation (Controlling System)
4. Business Fields Installation of Automatic Control Systems System Installation (Controlling System) Industry automation system (PLC, HMI and industrial communication sectors of Profibus, LonWorks) Motion Control System (Automation concepts for CNC Controllers, Invertors, Motors, Rockwell DRIVE, and Transfer lines) Standard invertors and Industrial motors and High pressure motors and Invertors) Process automation (Field Instrumentation, Analyzing equipments, DCS Application) *** Industry Automation Consulting and Construction *** Process screening and control Power screening system Water treatment system Security Building screening system Illumination control system Integrated production management system Construction of information system of SCADA, MIS, EIS, CIM

16 4. Business Fields Power Transmission and Transformation/
Installation of Automatic Control Systems Power Transmission and Transformation/ Electricity Control Electric Accident Analysis Systems - Transient Fault Recorder Power System Dynamics Monitor Electric system automatic screening and remote controlling system - PC-Based Remote Control System - SCADA System Test Equipments - Portable converter testing equipments - Portable transformer testers - Auxiliary relay testers ESCO-related Systems - Multi-functional integrated power management system - Maximum power demand screening/controlling system Integrated Power Supply/Demand System

17 LASER Processing and Installation of Clean Booth and Air Shower
4. Business Fields LASER Processing and Installation of Clean Booth and Air Shower - LASER Processing Capacity : 0.1t~16t - Manufacturing of precision sheet metal products and covers - Manufacturing of machinery covers - Manufacturing of components for semi-conductor and LCD production lines - Manufacturing of clean room transport equipments Manufacturing and installation of Clean Booth Manufacturing and installation of Air Shower

18 Sales of Pipes/Electric Parts
4. Business Fields Sales of Pipes/Electric Parts - UHP Fitting, Lok Fitting - Bellows V/V, Diaphragm - Regulator, Clean Ball Valve - UHP Gauge, Transmitter - Gas Filter, Multi-Housing Filter - SUS 316L BA, EP Tube, Pipe - Teflon Tube, PFA Fitting, Valve - Generator, UPS, AVR, Panel, Cable, MCCB - Instant Voltage Drop/Power Failure Compensation Equipments (DVC,SP) Bus-Duct - Ultrasonic flowmeter

19 4. Business Fields Thanks to our patent technology “No-Power Vacuum Creation”, this product allows less water volume and high pressure. By inducing pressure difference at water supply, it creates vacuum so that it absorbs air pressure to mix it with water and move to injection holes, which blasts the water due to the air inside it. Users admire the feature of less water with high pressure. [Shower handle – Sitting Type] [Show handle – Standing Type] [Basin Type]

20 Competitive Edge of the Company
4. Business Fields Competitive Edge of the Company Quality Throughout inspection on materials and installation Stable supply of utility Continuous quality improvement Delivery Due EPC Works Daily Report Quick A/S Cost Minimum initial investment costs Energy saving Least operation costs Safety Observation of Safety Principles ZERO Accident Throughout Treatment of Wastes Clean Sites Intensive Management

21 5. Licenses and Certificates

22 5. Licenses and Certificates

23 5. Licenses and Certificates

24 6. Equipments and Facilities
Size Unit Quantity Remarks AUTO WELDING MACHINE CAJON SET 2 TIG WELDING MACHINE INVERTER 500 A and others 6 ARC WELDING MACHINE 7.5KW 4 HAND FORKLIFTR 1 TON AIR PLASMA CUTTING MACHINE 300 A 1 PIPE CUTTIN MACHINE G.F/8”  LEVEL GAUGE 0.02 m/m PIPE THREAD MACHINE _ BENCH DRILL MACHIN 13 m/m CHAIN BLOCK 1TON PARTICLE COUNTER CASER110 H-PRESSURE WATER PUMP HYDRAULIC COMPRESSOR 14SQ~32SQ ELECTRIC COMPRESSOR 14SQ~500SQ HYDRAULIC CABLE CUTTER ELECTRIC CABLE CUTTER ELECTRIC METAL PLATE PERFORATOR 16MM~104MM

25 High and super high pressure
6. Equipments and Facilities Equipment Size Unit Quantity Remarks HYDRAULIC METAL PLATE PERFORATOR 16MM~104MM  SET 1 HYDRAULIC PIPE BENDER 28MM~104MM MANUAL PIPE BENDER INSULATION RESISTANCE TESTER 500V~1000MΩ 1000V~2000MΩ MULTI TESTER General Electric HOOK ON TESTER 300A~800A ELECTRIC DRILL 1/4HP and above ROTARY HAMMER 450W and above ROCK DRILL For crashing CON.C CONCRETE GUN DX C.O.S CONTROL POLE 6M  EARTHING DEVICE Super high pressure 22SQ ELECTROSCOPE High and super high pressure Low pressure

26 High and super high pressure
6. Equipments and Facilities Equipment Size Unit Quantity Remarks DISCHARGE RUBBER GLOVES High and super high pressure SET 2 PROTECTIVE LEATHER GLOVES 1 CAR FOR CONSTRUCTION SITES 1 TON CAR OSTER 16MM~36MM JIGSAW Pistol Type PIPE MACHINE 16MM~104MM  ELECTRIC WELDING MACHINE 3KVA~30KVA CHAIN BLOCK For ACSR CNC LASER CUT M/C 2050*4070 CNC BENDING M/C 4500*220 TON CO2 WELLDING M/C 500A DIGITAL SPOT WELLDING M/C 75KVA SPORT WELLDING M/C CDA & CAM SYSTEM AUTO CAD FILM GUAGE AL.STEEL GLOSSMETER

27 6. Equipments and Facilities
Size Unit Quantity Remarks VERNIER CALIPERS 1000MM  SET 1 VACUUM MOLDER 1100 * 1300 3 SURFACE RESISTENCE TESTER TESTER ELECTRONIC SCALE THICKNESS GUAGE

28 7. Major Clients LG Display LG Innotec SMD SB LiMotive SSLM innovation
energy gloval chemical Oriental Brewery ILJIN diamond ILJIN dislpay

29 8. Business Performances
Customer: SAMSUNG SBLI MOTIVE Location: Giheung, Gyeonggi-do Project Period: ~ Project Name: Illumination and heating works for SBLI Motive Dry Room at SAMSUNG GIHEUNG R&D CENTER (Clean Room CLASS 0.3µM 1,000) Customer: SERVEONE Location: Paju City, Gyeonggi-do Project Period: ~ Project Name: Manufacturing and installation of AIR SHOWER at LG Innotech in Paju (Clean Room CLASS 0.3µM 1,000) Project Name: Manufacturing and installation of 3rd Phase equipments at LG Innotech in Paju Customer: GSNEOTEC Location: Incheon City Project Period: ~ Project Name: Construction of Ara Waterway in Gyeong-in Canal

30 8. Business Performances
Customer: ILJIN Display Location: Eumseong-gun, Chungcheongbuk-do Project Period: ~ Project Name:Improvement and repair works for low voltage boards at the Electricity Room Process transformation works at Thermal Treat Room and Cleaning Room Turn-key works for Clean Room EPC Turn-Key (Embedded equipments, installation equipments, electric works) (CLASS 1,000 , 0.3µM) EXHAUSE Line piping works in the CLEAN ROOM Utility works in the CLEAN ROOM (Electricity, Air, DI, Drain piping) Relocation of CMP process Piping works for cooling water and air of CMP process Relocation of CMP, DMP process Installation works of CMP main cables Project Period: ~ Project Name: Lay-out works for thermal treatment process Project Period: ~ Project Name: Replacement of LBS controlling box and High pressure board FAN

31 8. Business Performances
Customer: Hydis Technology Location: Icheon City, Gyeonggi-do Project Period: ~ Project Name: Water humidifier installation works at Hydis Customer: SK Innovation Location: Yuseong-gu, Daejeon City Project Period: ~ Project Name: Installation of High Temperature Aging Room & Automation Facilities Project Period: ~ Customer: Oriental Brewery Location: Icheon City, Gyeonggi-do Project Period: ~ Project Name: Replacement of air conditioning facilities for the Clean Room at Icheon Factory

32 8. Business Performances
Customer: DONGWOO FINE-CHEM Location: Pyeongtaek City, Gyeonggi-do Project Period: ~ Project Name: Manufacturing and installation of 3W 4000A AL-FEIP42 FEEDER and others (bus ducts) Customer: SSLM Location: Dalseong-gun, Daegu City Project Period: ~ Project Name : Manufacturing and installation of 3W 4000A AL- ALIP54 FEEDER and others (bus duct) Customer: ILJIN diamond Location: Eumseong-gun, Chungcheongbuk-do Project Period: ~ Project Name: Replacement and piping works for water cooling facilities in Factory 1

33 8. Business Performances
Customer: LG Display Location: P7,P8 in Paju City, Gyeonggi-do Project Period: ~ Project Name: Toxic Exhaustion Duct Chamber Drain at P7 4 works including installation of homoiothermic cables Cold/hot water supply piping for heat pumps in P7 Installation of flexible Installation of R&D Room and Lab on 6F of Annex M Layout modification of controlling boards of the integrated warehouses Improvement of exhaustion of smoking rooms on 1F,4F,5F of Annex M Project Period: ~ Project Name: P7 TFT Coater VCD Pump Hook-up P7 TFT ULVAC Sputter Dry Pump Hook-up Installation of CR emergency drain facilities in P7/P8 Hook-up works for TFT eyeball cleaner in P7 Addition of ADP TDET Chamber in P7 Project Period: ~ Project Name: Alteration of FPHT Oven Exhaust in P7 Installation of PFC exhaust back-up ducts in P7 Power supply works for TFT Glass Edge Crack tester in P7 Piping works for CR spray-type humidifying facilities in P7 Removal works of C/R Coater general exhaust pipes in P Addition of Block Repair Shop UT on B2F in P7

34 8. Business Performances
Customer: LG Display Location: Paju City, Gyeonggi-do Project Period: ~ Project Name: New chamber for Paju Test Team on 2F of Annex M Hook-up electricity works Hook-up works to install depressurizers on 2F of Annex M Hook-up and configuration works for UV division orientation equipments on 6F of Annex M Hook-up works for Lab of R&D Center on 6F of Annex M Hook-up works of wrapping machines for warehouse on 3F of Annex M Removal of organic drain pipes on 5F of Annex M Hook-up works of translucent IPS equipment N2 for R&D Center of Annex M Project Period: ~ Project Name: System upgrades for waste heat collection in Paju Factory Project Period: ~ Project Name: Environmental facility works for Paju LG AP2 DI SYSTEM (Piping works) Project Period: ~ Project Name: Manufacturing and installation of P8E P-GAS DUCT

35 8. Business Performances
Customer: LG Display Location: Paju City, Gyeonggi-do Project Period: ~ Project Name: Installation of P8 TFLI #0318 Steam Macro UT Footrest for pipe reinforcing Hook-up works of high temperature Ch. Exhaust for Reliability Lab of Annex M in Paju Hook-up works of UT for additional Gate Strip equipment HPMJ in P7 Installation of pipes to drain condensation water from C/R toxic exhaust ducts in P7 Removal of unused CDA pipes of Unit 1 for outside packaging on 4F of Annex M in Paju Project Period: ~ Project Name: Replacement of FRP Fan Impeller in Paju Factory Replacement of OAC Check Damper in P7 Project Period : ~ Project Name : Vacuum separation works of POL Panel Replanter/POL Absorption stage of Annex M in Paju Project Period : ~ Project Name : Hook-up works to install CF CP(Unit No. 16) and Robot in P7 Construction of CR at P7 CF CP(Unit No.16) in Paju(ACP) Installation of P8E TWED#01 at lower ACP in Paju (ACP) Project Period : ~ Project Name : UT Hook-up works of High Temperature Oven and C/F Oven for R&D Center on 6F of Annex M in Paju Installation of P8E TFT PHT,CVD,SPT,STR equipments at lower Configuration works to accommodate G2 Slit Coater at R&D Center on 6F of Annex M in Paju

36 8. Business Performances
Customer: LG Display Location: Paju City, Gyeonggi-do Project Period: ~ Project Name: Digitization of production exhaust in Paju Factory (Installation) Installation of AP2E2 AGV Line FFU and relocation of florescent lamps (Electricity) Project Period: ~ Project Name: Expansion of CR for #512 PCB extension in CR on 5F of Annex M in Paju Project Period: ~ Project Name: Installation of UT to provide Manual Thinner to P8E+ No.5 Hook-up works for exhaust drain for AP2 CELL Material Combination Room in Paju Improvement works for water humidifying process in P7 Installation of CDA at Panel Electro-Optics Test Room on 6F of Annex M in Paju Installation of power outlets for ADJ PC Rack at P8 SDI Line #03 Relocation of test equipments in idle areas of P8 TFT Project Period: ~ Project Name: Removal and installation of SDI Line #03 ACP for relocation of P8 INKJET Configuration works of He Lines for AP2 TFT Ion Doping Leak Check in Paju Installation of P83 CELL Gap Line #1,#2 at lower ACP (ACP) Project Period: ~ Project Name: Installation of P82 CR1F Cell Material Storage Room (ACP)

37 8. Business Performances
Customer: LG Display ㈜ Location: Paju City, Gyeonggi-do Project Period: ~ Project Name: Removal of ACT and installation of doors at P7 TFT lothographer flow lines Additional works to reuse P82 CDA condensation water Installation of upper skirts for P7 FSPT#2 Project Period: ~ Project Name: Installation of H-Beam for maintenance of DI in Paju Installation of iron stairs at Paju DI HERO Cleaning Tank Urgent removal and reinstallation of P7 TFT 1F TSPT#17~TWET#03 ACP Project Period: ~ Project Name: Installation of H-Beam for maintenance of P8 DI Configuration upgrading works according to addition of replanting functions on P8 CRPR01 (ACP) Installation of ring blowers in P7 TFT Ph.2 Lift C/V Installation of drain ports in relation to leakage from P81 FPHT#01 PRB exhaust pipes UT H/U for new product analysis equipments in Lab on 6F of Annex M Urgent connection works of WET#5,7 of AP2 TFT Photo Team in Paju Installation of additional vacuum lines for distortion in P81 C/F Oven Robot GLS Additional urgent hook-up works for P83 TSPT#2 Ar Gas Urgent works for UT for additional equipments of E2-1 Line Face Seal in Paju Additional CO2 piping works for WET#5,7 of AP2 TFT Photo Team in Paju Additional works for P83 TSPT02 Ar Gas (Urgent)

38 8. Business Performances
Customer: LG Display ㈜ Location: Paju City, Gyeonggi-do Project Period: ~ Project Name: Correction works on P7 TCVD#1,2 ACP Doors (ACP) Project Period: ~ Project Name: Replacement of hinges of Paju AP2 East ACP Doors (ACP) P82 CF Zone lower ACP and zinc finishing works (ACP) Project Period: ~ Project Name: Removal and reinstallation of hatch rack for equipment accommodation in P8 Factory Project Period: ~ Project Name: Installation of H-Beam for maintenance of DI in Paju Additional installation of CDA on Line 501 on 5F of Annex M in Paju UT works in relation to modification of Beam Lines for AP2 TFT ELA crystalization equipments in Paju CDA Hook-up to supply AP2 DE #5 Ionizing A/K in Paju CR configuration works to accommodate Fluid injection a-equipments in R&D Center on 6F of Annex M in Paju Project Period: ~ Project Name: CR configuration works to accommodate Fluid injection a- equipments on 6F of Annex M in Paju Project Period: ~ Project Name: Installation of P83 TCVD #3,5,6 power outlets Installation of ACP between P82 RB#1,2 Line Un-Loader Ports Installation of ACP between P82 PI#1 Line Un-Loader Ports

39 9. Map Headquarter

40 9. Map Paju Branch 473-1, Geumseung-ri, Tanhyeon-myeon, Paju City, Gyeonggi-do Phone : FAX : 파주 지사 : 경기도 파주시 탄현면 금승리 471-3번지 TEL: FAX:

41 Bestec E&C Co., Ltd. Thank you..!


Download ppt "Contents Application for Participation 1 Greetings 2 Company Overview"

Similar presentations


Ads by Google