Download presentation
Presentation is loading. Please wait.
Published byBlaise Jordan Modified over 5 years ago
1
February 19 May 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: LECIM-IG Closing Report for Beijing May 2010 Date Submitted: May 2010 Source: David Howard, On Ramp Wireless Contact: David Howard, On Ramp Wireless Voice: +1 (858) x221 , Re: LECIM Closing Report for May 2010 Session Abstract: LECIM Closing Report for Beijing Purpose: Information to WG Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Slide 1 David Howard, On Ramp Wireless
2
Low Energy Critical Infrastructure Monitoring
May 2010 Low Energy Critical Infrastructure Monitoring Presentations made on Container Tracking Application ( ), process for new projects, and Low Energy Critical Infrastructure Monitoring ( ) Started an applications requirement matrix leading to a technical requirements overview ( leci) David Howard, On Ramp Wireless
3
LECIM IG Three application presentations
May 2010 LECIM IG Three application presentations Requested two meeting slots at the next Plenary session in San Diego 21 attendees at the Monday meeting Will request Tutorial slot at San Diego Will request to move to SG status at San Diego David Howard, On Ramp Wireless
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.