FIRESIDE CHAT February 27, 2012. Pews Ratigan-SchottlerPioneer Refinishing Delivered/Installed Solid Oak PewsStrip/refinish$42,200 597 – 42 pewsReplace.

Similar presentations


Presentation on theme: "FIRESIDE CHAT February 27, 2012. Pews Ratigan-SchottlerPioneer Refinishing Delivered/Installed Solid Oak PewsStrip/refinish$42,200 597 – 42 pewsReplace."— Presentation transcript:

1 FIRESIDE CHAT February 27, 2012

2 Pews Ratigan-SchottlerPioneer Refinishing Delivered/Installed Solid Oak PewsStrip/refinish$42,200 597 – 42 pewsReplace kneelers$13,000 Total$57,392$55,200 deduct (assist)($1,319) Tax(6%)$ 3,364.38$ Pew sponsorship – $1,500 per pew (38)

3

4 Gunder Church Furniture $53,256.36 Includes delivery, installation, & taxes Requires two people to assist installers

5 CARPET Hanson FurnitureZems Furniture Carpet/glue$14,066.76$10,830.07 (with $950 rebate) Installation/demolish$ 4,870.00$ 3,820.50 Plus tax$ 1,193.21$ 879.03 The sanctuary needs new underlaymentDoes not include to glue carpet direct, the altar may needremoval. it also. The two long steps need repair.

6 Conrad-Schmitt $150,000 - $206,000 (Mural in the of sanctuary and front wall, if done separately, will cost $94,380.) Decorate all plastered surfaces above the main floor of St. Lawrence to include sanctuary, nave, balcony, and narthax, not stairways or vestibules. 23kt gold leaf to be applied in different locations within the church. With mural of God the Father receiving His Son, the bid would be $178,380, which includes the fiberglass covering of the large cracks. Without the mural, deduct $10,000. Additional $28,310 to fiberglass all large flat wall and ceiling surfaces with an 18 mil thick polymer coat. All large cracks will be routed out, caulked and covered with fiberglass mesh. Large living cracks may reappear, but this is the best procedure to prevent any recurrence.

7

8

9 RIEHLE $120,000 - $175,000 + taxes (Art work of sanctuary and front wall, if done separately, will cost $80,000.) Decorate all plastered surfaces above the main floor of St. Lawrence to include sanctuary, nave, balcony, narthax, and stairway. Install polymer system to all walls and ceilings. Furnish steel scaffold. Owner to unload and load scaffold. Custom made reredos