Rack 1: 55 – 9 Rack 2: 46 – 6 Rack 3: 55 – 9 Rack 4: 55 – 9 Rack 5: 55 – 9 Existing Peacekeeper Storage Judy Clarke – 66750 or Lisa Kramer - 67599 S.P.A.C.E.

Similar presentations


Presentation on theme: "Rack 1: 55 – 9 Rack 2: 46 – 6 Rack 3: 55 – 9 Rack 4: 55 – 9 Rack 5: 55 – 9 Existing Peacekeeper Storage Judy Clarke – 66750 or Lisa Kramer - 67599 S.P.A.C.E."— Presentation transcript:

1 Rack 1: 55 – 9 Rack 2: 46 – 6 Rack 3: 55 – 9 Rack 4: 55 – 9 Rack 5: 55 – 9 Existing Peacekeeper Storage Judy Clarke – or Lisa Kramer S.P.A.C.E Weld Sample Prep L.. Gumms or S. Parry – Space 502 or F. Eastman Existing Eye Wash and Battery Charger – Relocate per new layout Breakdown 20 Ft. High Racks, Palletize and Relocate to Canoga Park, B001.- Racks 1,2, 3, 4 & 5 Remove chain-link fence from behind Rack 1 Disconnect Fire Lines Back to Nearest Valve or Cap Remove Existing Chain-Link Fence ~ 27 – 0 ~ 37 – 0 N 25 – 0 24 – 0 1 B106 & B131 Layout and Requirements

2 Kitting N ft. Bays = 18 – 9 3 – 9 ft. bays = Rack 6 Rack 7 FCFC Rack 8 Rack 9 F F RemStar PP c WB CC Visual CC CCCHC Visual C C WB Shear Work Area Foot Print Shear Ht = 7 2 Break 11 x 3 Break 7 x 3 5 x 12 Table c 4 x 8 C- Table WT MCC C p Scooter Loading Zone 8 x 12 Office Raymond & Incoming Kitting G SWSW TB CH 24 x 48 Chemical C 24 x 48 Cabinet TB 24 x 48 Tool Box WB 30 x 60 Work Bench & Chair WT 30 x 60 Work Table 12 x 36 Racks / Shelves C Computer, Provide Wall Counter Top G Grinder P 4 ft. sq. Pallet SWSW Spot Welder FCFC Fire Cabinet c Cart 24 sq. Cabinet WB p 24 sq. Printer 24 x 60 Cabinet C Work Table 4 x 8 C Computer 6 x 8 Cubicle 2 B106 & B131 Layout and Requirements

3 Kitting N ft. Bays = 18 – 9 3 – 9 ft. bays = Rack 6 Rack 7 FCFC Rack 8 Rack 9 F F RemStar PP c WB CC Visual CC CCCHC Visual C C WB Shear Work Area Foot Print Shear Ht = 7 2 Break 11 x 3 Break 7 x 3 5 x 12 Table c 4 x 8 C- Table WT MCC C p Scooter Loading Zone Office Raymond & Incoming Kitting G SWSW TB WB A 110 V Receptacle IT/ DATA / Telephone Receptacle Air – Provide Wall Mounted Reel, Air Line Shall Reach center of 5 x 12 Table C Work Table 4 x 8 Cubicle AA 3 B106 & B131 Layout and Requirements

4 N 3 – 9 ft. bays = Rack 6 Rack ft. Bays = 18 – 9 Rack 8 Rack 9 WT F S B E F S B E 36 x 6 Relocated WT IT/Data/Electrical 15 w x 2 d File Sealer - Relocated Electrical Battery Charger - Relocated Electrical Splash Barrier - Relocated Eye Wash - Relocated Relocated Racks - Same height x 4-shelves Maintenance Side – 2 bays Warehouse Side – 3 bays 1-hour wall construction – Metal Stud/Gypsum wall Doors Coil door – 25 ft w x Configured per PWR Standard RL Personnel Door – 3 x 7 Solid Core Door 20 Min. Door closure Key Swipe 4 B106 & B131 Layout and Requirements

5 \ 1 spc = ft ~136 – 0 ~50 – 9 ~9 – 9~31 – 10.8~7 –9.5 ~18 – 1~15 – 10~31– 7 ~21– 7 ~16 – 4 (E) Building 131 Floor Plan 1 Electrical Light fixtures, tubes, cover plates, disconnects, etc. 6 Lista / 9 drawers 5 Cabinets 2 – 11 x 3 shelf racks 1 Fridge (batteries) 2 Plumber 1 Pipe cutter 1 Lista / 5 drawers 4 Cabinets shelf rack (pipes) 3 Bruce Bertea shelf racks Storage 4 Explosives 4 steel vaults 1 cabinet (smaller room) Humidifiers (smaller room) 5 Dowling Misc. Cabinets / Rack 6 Brian Nakasone D911 (Misc. Cabinets < 8 ft. clear space to eave ~6 4 T plaster wall 3 – 7 3 – 0 12 CMU 6 CMU 5 – 0 3 – 4 Chain Fence Face to Face 1.Remove all building contents and locate within roadway between B113 and B131, block both ends of roadway to traffic. 2.Contents will be assessed and reduced by PWR Maintenance 3.Contractor shall reinstall per layout into B131 5 B106 & B131 Layout and Requirements

6 1 Spc. = 1 ft. Min Door Ht. Clear =86.5, 94, 97.5 South to North N w x 24d x 72h cab 42w x 105L x 97h x 4 s rack 60w x 48d x 54h blast cab Hum & De-Hums 48w x 24d x 77.5h gun safe 39w x 38.5d x 37.5h Lista 84L x 30d x 37.5h table with end rolling Listas 72L x24d x 58.5h x 3s rack 18 x 36.5 U-cart 25.5 x 40 U-cart 23w x 45d pipe threader Tri-pod – pipe cutter Tricycle 36w x 20d x 60h cab 36w x 18d x 60h cab 36w x 24d x 78h cab 16.5L x 4w x 6h x 3 s rack 45w x 22d x 48h rolling cart 48w x 24d Greenlee cart 64w x 32d rolling cart 28 x 28 x 59.5h Lista 38w x 24d x 72h cab 30w x 72L x 42h table with end 28w Lista cab 32w x 20d x 41h Ki rolling cart 12 x 12 benders container F F 28 x 27d x 65.5h Fridge - Batteries 1234 (E) Building 131 Equipment Layout 6

7 1 Spc. = 1 ft. Min Door Ht. Clear =86.5, 94, 97.5 South to North N 36w x 24d x 72h cab 60w x 48d x 54h blast cab 48w x 24d x 77.5h gun safe 39w x 38.5d x 37.5h Lista 84L x 30d x 37.5h table with end rolling listas 18 x 36.5 U-cart 25.5 x 40 U-cart 23w x 45d pipe threader Tri-pod – pipe cutter Tricycle Insulation & Filters & Tiles 16.5L x 4w x 6h x 3 s rack 45w x 22d x 48h rolling cart 30w x 72L x 42h table with end 28w Lista cab 32w x 20d x 41h Ki rolling cart New Building 131 Equipment Layout Wire & Conduit 8 ft. Lamps & Fixtures WB Conduit & Pipe Future 9L Rack 94 Rack Lay Down 110 V Receptacle – 4 plug WB Work Bench IT/ DATA / Telephone Receptacle Future 9L Rack 24 x 48 Heavy Duty Cabinets (1 ea. – E ) 24 x 60 Heavy Duty Cabinets (4 ea. – E ) Future Fridge – short unit Heat / Conditioned Air Wall Unit 12d x 3L storage racks 186 Rack 96 Rack 7 B106 & B131 Layout and Requirements

8 \ 1 spc = ft ~136 – 0 ~50 – 9 ~9 – 9~31 – 10.8~7 –9.5 ~18 – 1~15 – 10~31– 7 ~21– 7 ~16 – 4 Building 131 Floor Plan - Doors < 8 ft. clear space to eave ~6 4 T plaster wall 3 – 7 3 – 0 Exist. 12 CMU Exist. 6 CMU 5 – 0 3 – 4 New 6 ft high Chain Fence Face to Face New 3 x 7 double doors with view panel Cane bolt on inactive leaf Weather Stripping Passage set New 3 x 7double doors with view panel Cane bolt on inactive leaf Weather Stripping Passage set New 3 x 7double doors with view panel Cane bolt on inactive leaf Weather Stripping Lock set Replace Existing door with same size. Provide view panel Provide Lockset Weather Stripping Replace Existing door (2) with same size. Provide view panel Provide Lockset Weather Stripping New 3 x 7double doors with view panel Cane bolt on inactive leaf Weather Stripping Passage set 8 B106 & B131 Layout and Requirements

9 B106 Existing Locker Area 9 B106 & B131 Layout and Requirements