CMPC Project Metso Automation 2 nd Align Meeting 739 - DCS Scope October, 23th/24th - 2013.

Similar presentations


Presentation on theme: "CMPC Project Metso Automation 2 nd Align Meeting 739 - DCS Scope October, 23th/24th - 2013."— Presentation transcript:

1 CMPC Project Metso Automation 2 nd Align Meeting 739 - DCS Scope October, 23th/24th - 2013

2 © Metso CMPC Project - 2 nd Align Meeting Agenda 2 1.Accomplishments on the project to date: August/13 KOM(Kick-of-Meeting) and Definitions meeting accomplished according to the agenda. Review of documentation to be delivery to CMPC in the period. Engineering of DCS Network has started. Engineering of DCS Hardware and Cabinets has started. Review of DCS documentation templates and criterias to be used by EPCs (I/Os, database, etc..). September/13 Delivery of documentation of September´s period. Satisfactory workflow of revisons of documentation (Dochotel / Metso / CMPC / Poyry). Purchased Order from Furnitures and Video-Wall issued by CMPC. KOM (Kick-of-meeting) with All Process Areas. October/13 Workshop of metsoDNA to CMPC people. Review of Schedules. Coordination Meeting.

3 © Metso CMPC Project - 2 nd Align Meeting Agenda 3 2. Relevant items during the period: August/13 KOM with Chemetics (Chemical Plant scope) - Aug,07th-2013 in Porto Alegre. DCS – KOM with CMPC (DCS scope) - Aug,08th/09th-2013 in Guaiba. 1st Align Meeting with CMPC and EPCs - Aug,06th/07-2013 in Porto Alegre. KOM with Veolia (Waters scope) – Aug20th-2013 in São Paulo. CMPC meeting with EPCs em Porto Alegre – Aug,14th-2013 in Guaiba. CMPC has visited similar Pulp Mill supplied by Metso - Aug,21st/22nd-2013 in Imperatriz/MA. Internal meeting with Metso Automation and Metso Paper – Aug,05th-2013 in Araucária. September/13 Support for MP in an CMPC meeting related with eletrification package, W36, in Guaiba, items: 1.Requested a KOM with Siemens (suported by CMPC and MP) for templates issues. 2.Defining Profibus Network Topology. (still open). Internal meeting betewen MASOR(Sorocaba) and MATRE(Tampere), W37 in Finland. DCS Technical meeting – Sept,24th/26th-2013 in Guaiba. KOM with MP for all areas under MP scope – Sept27th,2013 till Oct,02nd,2013 – Aruacária. October/13 Internal KOM for drying machine (PDUs) related with dedicated systems.

4 © Metso CMPC Project - 2 nd Align Meeting Accomplishments on the project to date - Engineering 4 Internal Engineering: -Typicals for Cabinets -Remote Cabinets -Centralized I/O Cabinets -Power Supply Cabinets -PC/Server/Switchs Cabinets -Definitions -Functional Specification for HW and SW -System Architeture -Apendix 4 - docs

5 © Metso CMPC Project - 2 nd Align Meeting Accomplishments on the project to date – Proc. & Manuf. 5 1 Agreements and deals done: FURNITURESVIDEO-WALL 2 Under Negotiation: Cabinet ManufactureDCS Cabinets Assemblying SW/APL PartnerInstallation Company

6 © Metso Remote Cabinets CMPC Project - 2 nd Align Meeting Visit of similar Pulp Mill project by CMPC – Aug/13 6

7 © Metso Control room 7 CMPC Project - 2 nd Align Meeting Visit of similar Pulp Mill project by CMPC – Aug/13

8 © Metso CMPC Project - 2 nd Align Meeting Update on Align actions from Align #1 8 KOM, internal and EPCs were done properly as planned.

9 © Metso CMPC Project - 2 nd Align Meeting Schedule Update – Engineering S Curve 9

10 © Metso CMPC Project - 2 nd Align Meeting Schedule Update – Main Project Milestones 10 Receiving data from EPCs for DCS eng. between Aug. 2013 – Feb. 2014 System Network- and HW engineering between Aug. 2013 – Jan. 2014 Manufacturing and internal tests between February – April 2014 DCS HW FAT tests between May – July 2014 SW applications work and internal tests between January – August 2014 APT ( SW FAT ) tests between July - October 2014

11 © Metso CMPC Project - 2 nd Align Meeting Project manpower chart 11

12 © Metso CMPC Project - 2 nd Align Meeting Issues and Concerns 12 In this phase of the project engineering and procurement, not any concerns or major issues.


Download ppt "CMPC Project Metso Automation 2 nd Align Meeting 739 - DCS Scope October, 23th/24th - 2013."