Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status Sunet CTO meeting in CPH 2014. eduID In Production Integration with Min Myndighetspost (mina meddelanden) Early adopters: ̶Antagning.se ̶VR PRISMA.

Similar presentations


Presentation on theme: "Status Sunet CTO meeting in CPH 2014. eduID In Production Integration with Min Myndighetspost (mina meddelanden) Early adopters: ̶Antagning.se ̶VR PRISMA."— Presentation transcript:

1 Status Sunet CTO meeting in CPH 2014

2 eduID In Production Integration with Min Myndighetspost (mina meddelanden) Early adopters: ̶Antagning.se ̶VR PRISMA

3 Cryptech

4 Project tools Project management and collaboration Tender in phase 3 – competetive dialogue

5 Lecture Capture Enterprise youtube in the cloud Integration with LMS systems Contract negotiation ongoing with Kaltura

6 Concession for mobility in GN3 Based on experience from HEANET Procurement like process Dante procurement leading SUNET pilot with 5 NRENs in Europe Vision: A Sunet mobile bought at shop in town

7 IAAS & BAAS NDN framwork with IPNETT Working on a Sunet business model


Download ppt "Status Sunet CTO meeting in CPH 2014. eduID In Production Integration with Min Myndighetspost (mina meddelanden) Early adopters: ̶Antagning.se ̶VR PRISMA."

Similar presentations


Ads by Google