Presentation is loading. Please wait.

Presentation is loading. Please wait.

HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011.

Similar presentations


Presentation on theme: "HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011."— Presentation transcript:

1 HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

2 IVF-Development & Improvement PROGRESS PROJECTDATELINESTATUS Gas connection to machine--- Nasir 4 NOVWAITING FOR GAS SUPPLIER Anaest Machine--- Ahmad 19 NOVBrochure & quotation acquired

3 IVF- Development & Improvement ACTIVITIES PROJECTDATELINESTATUS IVF TALKOCT 29 NOV 2 NOV 9 DONE –23 attended 2 ND BATCH 3 rd BATCH (namelist with Diana) FREE AD - FACEBOOK OCT 28DONE LPPKN VISIT (by NOV 9) Draft letter---NOV 2 Call to make appt ---NOV 2 DONE by Bella (see email) GP VISITOCT 28---GP @ PG & Masai area NOV 1---GP @ PG & Masai area NOV 4---GP @ Tmn U & Skudai area NOV 15---GP @Kota Tinggi area NOV 17--GP @ Johor Jaya & Permas area NOV 23---GP @ JB area DONE Rescheduled

4 IVF-Development & Improvement PROJECTDATELINESTATUS DIGITAL MARKETING BY EMAIL (by NOV 10) Get data frm kpp & Medilink NOV 1 Draft email NOV 2 DONE-- Data acquired PUBLIC BOOTHTESCO SERI ALAM NOV 12 BULK MAILING– NGO (by NOV 16) Draft letter & IVF leaflet job order NOV 11 DIGITAL MARKETING BY TELEMARKETING (FOLLOW-UP) (by NOV 25) Get data frm dept NOV 14 Data tracking NOV 18

5 GP VISIT 28 OCT 2011 AIR BIRU PASIR GUDANG POLIKLINIK PENAWAR---DR SHUKOR POLIKLINIK SEJAHTERA---DR ZURAIDAH POLIKLINIK ROZIKIN---DR ZAIDAH (locum)

6 FREE AD ---FACEBOOK

7 OCT 2011 IMAGING DEVELOPMENT

8 NEW GENERAL X-RAY SITE PROGRESS COMPLETED # BARIUM PLASTERING # LEAD GLASS FRAME # WALL AND FLOOR TILE AT CONTROL AREA # LEAD DOOR

9 NEW GENERAL X-RAY LEAD DOOR & BARIUM PLASTER LEAD GLASS FRAME

10 NEW GENERAL X-RAY WALL & FLOOR TILE @ CONTROL PANEL FLOOR TRUNKING

11 NEW GENERAL X-RAY IN PROGRESS # FLOOR TRUNKING # TOILET DOOR # ELECTRICAL JOB # CEILING

12 NEW GENERAL X-RAY CONCEPT # LAMINATE CEILING # FLOORING – VINYL # WALL – FANCY PAINTING COMPLETION DATE : 15 NOV 2011

13 NEW GENERAL X-RAY LICENSE STATUS : LULUS BERSYARAT # 25/10/11 KKM submission 1.APC Dr Nachiappan 2.APC Dr Zukri as Penyelia 3.Floor plan PP Masai as a new place for Old X-Ray 4.Dr Marlina time table

14 NOVEMBER 2011 HOSPITAL PENAWAR

15 NEW ENT

16 CONFIRM TO BUY LIGHT SOURCE U9112 GL 350-5A PRICE RMB 4296 2 LAMP XENON & HALOGEN INCASE BREAKDOWN WE CAN SELECT 2 ND LAMP ILLUMINATION >2000000LX CAMERA SYSTEM U9226 F-168D PRICE RMB 17491 SCANNING STANDARD 600 LINES CAMERA HEAD 1.3 SONY WATERPROOF OUTPUT : BNC, Y, C, RGB, DVI, USB

17 SUPPLIER CONTACT NAME –Colin Zhuang ADDRESS –Shanghai Medical Instrument Impt.&Expt.Co.,LTD Tel: +86-021-65951875 Fax: +86-021-65951876 Mobile:86- 13816132537 Email:yttkno@hotmail.com,Colin.Z@smicc.co m Website:www.smicc.com

18 ACTIVITY PROGRESS PROFORMA INVOICE NEEDED –31/10/2011 –USD 6575.00 PURCHASE ORDER –DONE 1/11/2011 TT PROGRESS –PASS OVER TO ERIN –1/11/2011 TARGET TT COMPLETE –21 NOVEMBER 2011 ( WAITING EN AZIZAN )

19 CCTV DEVELOPMENT

20 Purchase of material: Avtech Dome Camera (RM95.00 x 10 unit) = RM950.00 CCTV cable (2 box)+ Cable Power (2 box)= RM390.00 BNC Connector & other equipment= RM226.50 H/disk 500gb+Connecter DC 30pcs= RM345.00 DVR= RM0.00 Monitor + Bracket= RM405.00 Power DB 5AMP (3 unit)= RM540.00 TOTAL= RM2,856.50 APPROVED BUDGET= RM3,100.00

21 MATERIAL PURCHASED

22

23 SCHEDULE PROGRESS Work done24-30 Oct31-6 Nov7-13 Nov -PlanningDone - DrillingIn progressDone - Cable installation: *Lift A *Lift B Not started yetIn progress -Camera installation: *Lift A *Lift B * * - Camera replacement (2 unit)* - System test*

24 Drilling LIFT A

25 Drilling LIFT B

26 PARADE IMPROVEMENT

27 CURRENT LOCATION

28 NEW LOCATION

29 THIS WEEK TARGET Start on 4 November 2011: - P.A. system ready to use. - new location (Directors parking lot) - parade commander on stage - record by CCTV – David to change CCTV view - QC will in-charge for the parade until further notice Content: - Pemeriksaan perbarisan (attendance/uniform) - Takhlim - Current issues

30 LADY O&G 2 nd ENT CLINIC 1 November 2011 Gee / CS Team

31 LADY O&G # Target October ~ 150 outpatient / 30 inpatient # Achievement for October 1.Dr.Norlela ~ 25 outpatient / 1 inpatient 2.Dr.Geetha ~ 10 outpatient / 0 inpatient # Failure to achieve target: 1.Attendance & commitment lady O&G doctor. 2.Night clinic & Sunday clinic by resident doctor ( Dr.Suhaimi ) close.

32 LADY O&G Dr.Norlela 4 Oct9 o/p 6 Oct5 o/p 11 Oct9 o/p ~ 1 i/p 13 Oct2 o/p 18 OctOn leave 20 OctOn leave 25 Oct – 30 NovOn leave

33 LADY O&G Dr.Geetha 1 Oct1 o/p 2 Oct0 o/p 8 OctOn leave 9 OctOn leave 15 Oct2 o/p 16 Oct3 o/p 22 OctEmergency leave 23 OctEmergency leave 29 Oct4 o/p 30 Oct ( Dr. Han Sok Kit )0 o/p

34 LADY O&G # Target November ~ 150 outpatient / 30 inpatient # Target performance measures: 1. Full commitment from lady O&G ~ Night clinic open 6-10pm @ by Dr.Geetha ~ Sat/Sun clinic open 9-1pm @ by Dr.Geetha 2. Replacement lady doctor if Dr.Geetha emergency leave; @ Dr.Han Sok Kit (010-7171151) or MO under Dr.Geetha

35 LADY O&G 3. Activities by CS Department ProjectDatelineStatus 1. Banner installation1 NovDone 2. Roster by Medical Unit31 OctDone 3. Digital Marketing by SMS4 Nov- sorting data from Kpp - HP data - done 4. Digital Telemarketing Delivery11 Nov- sorting data from Kpp - HP data - done 5. Website Update Delivery Package & Lady O&G 2 Nov- Draft done 6. Visit GP Clinic1 Nov 8 Nov 15 Nov 17 Nov 23 Nov - PG & Masai area - Taman U & Skudai area - Kota Tinggi area - Johor Jaya & Permas area - JB area

36 LADY O&G Comparison Total Patient O&G Month 2011 Dr.Suhai mi Dr.NorlelaDr.GeethaTotal July493 August382823413 Septembe r 3872431442 October4562610492

37 LADY O&G – Colposcopy (3 Oct 2011)

38 LADY O&G - clinic

39 LADY O&G - ultrasound

40 2 nd ENT CLINIC Waiting for new light source & camera set @ incharge by Ahmad ~ 31 October 2011 @ no progress

41 2 nd ENT CLINIC (3 Oct 2011)

42 2 nd ENT CLINIC – work station (3 Oct)

43

44 Try to contact and visit Dialysis Center to find out SRN with Dialysis Certificate. Progress: -Already approach SRN Rohana (ex- staff HP) but she demand for salary up to RM3K. -Interviewed SRN done on 15 th October 2011with Matron Marziah. - Candidate experience at Kulai Rotary Dialysis Centre – 6 month

45 NODIALYSIS CENTREVISITING/ CALL STAFFINGREMARK 1BP RENAL CARE (RENGIT) SDN BHD Visit3 SRN, 2 AIDE1 – Post Basic Renal-For licensing 2Johor Quarries Association Dialysis,Johor Jaya Visit8 SRN2 – post Basic Renal – 1 for licensing 3Prima Dialysis Centre, Masai Visit4 SRN- 1in charge for license 1 – Post Basic Renal – 1 for licensing 4Nefro Utama Sdn Bhd, Bandar Baru Uda Call10 SRN2 – Post Basic renal – 1 for licensing 5Pusat rawatan dialisis yayasan pembangunan keluarga,permas jaya Call10 SRN 4 AIDE3 – post Basic renal - 1 license, 2 (bond)

46 NODIALYSIS CENTERVISIT/CALLSTAFFINGREMARKS 6JB- Lions Medical Charity, Taman Sri tebrau Call5 SRN, 2 Aide 1 – SRN Post Basic 7JJ Lion Dialysis centre, Taman Johor Jaya Call3 SRN, 1 Aide No Post Basic

47 Requirement from NKF Fees RM 4,500.00 Duration Period of training is 6 months Entry Requirements Must be a registered staff nurse/medical assistant, preferably with 6 months working experience in a haemodialysis unit Must have full secondment and a form of endorsement from their relevant authority Hepatitis Status – must be negative * Intake on January and August every year

48 MOH Requirement Fees RM 3,500.00 Duration Period of training is 6 months Entry Requirements Must be a registered staff nurse/medical assistant, preferably with 6 months working experience in a haemodialysis unit Hepatitis Status – must be negative Closing date for course intake January12 - September * Intake on January and July every year

49 NEUROSURGERY

50 PROGRESS Letter to Director of Hospital Sultanah Aminah ready and prepared by Pn Hjh Norizan. Will send the letter to Director on Thursday 01 st November 2011

51 PROGRESS Letter already send and pass it to Ms Hafilna PA, of Director, Hospital Sultanah Aminah by Tuesday -01 st November 2011. Will follow up with her to get approval for attachment.

52 MAINTENANCE RESOLVE 90% SEPTEMBER

53 Reference from M.O.D September report Sekeliling bangunan No. Report date Report Status 1 16/9/2011 Air sinki café berlimpah ok 2 16/9/2011 Sampah banyak di kaki lima The Shoppe 3 16/9/2011 Mentol lampu pintu masuk hadapan tiada ok 4 16/9/2011 Lampu taman depan The Shoppe terbakar 5 16/9/2011 Lampu taman main entrance tak hidup ok 6 16/9/2011 Sebahagian Galery terlindung dengan bahan projek ok 7 20/9/2011 5 bulb lampu tiang terbakar ok 8 20/9/2011 A&E bulb terbakar ok 9 20/9/2011 Bumbung laluan kaki dari kafe tanggal ok 10 21/9/2011 Puntung rokok bertaburan dari The Shoppe ke A&E

54 11 21/9/2011 Longkang tepi Genset kotor 12 21/9/2011 Puntung rokok di gazebo bertaburan 13 21/9/2011 Tandas A ground floor kotor 14 22/9/2011 Habuk di perabot dan bingkai tingkap 15 22/9/2011 Aircond not function well in ground floor ok 16 24/9/2011 Barang-barang Hari Raya Open House belum dikemaskan. 17 26/9/2011 Kucing berkeliaran di kafe 18 26/9/2011 Hos getah tidak digulung kemas di kaki lima 19 27/9/2011 Lampu depan Imaging department rosak ok 20 28/9.2011 Lampu di kafe tak berfungsi ok

55 Reference from M.O.D report september Ground floor 21 16/9/2011 Penutup pam tandas A tiada in progres 22 16/9/2011 Lift B - lantai kotor 23 22/9/2011 Habuk di kebanyakan tempat 24 24/9/2011 Lampu A&E tak hidup ok 1st floor 25 20/9/2011 Candle light di tangga Classic Clinic not fctn ok 26 20/9/2011 Women & Child toilet - pipe leaking ok 27 20/9/2011 Downlite Women & Child - not function ok 28 20/9/2011 Candle light at Women & Child not function ok 29 20/9/2011 Frame spotlite - not function ok 30 22/9/2011 habuk di kebanyakan tempat

56 Reference from M.O.D report september 2nd Floor 31 16/9/2011 Toilet transit ward - besi atas pada pintu 32 17/9/2011 Tandas transit ward 2 banyak sampah 33 17/9/2011 Room 205 close due to leaking ok 34 20/9/2011 Wallpaper tanggal in progres 35 20/9/2011 Access door to wards 2 broken ok 36 22/9/2011 Pantry messy because do not have rack for plate ok 37 23/9/2011 Banyak tandas kotor kerana tiada Housekeeping 38 23/9/2011 Perabot di transit ward 2 terkopak kulit 3rd Floor 39 16/9/2011 Room 306 - tv plug tiada, no bed tiada,, bau cat ok 40 17/9/2011 Room 311 - siling bocor, paip tak ketat ok 41 18/9/2011 Aircond at ward 3 counter not function ok 42 23/9/2011 Bed di ward 305 tidak memuaskan

57 Pintu telah dipasang Pemasangan siling Kerja – kerja pengorekan lantai untuk elektrikal Layout pemasangan elektrikal

58 Pemasangan vinyl selesai Aircond dalam progress Compressor aircond telah dipasang

59 HEALTH & PHYSICAL ASSESMENT

60 BY AGE -< 40 years * Female -38 person * Male – 11 person -> 40 years * Female – 10 person * Male – 5 person CRITERIA

61 Year of service - Propose staff more than 5 years of service

62 MALE -LAB TEST – Full Blood Count, Renal Test, Liver Test, Lipid Profile And UFEME -Fasting Blood Sugar test (Diabetic) -Cancer Marker – Prostate (PSA) -Ecg Test -Stress Test -Physical Fitness * For staff more than 3 years of service ONLY PROPOSAL STAFF 40 YEARS AND ABOVE

63 Female -LAB TEST – Full Blood Count, Renal Test, Liver Test, Lipid Profile And UFEME -Fasting Blood Sugar test (Diabetic) -Cancer Marker – Ovary (CA-125) -Pap Smear -Ecg Test -Stress Test -Mammogram -Physical Fitness * For staff more than 3 years of service ONLY

64 MALE -LAB TEST – HB1C and UFEME -Stress Test -Physical Fitness PROPOSAL STAFF < 40 YEARS

65 Female -LAB TEST –HB1C and UFEME -Pap Smear -Physical Fitness

66 FITNESS TEST 1.FLEXIBILITY. 2.MUSCULAR ENDURANCE. 3.AEROBIC ENDURANCE.

67 FLEXIBILTY TEST. (SIT AND REACH) 1. SIMPLE 3 TIMES TEST TO DO. 2. GET AVERAGE SCORE. 3. TO MEASURE CORE MUSCLE FLEXIBILTY.

68 MUSCULAR ENDURANCE TEST (SIT-UP)+(PUSH-UP) SIT-UP TO ASSESS LOWER BODY. PUSH-UP TO ASSESS UPPER BODY. TWO MINUTE EACH TEST.

69 MEN PUSH-UP ( TWO MINUTE) FITNESS LEVEL AGE 20>2930>3940>4950+ LEVEL 4>71>64>57>49 LEVEL 361-7054-6346-5639-49 LEVEL 237-6031-5324-4520-38 LEVEL 127-3621-3014-239-19

70 WOMEN PUSH-UP (TWO MINUTE TEST) FITNESS LEVEL AGE 20>2930>3940>4950+ LEVEL 4>34>31>27>23 LEVEL 329-3325-3022-2618-22 LEVEL 211-287-242-211-17 LEVEL 11-101-61-51-4

71 MEN SIT-UP TEST (TWO MINUTE ) FITNESS LEVEL AGE 20>2930>3940>4950+ LEVEL 4>88>82>75>68 LEVEL 377-8771-8166-7461-67 LEVEL 248-7641-6031-6527-60 LEVEL 136-4720-3025-3319-26

72 WOMEN SIT-UP TEST (TWO MINUTE) FITNESS LEVEL AGE 20>2930>3940>4950+ LEVEL 4>78>72>65>58 LEVEL 367-7761-7156-6451-57 LEVEL 238-6631-6024-5517-50 LEVEL 126-3720-3015-239-16

73 AEROBIC ENDURANCE TEST (10 MINUTE) TO DETERMINE STAMINA OF HEART BY CALCULATE THE RECOVERY H.R. 10 MINUTE ACT. REST HR, PEAK HR, RECOVERY HR.

74 RCR =PEAK HR – RECOVERY HR AFTER 1 MINUTE/10 RECOVERY RATE NO.CONDITION < THAN 2.0POOR 2 – 2.9FAIR 3 – 3.9GOOD 4 – 5.9EXCELLENT > THAN 6.0OUTSTANDING

75 Based on Criteria * Age * Gender Type of assessment: * Blood Pressure * Glucose * BMI * Stamina ASSESSMENT

76 POST PARASOL COMPANY NAME : RK MARKETING SDN BHD ADDRESS:NO 13, JALAN MERANTI JAYA 10, TAMAN MERANTI JAYA INDUSTRIAL PARK, 47100 PUCHONG, SELANGOR DARUL EHSAN TELEPHONE: 03 – 8060 2984 PRICE: WAITING QUOTATION FROM SUPPLIER DETAILS PRODUCT : CLASSIC SIDE POST PARASOLS Provides shade & More Utilization Beneath It - Open & Close in less than 5 minutes (Heavy Duty) CLASSIC SIDE POST PARASOLS Provides shade & More Utilizations Beneath It - Open & Close in less than 5 minutes (Heavy Duty) Side post allows unobstructured movement below parasols Enhance Separate Raised air vent allows better air circulation, more stability Powder-coated white structural aluminum alloy frame Stainless Steel Fasteners Minimal visibility of bolts & nuts Bigger frames Customize shapes & sizes to fit your location (up to 4m)

77 TENSILE PARASOL COMPANY NAME : RK MARKETING SDN BHD ADDRESS:NO 13, JALAN MERANTI JAYA 10, TAMAN MERANTI JAYA INDUSTRIAL PARK, 47100 PUCHONG, SELANGOR DARUL EHSAN TELEPHONE: 03 – 8060 2984 PRICE: WAITING QUOTATION FROM SUPPLIER DETAILS PRODUCT : TENSILE PARASOLS Futuristic Solutions (Super Heavy Duty) Innovative, stylish effects Enhances your outdoor shade with a new & exciting look Powder coated Galvanized frame 659g/m2 PVC roof cover

78 TENSION UMBRELLA HEXAGON (3 M X 3 M) COMPANY NAME : TK KANVAS SDN BHD ADDRESS : 4054 JALAN PERMATANG PAUH, 13400 BUTTERWORTH, PENANG, COUNTRY : MALAYSIA TELEPHONE NO: 012-5168 505 / 04-3235505 PRICE: WAITING QUOTATION FROM SUPPLIER DETAILS Engineered to stand wind speed above 120km/h Size- 3m Diameter Material- PVC coated polyester - PVC Tarpaulin Frame- Mild Steel Frame - Galvanized Mild Steel Frame - Aluminium Alloy Frame Color - White, Blu.e, Red, Green, Yellow, Grey etc. Tension Umbrella - Hexagon Tent is suitable for:- - Suitable for Garden - Cafe - Food Outlet - Food Court

79 SUN UMBRELLA COMPANY NAME : FOSHAN DSIN OUTDOOR FURNITURE FACTORY Tel.:+86-757-23871076/79/73 Mobile:+86-13702618798 Fax:+86-757-23871078 E-mail:sales_outdoorfurniture@hotmail.com (MSN) AddRESS.:Shibu Changlu Road,LongJiang Town,Foshan City,Guangdong province,China PRODUCT INFO: That umbrella material is iron frame and polyester, base is injecting water 100kg. PRICE : US $ 95

80 PARASOL COMPANY NAME: BEYOND SUPPLY SDN BHD ADDRESS: 17, Jalan PMS1, 75400 Plaza Melaka Sentral, MELAKA TELEPHONE: 06- 2825772 FAX: 06 – 2826772 DESIGN & STRUCTURE : General Use: OUTDOOR FURNITURE BRAND NAME: SUNLESS PANEL MATERIAL : POLYSTER BASE MATERIAL: ALUMINIUM POLE MATERIAL: ALUMINIUM QUOTATION DIMENSION: 2.0 M X 2.0 M (6 FT X 6 FT): RM 800.00 DIMENSION: 2.5 M X 2.5 M (8 FT X 8 FT) : RM 1200.00 DIMENSION : 3.0 M X 3.0 M (10 FT X 10 DFT): RM 1500.00

81

82 NURSING SYSTEM 2 ND NOVEMBER 2011

83 Phase 1 – RECORD TRANSACTION Training – In Progress (Base On List Name) User Name & Password – (David) Done Hardware : Mini PDA – Awaiting Quotation From Supplier – (Target – End Of This Week Settle) Workstation Trolley – In Progress –(Target – PO & Money Order End Of This Week Settle) PHASE 2 – PHYSIO REQUEST ONLINE STATUS SYSTEM – In Progress (David)

84 RECORD TRANSACTION PRINT PREVIEW SCREEN PREVIEW

85 OT REGISTRATION SYSTEM - WARD

86 FLOW CHART ORS PTS WITH REGISTRATION SLIP (PROCEED FOR OPERATION) PTS WITH REGISTRATION SLIP (PROCEED FOR OPERATION) OT STAFF (CHECK REGISTRATION SLIP) OT STAFF (CHECK REGISTRATION SLIP) FROM WARD (REGISTER PTS FOR OP) PRINT (EVIDANCE) FROM WARD (REGISTER PTS FOR OP) PRINT (EVIDANCE)

87 CONT, ADALAH MENJADI KESALAHAN PROSIDUR JIKA OT MENERIMA PESAKIT TANPA : PRINTED OT REGISTRATION SLIP

88

89 SCREEN PREVIEW PRINT PREVIEW Ors system

90 Penawar Nursing Services

91

92 Nursing List NONAMERECORDPHYSIOOT SYS 1EN. MOHD ALI 2HA ANANDHI 3HA MANIMEGALAI 4HA MUNIYAMAUPL 5HA NORSALHA 6HA SITI AISHAH 7JM SHUHADA 8MA MOHD AFFENDY 9SEN ARNIDATRAINED 10SEN NORAINITRAINED 11SEN RUZAINEETRAINED 12SEN SUTIMAH 13SRN AMIRA 14SRN AZMIRATRAINED 15SRN CHE MOHD HAFFIZUDIN 16SRN ELLYUSNITATRAINED 17SRN EMY SHAFIQ 18SRN FAIZAHTRAINED 19SRN MOHD MUKHLIS 20SRN NOOR AZIMAH

93 21SRN NOR ASIKINTRAINED 22SRN NOREENTRAINED 23SRN NORFARHANATRAINED 24SRN NORHAZIMAHTRAINED 25SRN NORIDA 26SRN NORIDA ERA 27SRN NORMALATRAINED 28 SRN NUR AINI KHADIJAHTRAINED 29 SRN NUR SITI HANISAHTRAINED 30SRN NURSUHAILA 31SRN NURUL ASYIKINTRAINED 32SRN RAJA NAZATULSL 33SRN ROGAYAH AKMARTRAINED 34SRN ROSMAWATI 35SRN ROSZILATRAINED 36SRN ROZZANATRAINED 37SRN SARUNI 38SRN SERI 39 SRN SHAIRULSAIFUDIN 40SRN SITI FATIMAH 41SRN YATIMAH 42 SL = STUDY LEAVE UPL = UNPAID LEAVE

94 THE FLOWERS CAFE DEVELOPMENT & IMPROVEMENT TARGET 4 NOVEMBER 2011 FLOWER CAFE

95 Menu Display Propose Hawkers Area 1.Peti Sejuk 2.Tambah 1 dapur (2 dapur) 3.Microwave 4.Cabinet (Pingan & Makanan) 5.Stainless Table FLOWER CAFE

96 FROOZEN & CHILLER Budget prize 1.430 L RM 1580 2.350 L RM 1350 FLOWER CAFE

97 STAINLESS TABLE FLOWER CAFE Budget prize 1.RM 980 Budget prize 1.RM 900

98 MICROWAVE Budget prize 1. RM 1500 FLOWER CAFE CARBINET MICROWAVE & CARBINET PINGGAN/MAKANAN Budget prize 1. RM ?

99 FLOWER CAFE NEW WORKING HOURS CHEFF 1.CHEFF YUSOF 7 AM – 4 PM 2.CHEFF SITI 9 AM – 6 PM BREAKFAST PROVIDE BY OUTSOURCE LUNCH PROVIDED AS USUAL BY CHEFF

100 NASIANEKA MEE Nasi Goreng Cina Nasi Goreng Kampung Burger Mee Goreng Mamak Mee Hoon Goreng Kuew Tiaw Goreng Kuew Tiaw Kerang PROPOSE MENU - HAWKER Menu di atas dicadangkan untuk permulaan dan akan ditambah dari masa ke semasa PAGI Roti Canai Omelet Telur ½ masak Mee rebus Mee Sup Mee Kari Mee Soto FLOWER CAFE

101 Promotion Promotion Flyers on new Hawker offerings / launching - Distribution at neighboring companies & shops - In hospital building - In Cafe Mini Signboard – To publish Menu offerings Menu Card – for customer to refer Poster & Banner Display NEED APPROVAL : To give special offering – buy 2 plates of hawker fare and get 1 additional free plate (To attract crowd) from 3.00 pm – 7.00 pm

102 Activities ProjectDatelineStatus Menu publish1/11/11Roti canai, Roti Bakar, Nasi Lemak, Mee Kari, Mee Sup, Nasi/Mee/Bihun/ Kew Tiau Goreng Menu by light box11/11/114 light box/RM 600 (Changeable) (Get approval by doctor) Menu atas meja11/11/111 set menu / RM 15 (Get approval by doctor) Signboard Café Flowers (Gazebo) 11/11/11Get quotation from MP Gazebo11/11/11Propose new design gazebo Flyers5/11/11Order by 1/11/11 FLOWER CAFE

103

104 LAUNCHING Launching target on 3 Nov 2011 Mini Menu distribute Special offer by group - Dessert FLOWER CAFE

105 TRAINING TEBAR ROTI CANAI TRAINER: CHEF YUSOFF / WAHID TIME : GROUP 1 – 2 PM – 3PM, GROUP 2 – 3 PM – 4 PM DATE : 2 WEEK (1 – 14/11/11) PESERTA : STAFF CAFÉ FLOWER CAFE


Download ppt "HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011."

Similar presentations


Ads by Google