1 DEVELOPMENT AND IMPROVEMENT 2011
HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

2 IVF-Development & Improvement
PROGRESS PROJECT DATELINE STATUS Gas connection to machine--- Nasir 4 NOV WAITING FOR GAS SUPPLIER Anaest Machine---Ahmad 19 NOV Brochure & quotation acquired

3 IVF- Development & Improvement
ACTIVITIES PROJECT DATELINE STATUS IVF TALK OCT 29 NOV 2 NOV 9 DONE –23 attended 2ND BATCH 3rd BATCH (namelist with Diana) FREE AD -FACEBOOK OCT 28 DONE LPPKN VISIT (by NOV 9) Draft letter---NOV 2 Call to make appt ---NOV 2 DONE by Bella (see ) GP VISIT OCT PG & Masai area NOV PG & Masai area NOV Tmn U & Skudai area NOV Tinggi area NOV Johor Jaya & Permas area NOV JB area Rescheduled

4 IVF-Development & Improvement
PROJECT DATELINE STATUS DIGITAL MARKETING BY (by NOV 10) Get data frm kpp & Medilink NOV 1 Draft NOV 2 DONE-- Data acquired PUBLIC BOOTH TESCO SERI ALAM NOV 12 BULK MAILING– NGO (by NOV 16) Draft letter & IVF leaflet job order NOV 11 DIGITAL MARKETING BY TELEMARKETING (FOLLOW-UP) (by NOV 25) Get data frm dept NOV 14 Data tracking NOV 18

5 GP VISIT 28 OCT 2011 AIR BIRU PASIR GUDANG
POLIKLINIK PENAWAR---DR SHUKOR POLIKLINIK SEJAHTERA---DR ZURAIDAH POLIKLINIK ROZIKIN---DR ZAIDAH (locum)

6 FREE AD ---FACEBOOK

7 IMAGING DEVELOPMENT OCT 2011

8 NEW GENERAL X-RAY SITE PROGRESS COMPLETED # BARIUM PLASTERING
# LEAD GLASS FRAME # WALL AND FLOOR TILE AT CONTROL AREA # LEAD DOOR

9 NEW GENERAL X-RAY LEAD DOOR & BARIUM PLASTER LEAD GLASS FRAME

10 NEW GENERAL X-RAY FLOOR TRUNKING WALL & FLOOR TILE @ CONTROL PANEL

11 NEW GENERAL X-RAY IN PROGRESS # FLOOR TRUNKING # TOILET DOOR
# ELECTRICAL JOB # CEILING

12 NEW GENERAL X-RAY CONCEPT # LAMINATE CEILING # FLOORING – VINYL
# WALL – FANCY PAINTING COMPLETION DATE : 15 NOV 2011

13 NEW GENERAL X-RAY LICENSE STATUS : LULUS BERSYARAT
# 25/10/11 KKM submission 1. APC Dr Nachiappan 2. APC Dr Zukri as Penyelia 3. Floor plan PP Masai as a new place for Old X-Ray 4. Dr Marlina time table

14 BIOMED PROGRESS DEVELOPMENT
NOVEMBER 2011 HOSPITAL PENAWAR

15 NEW ENT

16 CONFIRM TO BUY LIGHT SOURCE CAMERA SYSTEM
U9112 GL 350-5A PRICE RMB 4296 2 LAMP XENON & HALOGEN INCASE BREAKDOWN WE CAN SELECT 2ND LAMP ILLUMINATION > LX CAMERA SYSTEM U9226 F-168D PRICE RMB 17491 SCANNING STANDARD 600 LINES CAMERA HEAD 1.3” SONY WATERPROOF OUTPUT : BNC, Y, C, RGB, DVI, USB

17 SUPPLIER CONTACT NAME ADDRESS Colin Zhuang
Shanghai Medical Instrument Impt.&Expt.Co.,LTD Tel: Fax: Mobile: Website:www.smicc.com

18 ACTIVITY PROGRESS PROFORMA INVOICE NEEDED PURCHASE ORDER TT PROGRESS
31/10/2011 USD PURCHASE ORDER DONE 1/11/2011 TT PROGRESS PASS OVER TO ERIN 1/11/2011 TARGET TT COMPLETE 21 NOVEMBER 2011 ( WAITING EN AZIZAN )

19 CCTV DEVELOPMENT

20 CCTV DEVELOPMENT Purchase of material:
Avtech Dome Camera (RM95.00 x 10 unit) = RM950.00 CCTV cable (2 box)+ Cable Power (2 box) = RM390.00 BNC Connector & other equipment = RM226.50 H/disk 500gb+Connecter DC 30pcs = RM345.00 DVR = RM0.00 Monitor + Bracket = RM405.00 Power DB 5AMP (3 unit) = RM540.00 TOTAL = RM2,856.50 APPROVED BUDGET = RM3,100.00

21 MATERIAL PURCHASED

22 MATERIAL PURCHASED

23 SCHEDULE PROGRESS Work done 24-30 Oct 31-6 Nov 7-13 Nov Planning Done
Drilling In progress Cable installation: *Lift A *Lift B Not started yet Camera installation: * - Camera replacement (2 unit) - System test

24 Drilling LIFT A

25 Drilling LIFT B

26 PARADE IMPROVEMENT

27 CURRENT LOCATION

28 NEW LOCATION

29 THIS WEEK TARGET Start on 4 November 2011: - P.A. system ready to use.
- new location (Directors’ parking lot) - parade commander on stage - record by CCTV – David to change CCTV view - QC will in-charge for the parade until further notice Content: - Pemeriksaan perbarisan (attendance/uniform) - Takhlim - Current issues

30 HP NOVEMBER 2011 DEVELOPMENT & IMPROVEMENT
LADY O&G 2nd ENT CLINIC 1 November 2011 Gee / CS Team

31 LADY O&G # Target October ~ 150 outpatient / 30 inpatient
# Achievement for October Dr.Norlela ~ 25 outpatient / 1 inpatient Dr.Geetha ~ 10 outpatient / 0 inpatient # Failure to achieve target: Attendance & commitment lady O&G doctor. Night clinic & Sunday clinic by resident doctor ( Dr.Suhaimi ) close.

32 LADY O&G Dr.Norlela 4 Oct 9 o/p 6 Oct 5 o/p 11 Oct 9 o/p ~ 1 i/p
On leave 20 Oct 25 Oct – 30 Nov

33 LADY O&G Dr.Geetha 1 Oct 1 o/p 2 Oct 0 o/p 8 Oct On leave 9 Oct 15 Oct
Emergency leave 23 Oct 29 Oct 4 o/p 30 Oct ( Dr. Han Sok Kit )

34 LADY O&G # Target November ~ 150 outpatient / 30 inpatient
# Target performance measures: 1. Full commitment from lady O&G ~ Night clinic open by Dr.Geetha ~ Sat/Sun clinic open by Dr.Geetha 2. Replacement lady doctor if Dr.Geetha emergency leave; @ Dr.Han Sok Kit ( ) or MO under Dr.Geetha

35 LADY O&G 3 . Activities by CS Department Project Dateline Status
1. Banner installation 1 Nov Done 2. Roster by Medical Unit 31 Oct 3. Digital Marketing by SMS 4 Nov sorting data from Kpp HP data - done 4. Digital Telemarketing “Delivery” 11 Nov 5. Website Update “ Delivery Package & Lady O&G” 2 Nov - Draft done 6. Visit GP Clinic 8 Nov 15 Nov 17 Nov 23 Nov PG & Masai area Taman U & Skudai area Kota Tinggi area Johor Jaya & Permas area JB area

36 LADY O&G Comparison Total Patient O&G Month 2011 Dr.Suhaimi Dr.Norlela
Dr.Geetha Total July 493 August 382 8 23 413 September 387 24 31 442 October 456 26 10 492

37 LADY O&G – Colposcopy (3 Oct 2011)

38 LADY O&G - clinic

39 LADY O&G - ultrasound

40 2nd ENT CLINIC Waiting for new light source & camera incharge by Ahmad ~ 31 October no progress

41 2nd ENT CLINIC (3 Oct 2011)

42 2nd ENT CLINIC – work station (3 Oct)

43 DIALYSIS : KKM LICENSE SUBMISSION

44 STAFFING Try to contact and visit Dialysis Center to find out SRN with Dialysis Certificate. Progress: Already approach SRN Rohana (ex- staff HP) but she demand for salary up to RM3K. Interviewed SRN done on 15th October 2011with Matron Marziah. - Candidate experience at Kulai Rotary Dialysis Centre – 6 month

45 PROGRESS NO DIALYSIS CENTRE VISITING/ CALL STAFFING REMARK 1
BP RENAL CARE (RENGIT) SDN BHD Visit 3 SRN, 2 AIDE 1 – Post Basic Renal-For licensing 2 Johor Quarries Association Dialysis,Johor Jaya 8 SRN 2 – post Basic Renal – 1 for licensing 3 Prima Dialysis Centre, Masai 4 SRN- 1in charge for license 1 – Post Basic Renal – 1 for licensing 4 Nefro Utama Sdn Bhd, Bandar Baru Uda Call 10 SRN 2 – Post Basic renal – 1 for licensing 5 Pusat rawatan dialisis yayasan pembangunan keluarga,permas jaya 10 SRN 4 AIDE 3 – post Basic renal - 1 license, 2 (bond)

46 NO DIALYSIS CENTER VISIT/CALL STAFFING REMARKS 6 JB- Lions Medical Charity, Taman Sri tebrau Call 5 SRN , 2 Aide 1 – SRN Post Basic 7 JJ Lion Dialysis centre, Taman Johor Jaya 3 SRN, 1 Aide No Post Basic

47 PROGRESS Requirement from NKF Fees RM 4,500.00
Duration Period of training is 6 months Entry Requirements Must be a registered staff nurse/medical assistant, preferably with 6 months working experience in a haemodialysis unit Must have full secondment and a form of endorsement from their relevant authority Hepatitis Status – must be negative * Intake on January and August every year

48 * Intake on January and July every year
MOH Requirement Fees RM 3,500.00 Duration Period of training is 6 months Entry Requirements Must be a registered staff nurse/medical assistant, preferably with 6 months working experience in a haemodialysis unit Hepatitis Status – must be negative Closing date for course intake January’12 - September * Intake on January and July every year

49 NEUROSURGERY

50 PROGRESS Letter to Director of Hospital Sultanah Aminah ready and prepared by Pn Hjh Norizan. Will send the letter to Director on Thursday 01st November 2011

51 PROGRESS Letter already send and pass it to Ms Hafilna PA, of Director, Hospital Sultanah Aminah by Tuesday -01st November 2011. Will follow up with her to get approval for attachment.

52 MAINTENANCE RESOLVE 90% SEPTEMBER

53 Reference from M.O.D September report
Sekeliling bangunan No. Report date Report Status 1 16/9/2011 Air sinki café berlimpah ok 2 16/9/2011 Sampah banyak di kaki lima The Shoppe 3 16/9/2011 Mentol lampu pintu masuk hadapan tiada ok 4 16/9/2011 Lampu taman depan The Shoppe terbakar 5 16/9/2011 Lampu taman main entrance tak hidup ok 6 16/9/2011 Sebahagian Galery terlindung dengan bahan projek ok 7 20/9/ bulb lampu tiang terbakar ok 8 20/9/2011 A&E bulb terbakar ok 9 20/9/2011 Bumbung laluan kaki dari kafe tanggal ok 10 21/9/2011 Puntung rokok bertaburan dari The Shoppe ke A&E

54 11 21/9/2011 Longkang tepi Genset kotor
12 21/9/2011 Puntung rokok di gazebo bertaburan 13 21/9/2011 Tandas A ground floor kotor 14 22/9/2011 Habuk di perabot dan bingkai tingkap 15 22/9/2011 Aircond not function well in ground floor ok 16 24/9/2011 Barang-barang Hari Raya Open House belum dikemaskan. 17 26/9/2011 Kucing berkeliaran di kafe 18 26/9/2011 Hos getah tidak digulung kemas di kaki lima 19 27/9/2011 Lampu depan Imaging department rosak ok 20 28/ Lampu di kafe tak berfungsi ok

55 Reference from M.O.D report september
Ground floor 21 16/9/2011 Penutup pam tandas A tiada in progres 22 16/9/2011 Lift B - lantai kotor 23 22/9/2011 Habuk di kebanyakan tempat 24 24/9/2011 Lampu A&E tak hidup ok 1st floor 25 20/9/2011 Candle light di tangga Classic Clinic not fctn ok 26 20/9/2011 Women & Child toilet - pipe leaking ok 27 20/9/2011 Downlite Women & Child - not function ok 28 20/9/2011 Candle light at Women & Child not function ok 29 20/9/2011 Frame spotlite - not function ok 30 22/9/2011 habuk di kebanyakan tempat

56 Reference from M.O.D report september
2nd Floor 31 16/9/2011 Toilet transit ward - besi atas pada pintu 32 17/9/2011 Tandas transit ward 2 banyak sampah 33 17/9/2011 Room 205 close due to leaking ok 34 20/9/2011 Wallpaper tanggal in progres 35 20/9/2011 Access door to wards 2 broken ok 36 22/9/2011 Pantry messy because do not have rack for plate ok 37 23/9/2011 Banyak tandas kotor kerana tiada Housekeeping 38 23/9/2011 Perabot di transit ward 2 terkopak kulit 3rd Floor 39 16/9/2011 Room tv plug tiada, no bed tiada,, bau cat ok 40 17/9/2011 Room siling bocor, paip tak ketat ok 41 18/9/2011 Aircond at ward 3 counter not function ok 42 23/9/2011 Bed di ward 305 tidak memuaskan

57 Project - New x-ray Pintu telah dipasang Layout pemasangan elektrikal
Pemasangan siling Kerja – kerja pengorekan lantai untuk elektrikal

58 New transit ward Pemasangan vinyl selesai Aircond dalam progress
Compressor aircond telah dipasang

59 HEALTH & PHYSICAL ASSESMENT

60 CRITERIA BY AGE < 40 years * Female -38 person * Male – 11 person

61 Year of service - Propose staff more than 5 years of service

62 PROPOSAL STAFF 40 YEARS AND ABOVE
MALE LAB TEST – Full Blood Count, Renal Test, Liver Test, Lipid Profile And UFEME Fasting Blood Sugar test (Diabetic) Cancer Marker – Prostate (PSA) Ecg Test Stress Test Physical Fitness * For staff more than 3 years of service ONLY

63 Female LAB TEST – Full Blood Count, Renal Test, Liver Test, Lipid Profile And UFEME Fasting Blood Sugar test (Diabetic) Cancer Marker – Ovary (CA-125) Pap Smear Ecg Test Stress Test Mammogram Physical Fitness * For staff more than 3 years of service ONLY

64 PROPOSAL STAFF < 40 YEARS
MALE LAB TEST – HB1C and UFEME Stress Test Physical Fitness

65 Female LAB TEST –HB1C and UFEME Pap Smear Physical Fitness

66 FLEXIBILITY. MUSCULAR ENDURANCE. AEROBIC ENDURANCE.
FITNESS TEST FLEXIBILITY. MUSCULAR ENDURANCE. AEROBIC ENDURANCE.

67 FLEXIBILTY TEST. (SIT AND REACH)
1. SIMPLE 3 TIMES TEST TO DO. 2. GET AVERAGE SCORE. 3. TO MEASURE CORE MUSCLE FLEXIBILTY.

68 MUSCULAR ENDURANCE TEST (SIT-UP)+(PUSH-UP)
SIT-UP TO ASSESS LOWER BODY. PUSH-UP TO ASSESS UPPER BODY. TWO MINUTE EACH TEST.

69 MEN PUSH-UP ( TWO MINUTE)
FITNESS LEVEL AGE 20>29 30>39 40>49 50+ LEVEL 4 >71 >64 >57 >49 LEVEL 3 61-70 54-63 46-56 39-49 LEVEL 2 37-60 31-53 24-45 20-38 LEVEL 1 27-36 21-30 14-23 9-19

70 WOMEN PUSH-UP (TWO MINUTE TEST)
FITNESS LEVEL AGE 20>29 30>39 40>49 50+ LEVEL 4 >34 >31 >27 >23 LEVEL 3 29-33 25-30 22-26 18-22 LEVEL 2 11-28 7-24 2-21 1-17 LEVEL 1 1-10 1-6 1-5 1-4

71 MEN SIT-UP TEST (TWO MINUTE )
FITNESS LEVEL AGE 20>29 30>39 40>49 50+ LEVEL 4 >88 >82 >75 >68 LEVEL 3 77-87 71-81 66-74 61-67 LEVEL 2 48-76 41-60 31-65 27-60 LEVEL 1 36-47 20-30 25-33 19-26

72 WOMEN SIT-UP TEST (TWO MINUTE)
FITNESS LEVEL AGE 20>29 30>39 40>49 50+ LEVEL 4 >78 >72 >65 >58 LEVEL 3 67-77 61-71 56-64 51-57 LEVEL 2 38-66 31-60 24-55 17-50 LEVEL 1 26-37 20-30 15-23 9-16

73 AEROBIC ENDURANCE TEST (10 MINUTE)
TO DETERMINE STAMINA OF HEART BY CALCULATE THE RECOVERY H.R . 10 MINUTE ACT. REST HR, PEAK HR, RECOVERY HR.

74 RCR =PEAK HR – RECOVERY HR AFTER 1 MINUTE/10
RECOVERY RATE NO. CONDITION < THAN 2.0 POOR 2 – 2.9 FAIR 3 – 3.9 GOOD 4 – 5.9 EXCELLENT > THAN 6.0 OUTSTANDING

75 ASSESSMENT Based on Criteria * Age * Gender Type of assessment:
* Blood Pressure * Glucose * BMI * Stamina

76 POST PARASOL COMPANY NAME : RK MARKETING SDN BHD ADDRESS :NO 13, JALAN MERANTI JAYA 10, TAMAN MERANTI JAYA INDUSTRIAL PARK, 47100 PUCHONG, SELANGOR DARUL EHSAN TELEPHONE : 03 – PRICE : WAITING QUOTATION FROM SUPPLIER DETAILS PRODUCT : CLASSIC SIDE POST PARASOLS Provides shade & More Utilization Beneath It - Open & Close in less than 5 minutes (Heavy Duty) CLASSIC SIDE POST PARASOLS Provides shade & More Utilizations Beneath It - Open & Close in less than 5 minutes (Heavy Duty) Side post allows unobstructured movement below parasols Enhance Separate Raised air vent allows better air circulation, more stability Powder-coated white structural aluminum alloy frame Stainless Steel Fasteners Minimal visibility of bolts & nuts Bigger frames Customize shapes & sizes to fit your location (up to 4m)

77 TENSILE PARASOL COMPANY NAME : RK MARKETING SDN BHD ADDRESS :NO 13, JALAN MERANTI JAYA 10, TAMAN MERANTI JAYA INDUSTRIAL PARK, 47100 PUCHONG, SELANGOR DARUL EHSAN TELEPHONE : 03 – PRICE : WAITING QUOTATION FROM SUPPLIER DETAILS PRODUCT : TENSILE PARASOLS Futuristic Solutions (Super Heavy Duty) Innovative, stylish effects Enhances your outdoor shade with a new & exciting look Powder coated Galvanized frame 659g/m2 PVC roof cover

78 TENSION UMBRELLA HEXAGON (3 M X 3 M)
COMPANY NAME : TK KANVAS SDN BHD ADDRESS : 4054 JALAN PERMATANG PAUH, BUTTERWORTH, PENANG, COUNTRY : MALAYSIA TELEPHONE NO : / PRICE : WAITING QUOTATION FROM SUPPLIER DETAILS Engineered to stand wind speed above 120km/h Size - 3m Diameter Material - PVC coated polyester - PVC Tarpaulin Frame - Mild Steel Frame - Galvanized Mild Steel Frame - Aluminium Alloy Frame Color  - White, Blu.e, Red, Green, Yellow, Grey etc. Tension Umbrella - Hexagon Tent is suitable for:- - Suitable for Garden   - Cafe   - Food Outlet   - Food Court

79 E-mail :sales_outdoorfurniture@hotmail.com (MSN)
SUN UMBRELLA COMPANY NAME : FOSHAN DSIN OUTDOOR FURNITURE FACTORY Tel. : /79/73       Mobile : Fax : (MSN) AddRESS .:Shibu Changlu Road,LongJiang Town,Foshan City,Guangdong province,China PRODUCT INFO : That umbrella material is iron frame and polyester, base is injecting water 100kg.  PRICE : US $ 95

80 COMPANY NAME : BEYOND SUPPLY SDN BHD
PARASOL COMPANY NAME : BEYOND SUPPLY SDN BHD ADDRESS : 17, Jalan PMS1, Plaza Melaka Sentral, MELAKA TELEPHONE : FAX : 06 – DESIGN & STRUCTURE : General Use : OUTDOOR FURNITURE BRAND NAME : SUNLESS PANEL MATERIAL : POLYSTER BASE MATERIAL : ALUMINIUM POLE MATERIAL : ALUMINIUM QUOTATION DIMENSION: 2.0 M X 2.0 M (6 FT X 6 FT) : RM DIMENSION: 2.5 M X 2.5 M (8 FT X 8 FT) : RM DIMENSION : 3.0 M X 3.0 M (10 FT X 10 DFT) : RM

81

82 NURSING SYSTEM 2ND NOVEMBER 2011

83 Phase 1 – RECORD TRANSACTION
Training – In Progress (Base On List Name) User Name & Password – (David) Done Hardware : Mini PDA – Awaiting Quotation From Supplier (Target – End Of This Week Settle) Workstation Trolley – In Progress (Target – PO & Money Order End Of This Week Settle) PHASE 2 – PHYSIO REQUEST ONLINE STATUS SYSTEM – In Progress (David)

84 SCREEN PREVIEW PRINT PREVIEW RECORD TRANSACTION

85 OT REGISTRATION SYSTEM - WARD

86 FLOW CHART ORS FROM WARD (REGISTER PT’S FOR OP) PRINT (EVIDANCE)
OT STAFF (CHECK REGISTRATION SLIP) PT’S WITH REGISTRATION SLIP (PROCEED FOR OPERATION) RETURN PT’S TO WARD PT’S WITHOUT REGISTRATION SLIP (DELAY CASE) DO NOT ACCEPT PT’S

87 CONT, ADALAH MENJADI KESALAHAN PROSIDUR JIKA OT MENERIMA PESAKIT TANPA : ‘PRINTED OT REGISTRATION SLIP’

88

89 SCREEN PREVIEW PRINT PREVIEW Ors system

90 Penawar Nursing Services

91

92 Nursing List NO NAME RECORD PHYSIO OT SYS 1 EN. MOHD ALI 2 HA ANANDHI
2 HA ANANDHI 3 HA MANIMEGALAI 4 HA MUNIYAMA UPL 5 HA NORSALHA 6 HA SITI AISHAH 7 JM SHUHADA 8 MA MOHD AFFENDY 9 SEN ARNIDA TRAINED 10 SEN NORAINI 11 SEN RUZAINEE 12 SEN SUTIMAH 13 SRN AMIRA 14 SRN AZMIRA 15 SRN CHE MOHD HAFFIZUDIN 16 SRN ELLYUSNITA 17 SRN EMY SHAFIQ 18 SRN FAIZAH 19 SRN MOHD MUKHLIS 20 SRN NOOR AZIMAH

93 21 SRN NOR ASIKIN TRAINED 22 SRN NOREEN 23 SRN NORFARHANA 24 SRN NORHAZIMAH 25 SRN NORIDA 26 SRN NORIDA ERA 27 SRN NORMALA 28 SRN NUR AINI KHADIJAH 29 SRN NUR SITI HANISAH 30 SRN NURSUHAILA 31 SRN NURUL ASYIKIN 32 SRN RAJA NAZATUL SL 33 SRN ROGAYAH AKMAR 34 SRN ROSMAWATI 35 SRN ROSZILA 36 SRN ROZZANA 37 SRN SARUNI 38 SRN SERI 39 SRN SHAIRULSAIFUDIN 40 SRN SITI FATIMAH 41 SRN YATIMAH 42 SL = STUDY LEAVE UPL = UNPAID LEAVE

94 DEVELOPMENT & IMPROVEMENT
THE FLOWERS CAFE DEVELOPMENT & IMPROVEMENT TARGET 4 NOVEMBER 2011 FLOWER CAFE

95 FLOWER CAFE Menu Display Propose Hawkers Area Peti Sejuk
Tambah 1 dapur (2 dapur) Microwave Cabinet (Pingan & Makanan) Stainless Table FLOWER CAFE

96 FROOZEN & CHILLER Budget prize 430 L RM 1580 350 L RM 1350 FLOWER CAFE

97 STAINLESS TABLE Budget prize RM 980 Budget prize RM 900 FLOWER CAFE

98 MICROWAVE & CARBINET PINGGAN/MAKANAN
Budget prize 1. RM 1500 Budget prize 1. RM ? FLOWER CAFE

99 FLOWER CAFE NEW WORKING HOURS CHEFF CHEFF YUSOF 7 AM – 4 PM
CHEFF SITI 9 AM – 6 PM BREAKFAST PROVIDE BY OUTSOURCE LUNCH PROVIDED AS USUAL BY CHEFF FLOWER CAFE

100 FLOWER CAFE PROPOSE MENU - HAWKER PAGI Roti Canai Omelet Telur ½ masak
Mee rebus Mee Sup Mee Kari Mee Soto NASI ANEKA MEE Nasi Goreng Cina Nasi Goreng Kampung Burger Mee Goreng Mamak Mee Hoon Goreng Kuew Tiaw Goreng Kuew Tiaw Kerang Menu di atas dicadangkan untuk permulaan dan akan ditambah dari masa ke semasa FLOWER CAFE

101 Promotion Promotion Flyers on new Hawker offerings / launching Distribution at neighboring companies & shops In hospital building In Cafe Mini Signboard – To publish Menu offerings Menu Card – for customer to refer Poster & Banner Display NEED APPROVAL: To give special offering – buy 2 plates of hawker fare and get 1 additional free plate (To attract crowd) from 3.00 pm – 7.00 pm FLOWER CAFE

102 FLOWER CAFE Activities Project Dateline Status Menu publish 1/11/11
Roti canai, Roti Bakar, Nasi Lemak, Mee Kari, Mee Sup, Nasi/Mee/Bihun/ Kew Tiau Goreng Menu by light box 11/11/11 4 light box/RM 600 (Changeable) (Get approval by doctor) Menu atas meja 1 set menu / RM 15 Signboard Café Flowers (Gazebo) Get quotation from MP Gazebo Propose new design gazebo Flyers 5/11/11 Order by 1/11/11 FLOWER CAFE

103 FLOWER CAFE

104 FLOWER CAFE LAUNCHING Launching target on 3 Nov 2011
Mini Menu distribute Special offer by group - Dessert FLOWER CAFE

105 TRAINING TEBAR ROTI CANAI TRAINER: CHEF YUSOFF / WAHID TIME : GROUP 1 – 2 PM – 3PM, GROUP 2 – 3 PM – 4 PM DATE : 2 WEEK (1 – 14/11/11) PESERTA : STAFF CAFÉ FLOWER CAFE