1 www.ilbank.gov.tr Constructive Power of Turkey

2 FINANCING THE URBAN INFRASTRUCTURE IN TURKEY AHMET TURAN SÖYLEMEZ ILLER BANK A.Ş. INTERNATIONAL RELATIONS DEPARTMENT

3 Constructive Power of Turkey DISTRIBUTION OF MUNICIPAL POPULATION IN TURKEY (62.271.517 INHABITANTS IN 2956 MUNICIPALITIES) Distribution of MunicipalitiesDistribution of Population

4 Constructive Power of Turkey ILLER BANKS BUSINESS BASIS Iller Bank is an investment bank assisting local administrations by developing projects, securing loans, providing consultancy and technical assistance for their urban needs.

5 Constructive Power of Turkey FIELDS OF ACTIVITIES Project Development Financing Technical Consultancy Transfer of allocations from central budget to local administrations

6 Constructive Power of Turkey ILLER BANKS TECHNICAL SERVICES Water Supply Water Treatment Sewerage Solid Waste Sea Outfall Superstructure Development Planning Mapping

7 Constructive Power of Turkey COMLETED WORKS (1993-2010)

8 Constructive Power of Turkey DEVELOPED PROJECTS (2005-2010)

9 Constructive Power of Turkey THE BANKS ONGOING WORKS ON 2011 (1109 PROJECTS - 2,070,000,000 )

10 Constructive Power of Turkey ILLER BANK - IFI RELATIONSHIPS World Bank (WB) Japan International Cooperation Agency (JICA) European Investment Bank (EIB) European Bank for Reconstruction and Development (EBRD) Council of Europe Development Bank (CEB)

11 Constructive Power of Turkey MUNICIPAL SERVICES PROJECTS (MSP) WITH THE WORLD BANK Municipal Services Project (MSP-I) Loan Agreement: 08 Feb. 2006 Loan Amount: 212.9 Million Euro Guarantor: Undersecretariat of Treasury Borrower: Iller Bank A.Ş. Sub-Borrowers: Water and Sewerage Administrations and Municipalities (2+9) Municipal Services Project –Additional Financing (MSP-II) Loan Agreement: 29 June 2010 Loan Amount: 178.2 Million Euro Guarantor: Undersecretariat of Treasury Borrower: Iller Bank A.Ş. Sub-Borrowers: Water and Sewerage Administrations and Municipalities (3+4)

12 Constructive Power of Turkey MUNICIPAL SEWERAGE AND WASTEWATER TREATMENT PROJECT WITH JICA Loan Agreement: 22 June 2011 Loan Amount: 12.784.000.000 Japanese Yen (136.875.000USD) Guarantor: Undersecretariat of Treasury Borrower: Iller Bank A.Ş. Sub-Borrowers: Water and Sewerage Administrations and Municipalities

13 Constructive Power of Turkey ILLER BANK ENVIRONMENTAL LOAN WITH EIB Scope: Small and medium sized municipal investment schemes in water, wastewater and solid waste sectors Amount: EUR 150,000,000.00 Memorandum of Understanding signed on 22 October 2010 in Istanbul. Negotiations on the Draft Loan Agreement is ongoing among the Treasury, EIB and Iller Bank A.Ş.

14 Constructive Power of Turkey ESTIMATED ALIGNMENT COST FOR EU ENVIRONMENT SECTOR (COWI/EHCIP PROJECT-2005) Sector Personnel cost (M ) Technical Assistance Cost (M ) Investment Cost (M ) Total Implementation Cost (M ) Horizontal5.037.8n.a.43 Air46.3101.62,7462,894 Waste34322.013,33813,703 Water0.916.137,62937,646 Nature420.51,314.6n.a.1,735 Industry30.816.914,26014,308 Chemicals123.328.9n.a.152 Nuclear1.78.1n.a.10 Noise28.87.5 42 1 79 Total1,000.51,553.568,00070,569

15 Constructive Power of Turkey ESTIMATED SOURCES OF FINANCE FOR THE INVESTMENT NEEDS OF PUBLIC SECTOR (COWI/EHCIP PROJECT-2005)

16 Constructive Power of Turkey IPA BUDGET UNDER ENVIRONMENTAL OP (2007-2011) PRIORITYIPA CONTRIBUTION NATIONAL CO-FINACING TOTAL FUNDING Priority 1 – Improved delivery of drinking water and wastewater services 280.141.60049.436.753329.587.353 Priority 2 – Improved integrated solid waste management 120.060.40021.187.131141.247.531 Priority 3 – technical assistance16.498.0002.911.41419.409.414 TOTAL416.7000.00073.535.298490.235.298

17 Constructive Power of Turkey EU PROJECT PIPELINE CAPACITY BUILDING 1 Technical Assistance For Strengthening the Capacities of MoEF IPA Center and End- Recipients EuropeAid/128968/D/SER/ TR 3.500.000 EUR 2 Technical Assistance to Prepare Integrated Solid Waste Management Projects EuropeAid/128133/D/SER/ TR 4.000.000 EUR 3 Technical Assistance to Prepare Integrated Water Projects EuropeAid/128134/D/SER/ TR 6.000.000 EUR

18 Constructive Power of Turkey EU PROJECT PIPELINE WATER 1 Technical Assistance for the Supervision of Construction of ORDU Waste Water Treatment Plant (WWTP) and Retrofitting of Kumbaşı WWTP EuropeAid/128730/D/SER/TR1.719.000 EUR 2 Technical Assistance and Supervision for DOĞUBAYAZIT Drinking Water Supply Project EuropeAid/129571/D/SER/TR3.195.972 EUR 3 Technical Assistance and Supervision for AKŞEHIR Water and Waste Water Project EuropeAid/129564/D/SER/TR2.473.704 EUR 4 Technical assistance and supervision for ERDEMLI wastewater collection and storm water drainage project EuropeAid/129587/D/SER/TR.1.815.447 EUR 5 Technical Assistance and Supervision for CEYHAN Waste Water and Storm Water Project EuropeAid/129562/D/SER/TR1.752.845 EUR 6 Technical assistance and supervision for LÜLEBURGAZ wastewater management project EuropeAid/129589/D/SER/TR.1.157.101 EUR 7 Technical assistance and supervision for AMASYA water and wastewater project EuropeAid/129586/D/SER/TR.1.136.325 EUR 8 Technical Assistance and Supervision for ERZINCAN Water and Wastewater Project EuropeAid/129810/D/SER/TR.3.832.540 EUR 9 Technical Assistance and Supervision for NIZIP Water and Wastewater Project (Gaziantep) EuropeAid/129940/D/SER/TR3.100.856 EUR

19 Constructive Power of Turkey EU PROJECT PIPELINE 10 Technical Assistance and Supervision for ERZURUM Water and Wastewater Project. Location – Erzurum/Turkey EuropeAid/129942/D/SER/TR5.384.141 EUR 11 Technical Assistance and Supervision of DIYARBAKIR Water and Waste Water Project EuropeAid/129990/D/SER/TR5.000.000 EUR 12 Technical Assistance and Supervision for SIVEREK Wastewater Project Location – Şanlıurfa/Turkey EuropeAid/130037/D/SER/TR2.501.299 EUR 13 Technical Assistance and Supervision for MANAVGAT Water and Wastewater Project EuropeAid/130107/D/SER/TR2.856.691 EUR 14 Technical Assistance and Supervision for ADIYAMAN Wastewater Project EuropeAid/130111/D/SER/TR3.145.478 EUR 15 Technical Assistance and Supervision for ERCIS Drinking Water Supply Project EuropeAid/130136/D/SER/TR3.117.428 EUR 16 Technical Assistance and Supervision for POLATLI Water and Wastewater Project EuropeAid/130253/D/SER/TR2.754.540 EUR 17 Technical Assistance and Supervision for BULANCAK Water and Wastewater Project EuropeAid/130667/D/SER/TR2.350.000 EUR

20 Constructive Power of Turkey EU PROJECT PIPELINE SOLID WASTE 1 Technical Assistance and Supervision for KONYA Solid Waste Management Project EuropeAid/129588/D/SER/ TR. 2.295.500 EUR 2 Technical Assistance and Supervision for ÇORUM Solid Waste Management Project EuropeAid/129725/D/SER/ TR 1.189.100 EUR 3 Technical Assistance and Supervision for BALIKESIR Solid Waste Management Project EuropeAid/129944/D/SER/ TR 1.333.200 EUR

21 Constructive Power of Turkey THANK YOU