2 Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

3 Applied Structural Drying (ASD) & Agent Loss Ratio Sheet BACKING SUBSTRATE (PLYWOOD) PAD FAN DEHUMIDIFIER

4 Science Freeze H2O 0-32 º F Boil 212 º F ASD Primary Law High Heat + Agitation WATER SURFACE TENSIONWIND HEAT THERMOCLINE

5 Science CARPET SUBSTRATE (PLYWOOD) PAD

6 Science H 2 O ÷ ASD = H 2 / O Heat – causes the violent agitation of molecules Motion – breaks surface tension of standing water

7 Science - Water Travels In 2 Directions 1. The path of least resistance 2. From wet to dry LIVINGROOM CARPET BATHTUB WATERFALL RIVER LAKE

8 The Path of Least Resistance SIDING JOIST PLYWOOD CARPET PAD FRAMING INS DRY BASE

9 From Wet To Dry Qualified Measurements Relative humidity Temperature Grains per pound Relative material standard HEAT 105 º WET DRY + - STRAW EFFECT

10 Goal ASD is a method to reverse natural occurrence to restore a structure to pre-loss condition.

11 Standard Water Damage Operation Remove Wet Materials Extract Porous Material 1 Fan per 8-12 ?? Dehumidification per 8F ratio 10 x 15 = 1,500 sf DEHU

12 Standard Water Damage Operation Restoration ConstructionEmergency Temp 2 Drywall$1,800 Reset Base$150 Pad$400 Re-stretch$100 Paint$1,200 Clean$100 $2,660 Profit/Over 10/10$500 TOTAL$3,160 (5) $25 4days$500 (1) $100 day$400 Remove 1,500 sf$750 Emergency Response – day$150 WTR 4days$300 TOTAL$2,100

13 Standard Water Damage Operation Average Loss has 2-3 roomsE-TempConstrution ( 2 room loss)$4,200$6,320 Loss $10,520 (MN/Dry + MN/PNT) Plus intrusion$1,350 $11,750

14 Extract porous materials Dehumidification by G.P.P. in air Fans – water tension & dew point Meet 72 hr dry time A.S.D. Standard Water Loss HEAT 105 º DEHU

15 A.S.D. Standard Water Loss Restoration ConstructionEmergency Temp Dry – MN$150 Paint Walls$1,200 TOTAL$1,350 (6) 72 hrs$450 (1) 72 hrs$ hrs$450 Extraction$350 Emergency Response$150 WTR – 72 hrs$250 TOTAL$2,050

16 A.S.D. Standard Water Loss Construction at Intrusion Pt.$1,350 Emergency Temp$2,050 2 SD Room Loss$1,650 $5,050 Water Standard$1,750 ASD Standard$5,050 $6,700 diff 57% TOTAL LOSS

17