Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle.

Similar presentations


Presentation on theme: "Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle."— Presentation transcript:

1 Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

2 Salient Features Population of City as per lacs Present Population lacs Population connected with water supply lacs Water demand 4197 lac lit

3 Water Production From tube wells (1897 nos) 2900 lac lit From Bisalpur System 720 lac lit From single point tube wells (117 nos) 15 lac lit Total 3620 lac lit

4 Details of Sources Tube wells 1897 Hand pumps 1983 PVC tanks 510 No of water supply Zones 112 No of tanker trips per day 1000 Qty supplied through tankers 40 lac lit

5 Description of water connections Total Connections Working connections Metered Connections Flat rate connections 4731 Domestic Connections Non Domestic Industrial Connections 2031 Public Stand Post 1170

6 Present Scenario Demand 4197 lac lit Supply 3400 lac lit Deficit 797 lac lit

7 Water supply system Water supply to different distribution zones is being done though head works consisting of tube wells, Clear Water reservoirs, pumping stations, Service Reservoirs. Water supply to different distribution zones is being done though head works consisting of tube wells, Clear Water reservoirs, pumping stations, Service Reservoirs. Water is collected from tube wells and collected into CWR pumped to SR and supplied during supply hrs. Water is collected from tube wells and collected into CWR pumped to SR and supplied during supply hrs. Surplus water is transferred to deficit zones thorough transfer mains as ground water availability is not uniform thorough out the city. Surplus water is transferred to deficit zones thorough transfer mains as ground water availability is not uniform thorough out the city. Water Supply to walled city is from Amanishah head works, Ramniwas head works and Laxman Doongri Head works. Water Supply to walled city is from Amanishah head works, Ramniwas head works and Laxman Doongri Head works. The supply in walled city is maintained in Chowkri wise zones The supply in walled city is maintained in Chowkri wise zones The total demand of city is maintained from water production from 1897 tube wells yielding 290 mld water and 50 mld from Bisalpur System. The total demand of city is maintained from water production from 1897 tube wells yielding 290 mld water and 50 mld from Bisalpur System.

8 Month wise water demand from Bisalpur Jaipur Project S.No. Name of Distribution Centre Jan-11Feb-11Mar-11Apr-11May-11Jun-11Jul-11 1Pratap nagar Sec Pratap nagar Sec Shanti Nagar Civil lines Mahesh Nagar Maharani Farm Ram Niwas Bagh Bapu Nagar Himmat Nagar Jawahar Nagar Adarsh Nagar Sindhi Colony Truck Stand Jagatpura Malviya Nagar Malviya Nagar Barkat Nagar Jyoti Nagar Jhotwara Murlipura Gopalbari Sanganer Water transfer to Jhotwara shall be maintained by discontinueing water transfer 2.4 mld to Amanishah 2. Water transfer to Gopalbari shall be made from Shanti Nagar Pumping Station. 3. Water transfer to Pratap Nagar Sec 26 shall be made through Pratap Nagar Water transfer to Murlipura shall be maintained by discontinueing water transfer 2 to 3 mld to Amanishah

9 Design demand from Bisalpur System YearDesign Demand (mld)

10 Bisalpur System The Bisalpur System consists of two parts The Bisalpur System consists of two parts Transmission System Transmission System Transfer System. Transfer System. Transmission System consists of Transmission System consists of Raw water from Bisalpur Dam is pumped to filter plant 400 mld at Surajpura Raw water from Bisalpur Dam is pumped to filter plant 400 mld at Surajpura Filteration and Chlorination at filter plant Filteration and Chlorination at filter plant Treated water is transferred to rural areas and Jaipur City upto Balawala pumping station Treated water is transferred to rural areas and Jaipur City upto Balawala pumping station

11 Transmission system contd….. Pipelines Pipelines Central Feeder from Balawala to Jawahar Circle, Ramniwas Bagh, Amanishah, Shastri Nagar, Vidhyadhar Nagar, VKI area. Jawahar Circle to Mahesh Nagar, Triveni Nagar, Barkat Nagar. Rambagh to Jypti Nagar, Civil Lines, Shanti Nagar. Central Feeder from Balawala to Jawahar Circle, Ramniwas Bagh, Amanishah, Shastri Nagar, Vidhyadhar Nagar, VKI area. Jawahar Circle to Mahesh Nagar, Triveni Nagar, Barkat Nagar. Rambagh to Jypti Nagar, Civil Lines, Shanti Nagar. Western feeder from Balawala to Mansarovar, Shyam Nagar, Vidhyut Nagar, Khatipura, Jhotwara Western feeder from Balawala to Mansarovar, Shyam Nagar, Vidhyut Nagar, Khatipura, Jhotwara

12 Tanker transportation of water Tanker transportation of water is being done in connected as well as unconnected areas of city throughout the year. Tanker transportation of water is being done in connected as well as unconnected areas of city throughout the year. Tanker transportation of water is being done mainly in areas along Agra Road, Jagatpura, along Delhi By Pass road where there is no distribution system. In addition to this tail end areas of distribution system of walled city, Murlipura, Jhotwara, Shastri Nagar, Jawahar Nagar Kachhi Basti, Jhalana, Pratap Nagar, Khatipura, Hasanpura, 22 godam kachhi basti, Barkat Nagar etc. Tanker transportation of water is being done mainly in areas along Agra Road, Jagatpura, along Delhi By Pass road where there is no distribution system. In addition to this tail end areas of distribution system of walled city, Murlipura, Jhotwara, Shastri Nagar, Jawahar Nagar Kachhi Basti, Jhalana, Pratap Nagar, Khatipura, Hasanpura, 22 godam kachhi basti, Barkat Nagar etc. Improvement in distribution system is being done for ex. Top Khanna Hazauri, Mandi Khitikan, Kanwar Nagar, Kamela Ki gali, Jagatpura etc. Improvement in distribution system is being done for ex. Top Khanna Hazauri, Mandi Khitikan, Kanwar Nagar, Kamela Ki gali, Jagatpura etc. Nos of tanker trips during summers was about The present no of trips is about Out this about 300 are running in outer unconnected areas and balance in the connected areas. Nos of tanker trips during summers was about The present no of trips is about Out this about 300 are running in outer unconnected areas and balance in the connected areas.

13 Tanker transportation contd.. The sanction for water transportation in previous years has been issued by department, during the year and upto was issued under Central Relief Fund. The sanction for water transportation in previous years has been issued by department, during the year and upto was issued under Central Relief Fund. Sanction of water transportation from is still pending proposals for sanction has already been submitted. Sanction of water transportation is urgently required so that the work is regularised and payment is made to the contractors, the contractors are pressing hard for payment who may stop the work due to non payment. Sanction of water transportation from is still pending proposals for sanction has already been submitted. Sanction of water transportation is urgently required so that the work is regularised and payment is made to the contractors, the contractors are pressing hard for payment who may stop the work due to non payment. Proposals for sanction of water transportation from April 2011 to July 2011, has also been submitted for sanction. Proposals for sanction of water transportation from April 2011 to July 2011, has also been submitted for sanction.

14 Details of Contingency schemes sanctioned Contingency Scheme Summer 2009 Ph I estimated cost Rs 340 lacs Contingency Scheme Summer 2009 Ph I estimated cost Rs 340 lacs 40 tube wells drilled and commissioned 40 tube wells drilled and commissioned 10 hand pumps drilled and commissioned 10 hand pumps drilled and commissioned Contingency Scheme Summer 2009 Ph II estimated cost Rs lacs Contingency Scheme Summer 2009 Ph II estimated cost Rs lacs 85 tube wells sanctioned 85 drilled 78 commissioned 85 tube wells sanctioned 85 drilled 78 commissioned 50 single point tubewells 49 drilled & commissioined 50 single point tubewells 49 drilled & commissioined 30 hand pumps 26 drilled and commissioned 30 hand pumps 26 drilled and commissioned During the current financial year there is no contingency scheme. All the works are to be executed under plan During the current financial year there is no contingency scheme. All the works are to be executed under plan

15 Pollution Mitigation works Name of SchemeYearEstimated Cost Sanctioned length Physical Progress Walled City I Kamela Area Walled City II Pollution Mitigation walled city Replacement of pipelines in outer areas Total

16 Water Quality Assurance and Monitoring Regular chlorination of water is done by bleaching powder at pumping stations. Regular chlorination of water is done by bleaching powder at pumping stations. Pumping stations under Bisalpur Project are provided with gas chlorination. Pumping stations under Bisalpur Project are provided with gas chlorination. 100 online chlorination plants has been installed on tube wells. 100 online chlorination plants has been installed on tube wells. 12 Electro-chlorinators are working in pump houses. 12 Electro-chlorinators are working in pump houses. Daily water samplings are done for residual chlorine and bacteriological examination. Daily water samplings are done for residual chlorine and bacteriological examination.

17 24 X 7 water supply in pilot areas A MOU was signed among Ranhill Co Malaysia MJP and Govt. of Rajasthan A MOU was signed among Ranhill Co Malaysia MJP and Govt. of Rajasthan Pilot project for 24 hrs water supply has been started in 4 zones of Jaipur City. Pilot project for 24 hrs water supply has been started in 4 zones of Jaipur City. Mansarovar Sec 1 Mansarovar Sec 1 Mansarovar Sec 3 Mansarovar Sec 3 Mansarovar Sec 9 Mansarovar Sec 9 Malviya Nagar Sec 9 Malviya Nagar Sec 9 These zones are provided with separate pipe lines from Service Reservoir, along with bulk meter for metering. Non functional consumer meters are also replaced. Daily meter reading are taken of consumer meter readings and bulk meters.

18 24x7 contd.. The sector wise number of consumers are Mansarovar Sec 1 – 139, Sec3 -295, Sec 9 – 135 and Malviya Nagar Sec 9 – 140. The sector wise number of consumers are Mansarovar Sec 1 – 139, Sec3 -295, Sec 9 – 135 and Malviya Nagar Sec 9 – 140. During the execution of work IEC activities were done to educate the consumers for water conservation and check all possible leakages in side the property. It was observed that there were leakages from the under ground water storage tanks. During the execution of work IEC activities were done to educate the consumers for water conservation and check all possible leakages in side the property. It was observed that there were leakages from the under ground water storage tanks. The results of pilot study are encouraging, in general the water demand has been slightly higher than intermittent supply. The results of pilot study are encouraging, in general the water demand has been slightly higher than intermittent supply. Leakage levels has come down both in the distribution system and at the consumer end. Leakage levels has come down both in the distribution system and at the consumer end. It is proposed to extent the coverage in the adjoining areas. It is proposed to extent the coverage in the adjoining areas. It has been proposed to start the project in other distribution centers such as Kanwar Nagar, Jawahar Nagar, Nehru Nagar etc. It has been proposed to start the project in other distribution centers such as Kanwar Nagar, Jawahar Nagar, Nehru Nagar etc.

19 Improvement of existing distribution centers Bas badanpura:- Sanction for laying of pipeline and rehabiliation of CWR at Laxman Doongri and RWR at Intermediate pumping station for Rs lacs was issued by Finance Committee in its 607 th meeting held on Pipes has been received. The work of laying of pipe lines has been started. Bas badanpura:- Sanction for laying of pipeline and rehabiliation of CWR at Laxman Doongri and RWR at Intermediate pumping station for Rs lacs was issued by Finance Committee in its 607 th meeting held on Pipes has been received. The work of laying of pipe lines has been started. Shastri Nagar:- Sanction for laying of pipeline, construction of tubewells, construction of Service Reservoir and Clear Water Reservoir along with pumping machinery was accorded by Finance Committee in its 607 th meeting held on Work order has been placed and is likely to start by I week of April. Shastri Nagar:- Sanction for laying of pipeline, construction of tubewells, construction of Service Reservoir and Clear Water Reservoir along with pumping machinery was accorded by Finance Committee in its 607 th meeting held on Work order has been placed and is likely to start by I week of April.

20 Assessment of water Metering is an important tool for water management. Thing which is not measured is not managed. Metering is an important tool for water management. Thing which is not measured is not managed. There are metered connections in Jaipur Water Supply Scheme. There are metered connections in Jaipur Water Supply Scheme. In general about 60 % meters are functional. Replacement of water meters is not been done due to shortage of staff, low meter repair rate. During the current financial year consumer meters has been replaced. In general about 60 % meters are functional. Replacement of water meters is not been done due to shortage of staff, low meter repair rate. During the current financial year consumer meters has been replaced. To over come above situation it is proposed to out source the work of installation of water meters for 7 years including O&M. Tenders for Rs 700 lacs has been invited. To over come above situation it is proposed to out source the work of installation of water meters for 7 years including O&M. Tenders for Rs 700 lacs has been invited.

21 Water Assessment Contd… In addition to this out of 1897 tube wells bulk water meters are provided on 1276 tube wells. In addition to this out of 1897 tube wells bulk water meters are provided on 1276 tube wells. Water inflow to CWR from tube wells is also measured by Bulk Water meters installed under Bisalpur Project and monitored by SCADA. Water inflow to CWR from tube wells is also measured by Bulk Water meters installed under Bisalpur Project and monitored by SCADA. It is also proposed to install bulk water meters on all inflows to CWRs. It is also proposed to install bulk water meters on all inflows to CWRs. Bulk Meters are also proposed to install at distribution centers for measurement of supply qty. Bulk Meters are also proposed to install at distribution centers for measurement of supply qty.

22 Present Scenario of Ground Water As per design 418 mld water was to be supplied from Bisalpur Project and 100 mld water from tube wells, where as the present situation is almost reverse. This has put immense pressure on ground water. As per design 418 mld water was to be supplied from Bisalpur Project and 100 mld water from tube wells, where as the present situation is almost reverse. This has put immense pressure on ground water. Increased rate of tube well failure due to drop in water table. Increased rate of tube well failure due to drop in water table. Reduced yield of new tube wells being constructed in recent years. Reduced yield of new tube wells being constructed in recent years. In addition to tube wells drilled by department for drinking water there are large number of tube wells drilled by private owners, using water indiscriminately. In addition to tube wells drilled by department for drinking water there are large number of tube wells drilled by private owners, using water indiscriminately. As per studies there is an over drawl of more than 600% of ground water in Jaipur City. As per studies there is an over drawl of more than 600% of ground water in Jaipur City. Areas such as Jhotwara, Murlipura, Jagatpura, Malviya Nagar, part of Mansarovar, Bapu Nagar, C Scheme, Jawahar Nagar etc are almost dry. Areas such as Jhotwara, Murlipura, Jagatpura, Malviya Nagar, part of Mansarovar, Bapu Nagar, C Scheme, Jawahar Nagar etc are almost dry.

23 Remedial Measures Rain water harvesting structures should be made mandatory for all houses, existing as wells as new. Presently, it is mandatory for houses with more than 300 sqm. Rain water harvesting structures should be made mandatory for all houses, existing as wells as new. Presently, it is mandatory for houses with more than 300 sqm. Roof top artificial recharge structure should be constructed in all govt. buildings and private properties. Roof top artificial recharge structure should be constructed in all govt. buildings and private properties. There are three big industrial areas in town, VKIA, Jhotwara and Sitapura, there are big plots with huge open areas. The industrialist should be persuaded to construct rain water harvesting structures and artificial recharge structures for recharging the aquifer. There are three big industrial areas in town, VKIA, Jhotwara and Sitapura, there are big plots with huge open areas. The industrialist should be persuaded to construct rain water harvesting structures and artificial recharge structures for recharging the aquifer. Artificial recharge structures should be constructed at road side depressions where water is accumulated for small duration during rainy season. Artificial recharge structures should be constructed at road side depressions where water is accumulated for small duration during rainy season. To initiate the process, department has decided to construct 100 artificial recharge structures on abandoned tube wells before on coming rainy season. To initiate the process, department has decided to construct 100 artificial recharge structures on abandoned tube wells before on coming rainy season.

24 Problems Illegal connections. Illegal connections. Long distance connections. Long distance connections. Equitable distribution of water in distribution zones Equitable distribution of water in distribution zones Increasing demand, reduced availability of water Increasing demand, reduced availability of water Low pressure, short supply and tail end problems Low pressure, short supply and tail end problems Pollution problems in drinking water Pollution problems in drinking water Choking and over flowing of sewers, seepage from manhole chambers Choking and over flowing of sewers, seepage from manhole chambers

25 Problems Depleting ground water resources and poor storage of water in Bisalpur Dam. Depleting ground water resources and poor storage of water in Bisalpur Dam. Increasing multi story buildings in developed areas Increasing multi story buildings in developed areas Water supply to areas developed by colonisers in outer areas of city. Water supply to areas developed by colonisers in outer areas of city. Water supply to unconnected areas Water supply to unconnected areas Tanker transportation Tanker transportation Extensive use of online boosters during water supply hours. Extensive use of online boosters during water supply hours. Energy efficiency of the system Energy efficiency of the system

26 Departments planning for water management Recently department has started the work of Water Audit, under which accounting of entire quantity of water right from source to consumer end shall be done. This will help in reduction of water loss. Recently department has started the work of Water Audit, under which accounting of entire quantity of water right from source to consumer end shall be done. This will help in reduction of water loss. To achieve equitable distribution of water to consumers department has initiated the work of installation of orifice flow equaliser. To achieve equitable distribution of water to consumers department has initiated the work of installation of orifice flow equaliser. For monitoring daily water supply bulk meters are installed on nearly two third tube wells. Bulk meters are provided at the inlet of CWR under Bisalpur Project to measure water transferred from the Dam to distribution system. This is being monitored under central SCADA system. For monitoring daily water supply bulk meters are installed on nearly two third tube wells. Bulk meters are provided at the inlet of CWR under Bisalpur Project to measure water transferred from the Dam to distribution system. This is being monitored under central SCADA system. It is further planned to provide bulk meters on all tube wells and out lets on all head works. It is further planned to provide bulk meters on all tube wells and out lets on all head works.

27 Departments planning for water management For improvement of system following works are sanctioned: Replacement of old inefficient pumping machinery of pump houses Replacement of old inefficient pumping machinery of pump houses Replacement of old inefficient submersible pumping sets of tube wells work has been started in Malviya Nagar and Jagatpura. Replacement of old inefficient submersible pumping sets of tube wells work has been started in Malviya Nagar and Jagatpura. Replacement of these leaky valves of pump houses and Service Reservoirs by soft seated valves and butterfly valves. Replacement of these leaky valves of pump houses and Service Reservoirs by soft seated valves and butterfly valves. Installation of electro chlorinator at 28 pumping stations of Jaipur city on BOOT is under process. Installation of electro chlorinator at 28 pumping stations of Jaipur city on BOOT is under process. Commissioning of Kanwar Nagar Water Supply Scheme is under progress, the work is likely to be completed by mid of April Commissioning of Kanwar Nagar Water Supply Scheme is under progress, the work is likely to be completed by mid of April 2011.

28 Ongoing and proposed works Work of laying 600 mm pipeline in Ghat Bazar is complete, testing of pipeline is under progress. This pipe line shall improve pressures in Choukri Ghat, Ramchanderji, Top Khanna Hazauri, Modi Khanna, Vishwarji. Work of laying 600 mm pipeline in Ghat Bazar is complete, testing of pipeline is under progress. This pipe line shall improve pressures in Choukri Ghat, Ramchanderji, Top Khanna Hazauri, Modi Khanna, Vishwarji. The Service Reservoir at Malviya Nagar Sec 2 has been commissioned, this has improved water supply in the area. The Service Reservoir at Malviya Nagar Sec 2 has been commissioned, this has improved water supply in the area. Pipe line in Top Khanna Desh has been commissioned, tail end pressures has been increased by 3m. Pipe line in Top Khanna Desh has been commissioned, tail end pressures has been increased by 3m. The work of interconnections of pipeline is under progress in Gangapole area. The work of interconnections of pipeline is under progress in Gangapole area. The work of developing new distribution zone of Kho Nagorian already sanctioned under Bisalpur Project is under consideration for taking up under state plan. The work of developing new distribution zone of Kho Nagorian already sanctioned under Bisalpur Project is under consideration for taking up under state plan.

29 Ongoing and proposed works Overall water supply in Malviya Nagar Sec 9 distribution zone has been improved. Overall water supply in Malviya Nagar Sec 9 distribution zone has been improved. The overall scenario of water supply of Jaipur City was reviewed by the Addl. Chief Engineer, 85 works for improvement of water supply were identified of estimated cost Rs 59 crores. These works shall be executed during financial year after getting necessary sanctions. The overall scenario of water supply of Jaipur City was reviewed by the Addl. Chief Engineer, 85 works for improvement of water supply were identified of estimated cost Rs 59 crores. These works shall be executed during financial year after getting necessary sanctions. To mitigate problem of water pollution in walled city, pipe lines identified as pollution prone has been replaced. It is further planned to execute the work of replacement of remaining pipe lines in Ghat Choukri, Choukri Ramchander ji, Top Khanna Desh and Top Khanna Hazauri including consumer service connections. To mitigate problem of water pollution in walled city, pipe lines identified as pollution prone has been replaced. It is further planned to execute the work of replacement of remaining pipe lines in Ghat Choukri, Choukri Ramchander ji, Top Khanna Desh and Top Khanna Hazauri including consumer service connections.

30 Interventions required Increased allocation of water from Bisalpur Project Increased allocation of water from Bisalpur Project 124 tube wells has been identified yielding very low discharge or gone dry. Proposals has been submitted for A & F sanction. 124 tube wells has been identified yielding very low discharge or gone dry. Proposals has been submitted for A & F sanction. Sanction for water transportation. Sanction for water transportation. There 4 Executive Engineers, 24 Assistant Engineers and 51 Junior Engineers under city circle Jaipur. There are only 7 vehicles to provide vehicular support to these officers. There are no sanctions of vehicles for urban water supply schemes. Necessary sanctions may be accorded for sanction of 23 vehicles along with revised monthly rent of Rs against Rs sanctioned by finance deptt. As vehicles are not available at these rated considering the present POL rates. There 4 Executive Engineers, 24 Assistant Engineers and 51 Junior Engineers under city circle Jaipur. There are only 7 vehicles to provide vehicular support to these officers. There are no sanctions of vehicles for urban water supply schemes. Necessary sanctions may be accorded for sanction of 23 vehicles along with revised monthly rent of Rs against Rs sanctioned by finance deptt. As vehicles are not available at these rated considering the present POL rates.

31 Thanks