Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG11 Snapshot September ‘10

Similar presentations


Presentation on theme: "WG11 Snapshot September ‘10"— Presentation transcript:

1 WG11 Snapshot September ‘10
doc.: IEEE /0942r0 September 2010 WG11 Snapshot September ‘10 Date: Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

2 September 2010 doc.: IEEE /0942r0 September 2010 WG11 Task Group TGp PAR expires Dec 31, not needed, published TGu PAR expires Dec 31, extension approved by EC TGs PAR expires Dec 31, extension approved by EC & submitted to NesCom TGv PAR expires Dec 31, extension approved by EC Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

3 WG11 Task & Study Group Officers - Roster
September 2010 doc.: IEEE /0942r0 September 2010 WG11 Task & Study Group Officers - Roster Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro P Lee Armstrong none Wayne Fisher Susan Dickey S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt U Necati Canpolat Dave Stephenson V Emily Qi -OPEN- Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- AD Eldad Perahia Vinko Erceg, James Yee Carlos Cordeiro AE Henry Ptasinski AF Richard Kennedy Zhou Lan SG S1G Dave Halasz FIA Hiroshi Mano Marc Emmelmann SC WNG Clint Chaplin Ad hoc ARC Dave Bagby JTC1 Andrew Myles REG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

4 WG11 Task & Study Group Officers - Sep adjustments
September 2010 doc.: IEEE /0942r0 September 2010 WG11 Task & Study Group Officers - Sep adjustments Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt U none Necati Canpolat Dave Stephenson V Emily Qi -OPEN- Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- AD Eldad Perahia Vinko Erceg, James Yee Carlos Cordeiro AE Henry Ptasinski AF Richard Kennedy Zhou Lan SG S1G Dave Halasz FIA Hiroshi Mano Marc Emmelmann SC WNG Clint Chaplin Ad hoc ARC Dave Bagby JTC1 Andrew Myles REG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

5 IEEE 802.11 Standards Pipeline
September 2010 doc.: IEEE /0942r0 September 2010 IEEE Standards Pipeline 802.11mb Maintenance k+r+y 802.11z TDLS MAC 802.11aa Video Transport e QoS 802.11s Mesh 802.11u WIEN 802.11r Fast Roam h DFS & TPC 802.11k RRM 802.11V Network Management i Security 802.11Y Contention Based Protocol Smart Grid f Inter AP 802.11ae QoS Mgmt Frm 802.11p WAVE FIA 802.11af TVWS a 54 Mbps 5GHz S1G 802.11n High Throughput (>100 Mbps) g 54 Mbps 2.4GHz 802.11ac VHT 5GHz 802.11W Management Frame Security 802.11ad VHT 60GHz 802.11b (’99) 11 Mbps 2.4GHz Published Amendment Discussion Topics Study groups TG without draft TG Letter Ballot Sponsor Ballot Published Standard PHY Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

6 WG11 Editor Abstract / Agenda – Sept 2010
July 2007 March 2010 September 2010 doc.: IEEE /0990r1 doc.: IEEE /0942r0 September 2010 WG11 Editor Abstract / Agenda – Sept 2010 Roll Call / Contacts / Reflector Go round table and get brief status report Review action items from previous meeting Numbering Alignment process – its great importance to all our drafts Amendment Ordering / ANA Status / Draft Snapshots Framemaker v9 transition January 2011 RevCom preparation process discussion Slide 6 Slide 6 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 6 Page 6 Terry Cole (AMD) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

7 WNG SC – September 2010 Review of objectives
May 2008 September 2010 doc.: IEEE /0942r0 September 2010 WNG SC – September 2010 Review of objectives Smart Grid and Key Lengths ( wng-smart-grid-key-lengths.pptx) – Dave Halasz “Internet of Things” (11-10-xxxx) – Bill Carney Review Objectives for November 2010 Meeting Bruce Kraemer (Marvell) 7 Page 7 Bruce Kraemer (Marvell)

8 IEEE 802.11 ARC SC – September 2010 802.11 ARC SC meets “as needed”
May 2008 September 2010 doc.: IEEE /0547r0 doc.: IEEE /0942r0 September 2010 IEEE ARC SC – September 2010 ARC SC meets “as needed” Topics for July 802 Plenary & teleconfernces 802.1 architecture document revision effort There were no meetings re the architecture revision project until November No meeting in September Slide 8 David Bagby (Calypso Ventures, Inc) Bruce Kraemer (Marvell) Page 8 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

9 September 2010 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0942r0 September 2010 TGmb - September 2010 Draft 5.0 was balloted in LB167, to LB 167 votes = Pool 246, 173 affirmative – 93%, 14 Disapprove, 25 Abstain LB 167 comments = 16 comments All required comments withdrawn; One MEC comment requires a change to clause 1 (scope, purpose) in the Draft, to align with PAR Major task of this meeting is approval of D6.0, and preparation for SB; agenda in Plan to incorporate published amendments (11p, 11z, 11v, 11u) during SB process Slide 9 Bruce Kraemer (Marvell) John Doe, Some Company Page 9 John Doe, Some Company Bruce Kraemer (Marvell)

10 September 2009 November 2009 September 2010 doc.: IEEE xxx doc.: IEEE /0547r0 doc.: IEEE /0942r0 September 2010 IEEE s Mesh Networking TGs Draft 7.0 passed LB#166 (closing August 13) with 94.9% approval and 11 comments. Approval rate was up by 6.2% from previous LB #165 TGs draft agenda is in submission 11-10/1034r0. The focus is on Comment resolution Evaluation of the professional editing process The goal is to go for clean recirculation of the Draft and then to proceed to Sponsor Ballot The sponsor pool has been opened editorial technical Comments from LB 165 4 36% 7 64% Slide 10 Slide 10 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 10 Page 10 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

11 September 2010 May 2008 doc.: IEEE /0547r0 doc.: IEEE /0942r0 September 2010 IEEE u – September 2010 Review of CRC Teleconferences since last meeting 4th Re-circulation Sponsor Ballot Comment Resolution Conditional RevCom Approval Current progress Schedule Liaison to IEEE , regarding summary of u emergency services Slide 11 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 11 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

12 TGv – September 2010 This week
doc.: IEEE /0942r0 September 2010 TGv – September 2010 This week Comment resolution, recirculation SB; Agenda in document Fifth Recirculation SB (closed 28 July 2010) results 161 in ballot pool, 138/3/7 Y/N/A : 97.87% approve, 2% disapprove 1668 comments received, 1096 Technical, 560 Editorial, 2 General (1038 comments expand/duplicate 7 prior ballot comments) Comments in Sixth Recirculation SB (closed 25 August 2010) results 161 in ballot pool, 140/3/7 Y/N/A : 97.9% approve, 2% disapprove 1099 comments received, 1092 Technical, 3 Editorial, 4 General (1039 comments expand/duplicate 7 prior ballot comments) Comments in Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

13 IEEE 802.11z – September 2010 Hawaii
The final z recirculation sponsor ballot on draft D13.0 passed with 97% approval rate 126 yes, 3 no, 8 abstain 0 comments received This means that 11z has met the conditions for going to RevCom P802.11z is on the agenda for the RevCom meeting in September There are no items of business for TGz during the Hawaii meeting Slide 13 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

14 IEEE 802.11aa – Waikoloa, Hawaii
September 2010 May 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0942r0 September 2010 IEEE aa – Waikoloa, Hawaii Goals: Resolve LB164 comments and approve corresponding resolutions Start recirculation letter ballot Opening report in document 10/0969r0 Slide 14 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 14 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

15 September 2010 May 2008 doc.: IEEE /0942r0 doc.: IEEE /xxxxr0 September 2010 September 2010 IEEE ac – September 2010 Continue with Ad Hoc group meetings and straw polls Continue the development of the Specification Framework document. r13 is the current approved revision of the TGac Specification Framework document. Technical contributions Agenda in document r0 Slide 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

16 TGad – September Meeting Goals
doc.: IEEE /0942r0 September 2010 TGad – September Meeting Goals Complete Comment Resolution ITU-R 60 GHz liaison Joint meeting w/ on Wed 16:00-18:00 CWPAN liaison report LB on D1.0 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

17 TGae September 2010 Summary
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0942r0 September 2010 TGae September 2010 Summary TG Secretary Address comments received during TG review of D0.01 Prepare for first WG LB. Revise plan of record. Slide 17 Bruce Kraemer (Marvell) John Doe, Some Company Page 17 John Doe, Some Company Bruce Kraemer (Marvell)

18 TGaf – Meeting Goals September 2010
Review teleconference progress Resolve Internal Review comments Make necessary edits to the draft Create draft d1.0 First WG Letter Ballot (if FCC has released the TVWS R&O) Plan for November Plenary in Dallas Slide 18 Slide 18 Bruce Kraemer (Marvell)

19 IEEE 802.11 S1G SG – Waikoloa , September 2010
May 2008 doc.: IEEE /0942r0 doc.: IEEE /xxxxr0 September 2010 September 2010 IEEE S1G SG – Waikoloa , September 2010 Goals for the Waikoloa Meeting: Submissions to prepare for Task Group Use cases Areas that may be affected in the MAC Channel Models etc Slide 19 Dave Halasz (Aclara) Bruce Kraemer (Marvell) Page 19 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

20 IEEE 802.11 FIA SG – Waikoloa , September 2010
May 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0942r0 September 2010 IEEE FIA SG – Waikoloa , September 2010 Goals for the San Diego Meeting: Edit and approve draft of PAR & 5C WG Approval of PAR & 5C Plan for November Plenary and Teleconference Slide 20 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 20 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

21 September 2010 May 2008 doc.: IEEE /0547r0 doc.: IEEE /0942r0 September 2010 IEEE JTC1 ad hoc – Sept 2010 The agenda items that will be addressed this week are: Approval of minutes from previous meetings Review goals of JTC1 ad hoc Review status of Sponsor Ballot drafts sent to ISO/IEC JTC1/SC6 Review WAPI status in ISO/IEC JTC1/SC6 Discuss upcoming SC6 meeting agenda Review status of elements of WAPI in JTC1/SC27 Discuss any other JTC1/SC6 liaison matters Slide 21 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 21 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

22 Regulatory Ad Hoc Committee Meeting Goals September 2010
The regulatory summaries Regulatory issues status The impending FCC TVWS rulings SE43 Update Ofcom position on sensing in the TVWS EN revision update; actions in TG11 and TG28 FCC 5 GHz rules changes update; full band for indoor use Critical issues actions Peer-to-Peer regulatory issues in the 5 GHz bands Slide 22 Bruce Kraemer (Marvell)

23 Smart Grid – September 2010 Tuesday pm1
doc.: IEEE /0942r0 September 2010 Smart Grid – September 2010 Tuesday pm1 Open Forum for discussing in depth what change suggestions 802 should submit for NIST Smart Grid PAP#2 Thursday am1 Update of activities in P2030 Open SG Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

24 September 2010 Recent Ballots July - September Bruce Kraemer (Marvell)

25 P802.11z – 4th Sponsor Recirculation
September 2010 P802.11z – 4th Sponsor Recirculation The fourth IEEE P802.11z (Extensions to Direct Link Setup) 16 day recirculation Sponsor Ballot asked the question “Should  P802.11z  Draft 11.0 be forwarded to RevCom?” The official results for this Sponsor Ballot  follow: Ballot Opening Date:   Monday  July 19, 2010 - 23:59 ET Ballot Closing Date:     Wednesday      August 04, 2010 - 23:59 ET  RESPONSE RATE: 144 eligible people are in this ballot group.     123 affirmative votes 6 negative votes with comments 0 negative votes without comments 8 abstention votes ======= 137  votes received  =  95.1 % valid returns                        =  % valid abstentions   APPROVAL RATE: 123  affirmative votes       =      95.3 % affirmative     total negative votes  =    4.7  % negative The motion passes. There were 12 comments received Bruce Kraemer (Marvell)

26 P802.11z – 5th Sponsor Recirculation
September 2010 P802.11z – 5th Sponsor Recirculation The fifth IEEE P802.11z (Extensions to Direct Link Setup) 10 day recirculation Sponsor Ballot asked the question “Should  P802.11z  Draft 12.0 be forwarded to RevCom?” The official results for this Sponsor Ballot  follow: Ballot Opening Date:   Friday  August 06, 2010 - 23:59 ET Ballot Closing Date:     Monday      August 16, 2010 - 23:59 ET  RESPONSE RATE: 144 eligible people are in this ballot group.     124 affirmative votes 5 negative votes with comments 0 negative votes without comments 8 abstention votes ======= 137  votes received  =  95.1 % valid returns                          =  % valid abstentions   APPROVAL RATE: 124  affirmative votes       =      96.1 % affirmative     total negative votes  =      % negative The motion passes. There were 0 comments received Bruce Kraemer (Marvell)

27 P802.11z – 6th Sponsor Recirculation
September 2010 P802.11z – 6th Sponsor Recirculation The sixth IEEE P802.11z (Extensions to Direct Link Setup) 10 day recirculation Sponsor Ballot asked the question “Should  P802.11z  Draft 13.0 be forwarded to RevCom?” The official results for this Sponsor Ballot  follow: Ballot Opening Date:   Thursday  August 19, 2010 - 23:59 ET Ballot Closing Date:     Sunday      August 29, 2010 - 23:59 ET  RESPONSE RATE: 144 eligible people are in this ballot group.     126 affirmative votes 3 negative votes with comments 0 negative votes without comments 8 abstention votes ======= 137  votes received  =  95.1 % valid returns                          =  % valid abstentions   APPROVAL RATE: 126  affirmative votes       =      97.7 % affirmative     total negative votes  =      % negative The motion passes. There were zero comments received Bruce Kraemer (Marvell)

28 P802.11v – 5th Sponsor Recirculation
September 2010 P802.11v – 5th Sponsor Recirculation The 10day, fifth recirculation Sponsor Ballot for IEEE P802.11v (Wireless Network Management) asked the question “Should  P802.11v  Draft 13.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date:   Sunday  July 18, 2010 - 23:59 ET Ballot Closing Date:     Wednesday       July 28, 2010 - 23:59 ET  RESPONSES: 161 eligible people are in this ballot group.     138 affirmative votes 3 negative votes with comments 0 negative votes without comments 7 abstention votes ======= 148  votes received  =  91.9% valid returns                            =  % valid abstentions   APPROVAL RATE: 138  affirmative votes       =     97.9 % affirmative 3  total negative votes  =      2.1  % negative The Motion passes. There were 1668 comments received Bruce Kraemer (Marvell)

29 P802.11v – 6th Sponsor Recirculation
September 2010 P802.11v – 6th Sponsor Recirculation The 15 day, sixth recirculation Sponsor Ballot for IEEE P802.11v (Wireless Network Management) asked the question “Should  P802.11v  Draft 14.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date:   Tuesday  August 10, 2010 - 23:59 ET Ballot Closing Date:     Wednesday       August 25, 2010 - 23:59 ET  RESPONSES: 161 eligible people are in this ballot group.    140 affirmative votes 3 negative votes with comments 0 negative votes without comments 7 abstention votes ======= 150  votes received  =  93.2% valid returns                          =  % valid abstentions   APPROVAL RATE: 140  affirmative votes       =     97.9 % affirmative 3  total negative votes  =      2.1  % negative The Motion passes. There were 1099 comments received Bruce Kraemer (Marvell)

30 P802.11u - 3nd Sponsor Recirculation
September 2010 P802.11u - 3nd Sponsor Recirculation The 10 day IEEE P802.11u (Interworking with External Networks) 3rd recirculation Sponsor Ballot asked the question “Should  P802.11u  Draft 11.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date:   Tuesday  August 03 , 2010 - 23:59 ET Ballot Closing Date:     Friday       August 13, 2010 - 23:59 ET  RESPONSE RATE: 154 eligible people are in this ballot group.   124 affirmative votes 5 negative votes with comments 0 negative vote without comments 14 abstention votes ======= 143  votes received  =  92.9 % returns                  =  9.8% valid abstentions   APPROVAL RATE: 124  affirmative votes       =      96.1 % affirmative    5  total negative votes  =       % negative Motion passes There were 18 comments received Bruce Kraemer (Marvell)

31 P802.11u – 4th Sponsor Recirculation
September 2010 P802.11u – 4th Sponsor Recirculation The 10 day IEEE P802.11u (Interworking with External Networks) 4th recirculation Sponsor Ballot asked the question “Should  P802.11u  Draft 12.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date:   Thursday  September 02 , 2010 - 23:59 ET Ballot Closing Date:     Sunday       September 12, 2010 - 23:59 ET  RESPONSE RATE: 154 eligible people are in this ballot group.   127 affirmative votes 2 negative votes with comments 0 negative vote without comments 14 abstention votes ======= 143  votes received  =  92.9 % returns                          =  9.8% valid abstentions   APPROVAL RATE: 127  affirmative votes       =      98.4 % affirmative    2  total negative votes  =       % negative Motion passes There were zero comments received Bruce Kraemer (Marvell)

32 P802.11s – 4th WG Recirculation
September 2010 P802.11s – 4th WG Recirculation IEEE WG Letter Ballot #166 was a 15 day Working Group technical (4th) recirculation Ballot asking the question "Should P802.11s D7.0 be forwarded to Sponsor Ballot?". The official results follow: Ballot Opening Date:    Thursday July 29, 2010 - 23:59 ET Ballot Closing Date:   Friday August 13, 2010 - 23:59 ET  RESPONSES: 248 eligible people are in this ballot group.     167 affirmative votes  9 negative votes     34 abstention votes ===   210 votes received = % valid returns                            =  16.19% valid abstentions   APPROVAL RATE: 167  affirmative votes       =   % affirmative   9  total negative votes  =     % negative Motion passes. There were 11 comments received. Bruce Kraemer (Marvell)

33 P802.11rev/mb – 4th WG Recirculation
September 2010 P802.11rev/mb – 4th WG Recirculation Ballot #167 was a 15 day Working Group technical recirculation Ballot asking the question "Should P802.11mb D5.0 be forwarded to Sponsor Ballot?". The Official results are: Ballot Opening Date:    Wednesday August 04, 2010 - 23:59 ET Ballot Closing Date:   Thursday August 19, 2010 - 23:59 ET  RESPONSE RATE: 246 eligible people are in this ballot group. 172 affirmative votes    15 negative votes     25 abstention votes ===   212 votes received = 86.2% valid returns                          =  11.8% valid abstentions   APPROVAL RATE: 172  affirmative votes       =   % affirmative   15  total negative votes  =     % negative The 75% affirmation requirement has been met, Motion passes. There were 16 comments received. Bruce Kraemer (Marvell)


Download ppt "WG11 Snapshot September ‘10"

Similar presentations


Ads by Google