Download presentation
Presentation is loading. Please wait.
Published byJoseph Castor Modified over 10 years ago
1
V-CONS Building on the foundation of Trust Since 1995 tomaskvergis@yahoo.com Mobile : 9884411400 1
2
Contents of the Slides :- 1.Profile 2.Snapshot of few projects built by V-CONS 2 V-CONS Building on the foundation of Trust Since 1995
3
V-Cons, 13 years old Civil construction company is specialized in civil construction activities with a view to offer Industrial / Commercial / Residential buildings/ Purchase of Properties and related civil works in a cost effective and efficient manner. To complement the design and development of office / residential complexes and interior work V-CONS also has a full fledged department which caters to interior designing and the transformation of those designs into reality through in-house Interior department. This department is manned by people whose minds are trained to look into the customers requirements and other parameters thoroughly and evolve the designs. To give our customers full-fledged services in all aspects of Civil/Interior Work V-CONS also offers services in identifying properties for purchase or lease. 3
4
Our construction capabilities are as follows : Identification and purchase of properties. Preparation of architectural designs and seeking approval from various departments. Construction of infrastructure including water supply, sewage recycling and coordination with electricity and telecom utilities. Construction for sale and lease of space which range from row houses to condominium towers, office blocks, shopping malls, schools, hotels and Church. We specialise in development of complete townships on large tracts of land which we develop from scratch. Our construction capabilities include earthworks, making of concrete, procurement of shuttering (form work and false work), electrical, plumbing, glazing, water proofing, flooring, tiling, painting etc. - all done in-house. V-CONS Building on the foundation of Trust Since 1995 4
5
GOAL :- The goal of the company is to promote all civil related activities as follows: Building/ Machinery foundation work All superstructures including buildings Interiors for all buildings including special applications Residential buildings including guest houses Development of industrial complexes including roads/ boundaries Construction of specialty buildings including all amenities 5 V-CONS Building on the foundation of Trust Since 1995
6
RESOURCES:- V-CONS is equipped with all necessary infrastructure such as Qualified technical personnel Required machinery including cranes Back-up office supporting infrastructure Required financial back-up by way of support from banks/institutions 6 V-CONS Building on the foundation of Trust Since 1995
7
Few Projects executed by V-CONS S.NProject NameLocationBuilt-up AreaUnitsYear of Comp 1Balaji HospitalMadipakkam14,00021996 2St. Thomas Orthodox ChurchMadipakkam 8,00011997 3Peers BuidlingT Nagar3,500121997 4Baptist ProjectChoolaimedu8,000 71998 5Vaidhyanathan BungalowRamapuram5,65061998 6Natarajan ProjectMugalivakkam700021998 7Dakshin Holiday ResortKodaikanal12000161999 8Murugan Pawn Brokers ProjectPorur4,500 12000 9NRE ProjectManappakam7,00042003 10Jacob JohnPorur4,500 12004 11 Dr. TamaraiPorur2,500 12005 12Ms.Meenakshi SundaramAlwar Tirunagar3,55012008 13Panel Advocate Mr.GopalakrishanUrapakkam2,22012008 14Mr.BalasubramanianPorur151722009 7
8
Abstract Estimate Including Additional Items For The Construction Of Residential Ground Floor dwelling for 1000sqft and 1350sqft slDescriptionUnitRate/unitAmount(Rs) 1Construction of the main building as per the given specification at ground floor without portico. 1000 sqft 2Construction of portico as per given specification 75% of building cost 3Increasing the depth of foundation beyond 5 ft. Rate is given only for 1 foot deep. Lump sum 4Increasing the height of foundation above 3 ft up to 4.5 ft from the existing ground level. 1.5 ft 5Cost incurred for watchman shed and material godown Lump sump 6Cost of bore well including all accessories ie., suction pipe upto water tank, 5 PVC Pipe motor, motor room & electrification complete (without PVC tank) Direct billing 7Outside filling without interlocking stone pavement up to 2 ft ht from the existing ground level including 2 loads of red gravel for kitchen garden Lump sum 8 Blank items or items without amount OR Items that are not mentioned in this table are to be discussed and the cost of the same shall be quoted then V-CONS Building on the foundation of Trust Since 1995
9
slDescriptionUnitRate/unitAmount(Rs) 8 a)Cost for construction boundary wall on the western side of height 7 ft from the existing ground level b) cost of main gate (120kgs), its pillars,ramps, name tablets, post box. (pn:cost for the portion other than the main gate is not included.we may have to discuss further whether to raise the present front boundary wall or to provide grills after breaking the present boundary wall.) 9Cost of construction of sump of capacity of 6000 litres at portico in red bricks with r.c.c bed concrete and r.c.c top slab to bear the live load. (including motor, motor room,, suction pipe and delivery pipe) 11Cost of construction of septic tank in concrete rings with r.c.c bed concrete including manholes 9000 liters 12Cost of full putty and emulsion painting in all room of area not exceeding 3000 sqft including labour complete 13Cost for extending kitchen counter including granite laying (beyond 12 rft ) and labour complete Lump sum 14 Cost of providing and fixing modular kitchen ( made at site by us) including accessories and malemine finish complete Blank items or items without amount OR Items that are not mentioned in this table are to be discussed and the cost of the same shall be quoted then 9 Abstract Estimate Including Additional Items For The Construction Of Residential Ground Floor dwelling for 1000sqft and 1350sqft V-CONS Building on the foundation of Trust Since 1995
10
slDescriptionUnitRate/unitAmount(Rs) 15Cost for providing and fixing Ward robes in ost or mdf with padak frames in all rooms at mentioned places including malemine finish and accessories of approximate area not exceeding 350 sq ft 16Cost of providing and fixing granite top for wash basins in specified rooms including labour complete 17Supplying and fixing additional PVC tanks 18Cost of external painting with APEX ULTIMA on the front side of the building including putty work at appropriate places of approximate area not exceeding 1000 sq ft 19EB and PANCHAYATH charges ( deposits, fees, main cable and other incidental charges) Lump sumpActual + service charge (10,000/=) 20Cost for providing temporary electrical connectionLump sumpActual + service charge (10,000/=) 21Cost of supplying and fixing Grill gate for all exits except at verandah including painting complete Blank items or items without amount OR Items that are not mentioned in this table are to be discussed and the cost of the same shall be quoted then 10 Abstract Estimate Including Additional Items For The Construction Of Residential Ground Floor dwelling for 1000sqft and 1350sqft V-CONS Building on the foundation of Trust Since 1995
11
slDescriptionUnitRate/unitAmount(Rs) 22 Additional cost that may be incurred to provide and fix thicker handrail for the stairs by using teak wood section of size 5 by 4 including varnish and labour complete 23Cost of elevation work on the front side including masonry work, its labour, facia material and its labour complete including APEX ULTIMA. Lump sum 24Additional cost for providing and fixing premium tiles and closets in all toilets of lump sum 25Cost for providing and fixing modular switches instead of normal switches 26 Cost of providing marble in all rooms of area not exceeding 875 sqft including supplying laying and polishing 875 sqft 27Cost for providing external stairs with plastered steps including project slabs (i.e., balconies for first floor) for access to first floor dwellings. Lumpsum Blank items or items without amount OR Items that are not mentioned in this table are to be discussed and the cost of the same shall be quoted then 11 Abstract Estimate Including Additional Items For The Construction Of Residential Ground Floor dwelling for 1000sqft and 1350sqft V-CONS Building on the foundation of Trust Since 1995
12
My project pictures 12 V-CONS Building on the foundation of Trust Since 1995
13
JJs project 13 V-CONS Building on the foundation of Trust Since 1995
14
Dr.Tamarais Project 14 V-CONS Building on the foundation of Trust Since 1995
15
15 V-CONS Building on the foundation of Trust Since 1995
16
16 V-CONS Building on the foundation of Trust Since 1995
17
17 V-CONS Building on the foundation of Trust Since 1995
18
18 V-CONS Building on the foundation of Trust Since 1995
19
19 V-CONS Building on the foundation of Trust Since 1995
20
20 V-CONS Building on the foundation of Trust Since 1995
21
21 V-CONS Building on the foundation of Trust Since 1995
22
22 V-CONS Building on the foundation of Trust Since 1995
23
23 V-CONS Building on the foundation of Trust Since 1995
24
24 V-CONS Building on the foundation of Trust Since 1995
25
25 V-CONS Building on the foundation of Trust Since 1995
26
26 V-CONS Building on the foundation of Trust Since 1995
27
27 V-CONS Building on the foundation of Trust Since 1995
28
28 V-CONS Building on the foundation of Trust Since 1995
29
29 V-CONS Building on the foundation of Trust Since 1995 Colonel V.T. Jacob Project Defence Colony
30
30 V-CONS Building on the foundation of Trust Since 1995
31
31 V-CONS Building on the foundation of Trust Since 1995
32
32 V-CONS Building on the foundation of Trust Since 1995
33
33 V-CONS Building on the foundation of Trust Since 1995
34
34
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.