Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGs London Closing Report

Similar presentations


Presentation on theme: "TGs London Closing Report"— Presentation transcript:

1 TGs London Closing Report
January 2007 doc.: IEEE /192r1 January 2007 TGs London Closing Report Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

2 January 2007 doc.: IEEE /192r1 January 2007 Abstract Report of TGs, ESS Mesh Networking Task Group, to the Janury, 2007 (London, England) closing Plenary. TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

3 TGs Closing Plenary Report
January 2007 doc.: IEEE /192r1 January 2007 TGs Closing Plenary Report An annotated agenda is available in 11-06/1892r7. The draft minutes will be posted shortly. TGs received 5,703 comments from LB #93 of which about 192 appear to have been from non-voters. TGs voted to go forward using its Draft D1.0 as a baseline and considering all received comments for resolution. During the meeting, 10 comments appearing in a submission were added. Thus the current comment spreadsheet (11-07/23r10) has 5,713 comments. Overall Summary Total Open Closed % Closed Total Comments: 5713 2712 3001 52.53% Editorial Comments: 2841 646 2195 77.26% Technical Comments: 2872 2066 806 28.06% Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

4 January 2007 PAR Amendment Motion The following motion was passed in the Task Group: Moved, to direct the TGs Chair to bring the following motion before the Working Group and adopt this action as the resolution of CIDs 500 and 1192: Moved, to approve the amendment in 11-07/149r5 to the P802.11s PAR and forward this PAR amendment to the 802 Executive Committee for their approval and further transmission. Moved: Suman Sharma Seconded: Jan Kruys Yes: No: 0 Abstain: 2 Donald Eastlake 3rd, Motorola

5 TGs Closing Plenary Report
January 2007 doc.: IEEE /192r1 January 2007 TGs Closing Plenary Report TGs teleconferences have been scheduled weekly from 31 January 2007 through 21 March 2007 (except 7 February and 14 March) at 5pm Wednesdays Eastern US time for comment resolution and meeting agenda discussions. TGs has an approved ad hoc in Hillsboro, Oregon, February 6-8, 2007, to resolve Letter Ballot comments. TGs will be moving the approval of an ad hoc in Eindhoven, Netherland, April 11-13, 2007, to resolve Letter Ballot comments. Goal for the March meeting in Orlando, Florida: Resolve Letter Ballot comments. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola


Download ppt "TGs London Closing Report"

Similar presentations


Ads by Google