MAINE MILITARY AUTHORITY. History and Mission Established in 1997 in Limestone, Maine with an executive office in Augusta, Maine MMAs mission is to produce.

Similar presentations


Presentation on theme: "MAINE MILITARY AUTHORITY. History and Mission Established in 1997 in Limestone, Maine with an executive office in Augusta, Maine MMAs mission is to produce."— Presentation transcript:

1 MAINE MILITARY AUTHORITY

2 History and Mission Established in 1997 in Limestone, Maine with an executive office in Augusta, Maine MMAs mission is to produce high Quality equipment through innovative processes that are cost effective and achieve total customer satisfaction MMA has refurbished more than 15,000 vehicles ranging from HMMWVs to howitzers to all types of engineer equipment School Bus Service Life Extension Program (SLEP)

3 Facilities School Bus Service Life Extension ProgramSchool Bus Service Life Extension Program (SLEP) Facilities - Limestone

4 PROBLEM: Long term federal, state and local budget constraints will result in fewer dollars for procurement of new school buses at historical replacement rates. SOLUTION: MMA developed a comprehensive program to cost-effectively extend the service life of school buses. GOAL: Off-set budget cuts by offering School Superintendents viable, economical solutions to impending school bus shortages. School Bus Service Life Extension Program (SLEP)

5 RSU 18 Traditional 1999 Bluebird RSU 18 Pusher 2005 Bluebird

6 New Bus Costs Traditional Style (Type C): $84,000+/- Transit Style (Type D): $91,000+/- Expected Body Life 10-12 Years Expected Mechanical Life 17-20 Years School Bus Service Life Extension Program (SLEP)

7 Fundamental Disconnect: Body lasts half the life of the mechanical components Fundamental Correction: MMAs SLEP designed to extend body life to match mechanical life MMA SLEP Cost $30,000 School Bus Service Life Extension Program (SLEP)

8 Statement of Work (SOW) Overview: Complete separation of the body from the frame (Conventional style only) Pressure wash thoroughly and perform further vehicle inspections, document accordingly Repair corrosion deficiencies (steps, cross ribs, wheel wells, etc) Blast, prime & paint frame Prep, prime and paint body. SLEP services will restore the body and frame of the bus to like new condition. Apply anti-corrosion undercoating to the frame and undercarriage

9 School Bus Service Life Extension Program (SLEP) Pre-Production

10 School Bus Service Life Extension Program (SLEP) Pre-Production

11 School Bus Service Life Extension Program (SLEP) Pre-Production

12 School Bus Service Life Extension Program (SLEP) Work in process

13 School Bus Service Life Extension Program (SLEP) Fuel tank – before Fuel tank - after

14 School Bus Service Life Extension Program (SLEP)

15

16

17

18 Process Scope of Work Agreement: Appendix A – Field Joint Visual Inspection (FJVI) Appendix B – Available Options Appendix C – Receiving Joint Visual Inspection (RJVI) School Bus Service Life Extension Program (SLEP)

19 Engine Transmission/Transfer Case Axels/Differentials/Drive Line Cab/Controls/Gauges Cooling System Exhaust Service Brake and Parking Brake Lights Signals and Strobes Batteries and Charging System Wheels and Tires A/C Operation if Equipped Storage Compartments Exterior Body Frame/Undercarriage Appendix A – Joint Visual Inspection School Bus Service Life Extension Program (SLEP)

20 Appendix B – Options Stainless steel entrance steps Up-grade lighting to LED Repair seat backs and bottoms Seal along floor mat and side wall, replace seat anchor hardware Video system installations School Bus Service Life Extension Program (SLEP)

21 Appendix C – Discrepancies Discovered During Teardown Mechanical defects will be documented for customer review Additional mechanical refurbishment upon request Subject to Pricing and Customer Approval

22 Summary SOW restores body & frame to like new condition Base line cost $30,000.00 1 year full warranty on all MMA workmanship and coatings 2 year reapplication of corrosion inhibitor after MMA SLEP services Turn around time – 3 - 4 weeks or Customer requirements School Bus Service Life Extension Program (SLEP)

23 Repairs Federal Motor Vehicle Safety Standards for School Buses (FMVSS) MMA has an internal inspection division and quality control department (ISO 9001:2008) that monitors all bus repairs MMA will establish data tracking for the purpose of Life Cycle Analysis for Program MMA will enter Vehicle Identification data into Transfinder software along with applicable documentation after completion of refurbishment School Bus Service Life Extension Program (SLEP)

24 Questions? www.mainemilitaryauthority.com Timothy P. McCabe Office: 207-430-5693 Cell: 207-441-5194 E-mail: timothy.p.mccabe.nfg@mail.mil School Bus Service Life Extension Program (SLEP)