Presentation is loading. Please wait.

Presentation is loading. Please wait.

March 11 M9.0 Tohoku Earthquake +60s: Mw 8.47 GPS can rapidly constrain momentGPS can rapidly constrain moment +90s: Mw 8.80 +120s: Mw 9.04.

Similar presentations


Presentation on theme: "March 11 M9.0 Tohoku Earthquake +60s: Mw 8.47 GPS can rapidly constrain momentGPS can rapidly constrain moment +90s: Mw 8.80 +120s: Mw 9.04."— Presentation transcript:

1

2 March 11 M9.0 Tohoku Earthquake

3

4 +60s: Mw 8.47 GPS can rapidly constrain momentGPS can rapidly constrain moment +90s: Mw s: Mw 9.04

5 No stable reference station in a 2-state radius!

6 READI Data ProductsREADI Data Products Level-0: Phase and range data delivered in real-time Level-1: Point-position + cov time series delivered in real- time (also tropospheric PWV and ionospheric TEC) Level-2: Seismic source estimates delivered in real-time Level-3: rtGPS-derived products and positions integrated into seismic and other monitoring systems

7 CWUs READI SystemCWUs READI System Telemetry hub + archive for all 470 PANGA + PBO sites (Level-0 data product) Real-time PPP system (Level-1) Seismic + tsunami analysis code (Level-2) Database to receive and distribute position time series and derived Level 2 data products GUI to interface with the Level 1 & 2 data (GPS Cockpit)

8 PPP with RTSE & GIPSY 6.2PPP with RTSE & GIPSY 6.2 Real-time Stream Editor precleans phase & range data Uses geometry-free linear combination to flag and fix slips & biases Takes into account different weighting for different observations Stable, lightweight 5-state Kalman filter processing per satellite Facilitates parallel processing Fast convergence and re-convergences < 1 min at 1 Hz Provides ionospheric delay as a byproduct Physical models (tides, ocean loading, phase windup, relativistic effects ) are predicted and applied as corrections to Level-0 data to improve accuracy and help to reduce convergence time. Concurrent GIPSY runs on 20-epoch arcs, last five epochs shunted into rt streams Run-time is under 0.5 second (w/ smapper.small.e) GIPSYs models are excellent (truth)

9 RTSE post-processing results using GOA 6.1.2RTSE post-processing results using GOA P494 Sierra El Mayor Earthquake 7.1 Mw 04/04/2010

10 CWUs READI SystemCWUs READI System Telemetry hub + archive for all 470 PANGA + PBO sites (Level-0 data product) Real-time PPP system (Level-1) Database to receive and distribute position time series and derived Level 2 data products Seismic + tsunami analysis code (Level-2) NIF run on positions + covs (McGuire & Segall, 2003) ComCot used to compute tsunami hydrodynamic GFs GUI to interface with the Level 1 & 2 data (GPS Cockpit)

11 Level-1 & Level-2 database & client request systemLevel-1 & Level-2 database & client request system Accept rtGPS solutions from various sources, in various formats SQL-Server based Up to 24 hrs of data held in multiple buffers & sample rates Level-1 & 2 products streamed on a client request basis Uses HTTP, JSON and BSON formats to serve data to clients Well-documented API

12 CWUs READI SystemCWUs READI System Telemetry hub + archive for all 470 PANGA + PBO sites (Level-0 data product) Real-time PPP system (Level-1) Database to receive and distribute position time series and derived Level 2 data products Seismic + tsunami analysis code (Level-2) NIF run on positions + covs (McGuire & Segall, 2003) ComCot used to compute tsunami hydrodynamic GFs GUI to interface with the Level 1 & 2 data (GPS Cockpit)

13 CWUs READI SystemCWUs READI System Telemetry hub + archive for all 470 PANGA + PBO sites (Level-0 data product) Real-time PPP system (Level-1) Database to receive and distribute position time series and derived Level 2 data products Seismic + tsunami analysis code (Level-2) NIF run on positions + covs (McGuire & Segall, 2003) ComCot used to compute tsunami hydrodynamic GFs GUI to interface with Level 1 & 2 data (GPS Cockpit)

14 GPS Cockpit: Time for a demoGPS Cockpit: Time for a demo

15 Time seriesTime series

16 Instantaneous PositionsInstantaneous Positions

17 Peak Ground DisplacementPeak Ground Displacement

18 Megathrust Finite FaultingMegathrust Finite Faulting

19 Tsunami 50mTsunami 50m

20


Download ppt "March 11 M9.0 Tohoku Earthquake +60s: Mw 8.47 GPS can rapidly constrain momentGPS can rapidly constrain moment +90s: Mw 8.80 +120s: Mw 9.04."

Similar presentations


Ads by Google