1 平成30年12月 doc.: IEEE /424r1 November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing Report November 2007 Atlanta] Date Submitted: [15 November 2007] Source: [Reed Fisher] Company [Oki Electric Industry Co., Ltd.] Address [2514 E. Maddox Rd., Buford, GA USA.] Voice:[ ] Re : [] Abstract:[Description of TG3c November 2007 meeting reports ] Purpose:[Report to Closing Interim Meeting, 20 September 2007] Notice :This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P R. Fisher, Oki Electric Industry co. Ltd Stuart J. Kerry - Philips Semiconductors, Inc.

2 TG3c 16th Meeting, Atlanta GA Closing Report 15 November, 2007

3 16:00 Monday, November 12. Call to order.
TG3c Leadership: Chair: R. Fisher vice Chair: A Mathew, S. Kato Secretary : H. Ikeda , T. Baykas, C.S. Sum Technical Editor: J. Gilb Sub Editors: A. Astrin, S. Skafidas, I. Lakkis, C. Ngo, T. Baykas, C.S. Sum, A. Kasher, B. Gaffney 3. Attendance Approx. 100 attendees in each slot. 4. Twelve 2-hour time slots are allocated、and eleven slots were used. :15 November 15 Meeting adjourned Nov. 12 (Mon) Nov. 13 (Tue) Nov. 14 (Wed) Nov. 15 (Thu) AM1 X AM2 PM1 PM2 Cancelled

4 Meeting Accomplishments
November 2007 Meeting Accomplishments 2 proposals from Hawaii were merged to one proposal, and the final proposal was presented. The confirmation roll call vote was carried and the Proposal was successfully confirmed. Presented 4 technical contributions. TG3c project timeline updated, 05/311r17. R. Fisher, Oki Electric Industry co. Ltd

5 Report of TG3c Proposal Confirmation Vote
November 2007 Report of TG3c Proposal Confirmation Vote November 15th, TG-3c AM1 TG3c Proposal Roll Call Confirmation Vote managed by R. Alfvin For Joint Proposal of 07/934r1 + 07/942r2 Voting Results Yes: (87%) > 75% Threshold No: (13%) Abstain: 10 Total vote: 110 Proposal was confirmed R. Fisher, Oki Electric Industry co. Ltd

6 List of Contributions and Proposals
November 2007 List of Contributions and Proposals R. Fisher, Oki Electric Industry co. Ltd

7 Plan to Get to Baseline Document
平成30年12月 doc.: IEEE /424r1 <month year> 05/311r17 Plan to Get to Baseline Document November 2007: Two remaining Proposals in Hawaii were merged to one. Confirmation Roll Call vote was carried and confirmed. Future plan: January 2008: Draft baseline text completed <author>, <company> Stuart J. Kerry - Philips Semiconductors, Inc.

8 平成30年12月 doc.: IEEE /424r1 <month year> 05/311r17 Ballot plan March 2008 – First letter ballot completed, start comment resolution July 2008 – Resolution of comments completed, begin re-circulation ballot September 2008 – re-circulation ballot completed, comment resolution, and Start Sponsor ballot November 2008 – 802 Sponsor Ballot completed, comment resolution, start recirculation ballot January – 802 Sponsor Ballot re-circulation completed and, submit to RevCom for final approval May 2009 – Approval by RevCom <author>, <company> Stuart J. Kerry - Philips Semiconductors, Inc.

9 Project timeline November 2007 05/311r17
R. Fisher, Oki Electric Industry co. Ltd