Presentation is loading. Please wait.

Presentation is loading. Please wait.

RR-TAG Liaison Report January 2009 IEEE

Similar presentations


Presentation on theme: "RR-TAG Liaison Report January 2009 IEEE"— Presentation transcript:

1 RR-TAG Liaison Report January 2009 IEEE 802.18-802.11
Month Year doc.: IEEE yy/xxxxr0 January 2009 RR-TAG Liaison Report January 2009 IEEE Date: Authors: Rich Kennedy, OakTree Wireless John Doe, Some Company

2 IEEE Work Plan Generated a response to ECC WG SE24 on use of 5 GHz onboard aircraft Heard an update on EN changes for v1.8.1 Final review of inputs to IMT-Advanced (editorial changes only) Re-edited the input to M.1450; updates for new amendments caused document formatting errors Reviewed “ITU Mark” proposal Start looking at a response to the TVWS R&O

3 Weather Radars and 5 GHz RLANs
EUMETNET is claiming (erroneously) that DFS does not work, and that 5 GHz RLANs must be banned from aircraft (and possibly all mobile platforms) Claim that mobile platforms cannot meet new CAC requirements Mobile radars are protected by In Service Monitoring; CAC not relevant Want to block 5600 – 5650 MHz band; could be extended to full 5250 – 5350 and 5470 – 5725 MHz bands Issues seen appear to have been with non-compliant, high-power APs Boeing has performed field test; data show no impact on weather radar operation Letter asks SE24 to consider test data, and that RLAN community be involved in any future decisions on this matter

4 References ecc-draft-report-on-airborne-5ghz-rlans-and-radar letter-to-se24-concerning-airborne-rlans ghz-rlans-and-radars-in-eu en300_328_update itu-mark


Download ppt "RR-TAG Liaison Report January 2009 IEEE"

Similar presentations


Ads by Google