Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project Development Railway & Subway Substation & Transmission

Similar presentations


Presentation on theme: "Project Development Railway & Subway Substation & Transmission"— Presentation transcript:

1 Project Development Railway & Subway Substation & Transmission Oil & Gas & Petrochemical Water & Waste Water Industrial Projects

2 About Barsan BARSAN, is the single-source solution for concept-to-completion, Seamless project execution. Every aspect of Planning, Design, Procurement, Construction, Start-up, Commissioning and Financing is supported to produce the most reliable processing facilities. Clients can count on experienced, professional staff for open and honest communication. The BARSAN’s fine tuned project management team, will safely and efficiently guide each project to peak performance and profitability based on the most advanced management techniques (PMBOK). Our Company's activities encompass the Power Transmission networks and Substations, Power plants, Oil, Gas & Petrochemical, Railway &Subway, mine and Mining industries.

3 Instrumentation Installation
Services 1- PROJECT MANAGEMENT SERVICES: Project Management Construction Management Quality ‍Management Time, Cost & Risk Management 2- ENGINEERING SERVICES: Feasibility Studies Front-End Engineering & Design Detail Engineering Site Technical Services HSE & Risk Analysis Technical Consulting 3- PROCUREMENT SERVICES: Market Survey, and Supplier Selection Price Inquiry and Negotiation Purchasing, Inspection and Shipment 4- CONSTRUCTION WORKS: ‍ Civil Construction Mechanical Installation Electrical Installation Instrumentation Installation 5- COMMISSIONING ACTIVITIES: Pre-commissioning Commissioning Start up 6-FINANCIAL SERVICES: Financial Analysis Project Financing Financial Risk Management

4 Barsan’s Organization Chart

5 Barsan Human Resource Comparison Charts

6 Railway & Subway Projects
Major Projects Railway & Subway Projects

7 9 units Traction Substations & 3 Medium Voltage Dispatching Substations
Client: SHIRAZ URBAN RAILWAY ORG Project type: EP Partner Company: Siemens (Germany) Transfo (Switzerland) Scope of Work:  Project Management  Performing further engineering services  Simulation  Procurement  Supervision on Installation  Training  QA/QC Management Brief Description: Supplying Equipment, supervision on installation and commissioning of 9 units of traction substations and 3 units of medium voltage distribution substations. Supplying DC and medium voltage switching equipment. Supervision of SCADA system of traction substations and MV dispatching substations All related works e.g. training, maintenance material etc. Location: Shiraz Project Period: 18 Months

8 26 Km Overhead Catenary System (O.C.S)
Client: SHIRAZ URBAN RAILWAY ORG Project type: EPC Partner Company: PKAG Company (Switzerland) Siemens (Germany) K & M (Switzerland) Scope of Work:  Project Management  Reverse Engineering  Formal Designing and Simulation of Mechanical and Electrical System of the Overhead Network Procurement  Cables  Installation QA/QC Management Brief Description: Designing, Supplying Equipments and Implementation of OCS (Overhead Catenary System) for line 1 of Shiraz Urban Railway. Location: Shiraz – Line 1 Project Period: 30 Months

9 8 units Traction Substations
Client: Tabriz Urban Railway Project type: EP Partner Company: SECHERON (Switzerland) Schneider (Italy) Scope of Work:  Project Management  Basic Design  Detail Design  Procurement  Super vision on Installation  Commissioning  QA/QC management Brief Description: Carry out Reverse Engineering Services Simulation Supplying DC Equipments Supplying Medium Voltage Switching Equipment Supervisory on the Installation and Commissioning of Traction Substation and related services e.g. Training of employer's personnel Location: Tabriz – Line 1 Project Period: 14 Months

10 Electrification of Existing Tehran-Mashhad Railway ( 2350 Km )
Client: Islamic Republic of Iran Railways ( RAI) Project type: EPCF Partners company: Tam- Wagonpars- Hirbodan Foreign Partner: Siemens- Alstom Scope of Work:  Project Management  Performing further Engineering Services  Simulation  S.S extension equipments, Transmission line  Procurement Traction S.S of OCS system  SCADA System  Supplying of Locomotives  Installation  Maintenance and Training  5years operation  Related civil works  Financing Management  QA/QC Management

11 Electrification of Existing Tehran-Mashhad Railway ( 2350 Km )
Brief Description: Performing the Engineering, Supplying the goods, Equipment, Construction works, Installing, Testing and Commissioning services, 6-month supervision, Guarantee period services, after – sale and Maintenance services simultaneously (EPC) including: 1 Construction of Overhead Centenary System (OCS) for Tehran Mashad double track existing Railway Route 2 Constructions of Traction Power Substations, Paralleling and Sectioning Substations (AT, SP, and SSP). 3 Constructions of SCADA and Dispatching Centers. 4 Supplying 70 units required electrical locomotives (including : 50 units passenger locomotives Bo-Bo and 20 units freight locomotive Co-Co) with 2 years guarantee and spare parts. 5 offering full maintenance services for the whole project such as substations, overhead network, and centralized control BoBo and CoCo locomotives for a period of five years along with supplying the spare parts, consumable materials and manpower. Location: Tehran-Mashhad existing railway Project Period: Months

12 Reconstruction and Renewal Of 200 KM Khorasan Railway
Client: Railway of Islamic Republic of Iran Project type: EPC Scope of Work:  Project Management  Disassembling the old rail road track Ballast replacement Transporting of the Rail and Sleeper assembled blocks  Welding Rails  Fixed points procurement and Installation  Final track make up  Local and foreign material Procurement  Track maintenance QA/QC management Brief Description: Reconstruction and Renewal of 200 Km Khorasan line together with supplying construction material from foreign and local resources as well as 2 years Track Maintenance Location: Khorasan Province Project Period: 48 months ( including 2 years maintenance)

13 Reconstruction and Renewal Of 200 KM Khorasan Railway

14 Power Transmission Line Projects
Major Projects Power Transmission Line Projects

15 400 kV Transmission line Single circuit Twin Bundle
Client: Khorasan Regional Electric Company (K.R.E.C) Project type: EPC and Finance Scope of Work:  Project Management Services  Project Controls  Engineering Management  Procurement Management  Construction Management  QA / QC Management Brief Description: Installing Suspension And Tension Insulator String , And Jumper Assembly With All Respective Hardware And Accessories , Wiring And Adjusting Tension And Sag Of Wire According To Wiring Schedules And Executive Drawings And All Services For Wiring 3 Conductor Curlew Wire400 KV Transmission Line Of Toos- Shirvan Esfarayen Single Circuit Twin Bundled. Location: Khorasan, North east of IRAN Project Period: 42 Months

16 63 kV Transmission OHL Naeen Cement Plant
Client: Naeen Cement Plant Project type: EPC Partner Company: Cemag, Simansazan, Industrial Consulting Engineers Scope of Work:  Project Management  Basic Design  Detail Design  Civil works  Procurement  Lattice Type Tower Erection  Wiring and adjusting tension of 63kV  Transmission line  QA/QC management Brief Description: Installing Suspension and Tension Insulator String and Jumper Assembly With All Respective Hardware and Accessories , Wiring, Adjusting Tension and Sag of Wire According to Wiring Schedules of 14 km 63 KV Transmission Line. Location: Naeen (Isfahan) Project Period: 7 Months (Finished)

17 63 kV Transmission OHL Naeen Cement Plant

18 63 kV Transmission OHL Nahavand Cement Plant
Client: Nahavand Cement Plant Project type: EPC Scope of Work:  Project Management  Basic Design  Detail Design  Civil works  Procurement  Lattice Type Tower Erection  Wiring and adjusting tension of 63kV Transmission line QA/QC management Brief Description: Installing Suspension And Tension Insulator String And Jumper Assembly With All Respective Hardware And Accessories , Wiring And Adjusting Tension And Sag of Wire According To Wiring Schedules of 14/6 Km 63 kV Transmission Line Location: Nahavand near to Hamedan Project Period: 12 Months

19 Power Substation Projects
Major Projects Power Substation Projects

20 Optimization of Power Distribution of Ahwaz Production units
Client: National Iranian South Oil (N.I.S.O.C) Project type: EPC Partner Company: Trans Post Pars Scope of Work:  Project Management  Basic Engineering  Detail Engineering  Procurement  Civil works  Installation  Commissioning & Start Up  QA/QC management  HSE Management Brief Description: Optimization of Power Distribution of Ahwaz Production Units, Expansion of 33/11kV Electrical Substations Transformer and Switchgears Sections. Location: Ahwaz ,South of Iran Project Period: 24 Months (Finished)

21 High Voltage Substations 230/63 kV
Client: Isfahan Regional Electric Company Project type: EPC Scope of Work:  Project Management  Basic Engineering  Detail Engineering  Procurement  Civil Works  Installation  Commissioning & Start Up  QA/QC Management Brief Description: Extension of 3 Substation in 230 & 63 kV Sections Replacing of Three 230/63/20kV Power Transformer, Replacing of Equipment in 63kV Section, Add 6 Feeders in 230kV Section with 1 ½ CB Arrangement Location: Abshar , Islam Abad & Ardestan Project Period: 24 Months

22 Extension of Abadeh 66kV Substation
Client: Abadeh Cement Factory Project type: EPC Partner Company: Sanayeh Asia Engineering Co Scope of Work:  Basic Design  Detail design  Procurement Management  Installation Civil Works  Commissioning and Start Up  QA/QC Management. Brief Description: Detail Design, Supplying, Civil Works, Mapping, Installation, Test & Commissioning of 66/6.3 kV Substation Location: Abadeh Near to Shiraz Project Period: 12 Months

23 High Voltage Bonyan Sanat Khodro Substation 63/20kV
Client: Bonyan Sanat Khodro Project type: EPC Scope of Work:  Project Management  Detail Engineering  Procurement  Installation  Commissioning & Start Up  QA/QC Management  HSE Management Brief Description: Engineering, Supply, Installation and Commissioning of complete HV Substation 63/20kV, Including H model Substation, 2 Bay Input and11 Output Feeder Location: Saveh Project Period: 24 Months (Finished)

24 High Voltage Naeen Cement Factory Substation 63/6.3 kV
Client: Naeen Cement Factory Project type: EPC Scope of Work: Project Management  Basic Engineering Detail Engineering Procurement Civil Works Installation QA/QC Management Brief Description: Basic & Detail Design of 63/6.3kV Substation Which Feed From Two 63kV Bay & Two Transformer 2 Input Feeder 2 Transformer Feeder 10 Out put & Coupling Feeder Location: Naeen (Isfahan) Project Period: 12 Months

25 NIOTC 11 kV /400 V Substation Client: National Iranian Oil Terminal Co. (NIOTC) Project type: PC Scope of Work:  Project Management  Design Review  Project Control  Procurement Management  Civil Works  Construction Management  QA/QC Management  HSE Management Brief Description: kV/400V Substations, Replacement of Transformer ,Settlement of Mechanical Equipment & Fire Alarm System Location: Kharg Island Project Period: 12 Months

26 Mahshar – Besat Town 132kV Transmission Line / Substation
Client: Mahshahr Special Economic Zone Project type: EPC Scope of Work:  Project Management  Basic Engineering  Detail Engineering  Procurement  Civil Works  Installation  Commissioning & Start Up  QA/QC Management Brief Description: Engineering services, Procurement, Construction and Commissioning of Mahshahr to Besat Town 132kV Electric Power Transmission Line (12km) Location: Mahshahr (Iran) Project Period: 12 Months

27 63kV Power Transmission Line & GIS 63/6.6kV Substation in Qeshm Island
Client: Qeshm Oil Investment Co Project type: EPC Scope of Work:  Basic Design  Detail design  Procurement  Installation  Civil Works  Commissioning and Start Up  QA/QC Management. Brief Description: Detail Design, Supplying, Civil Works, Mapping, Installation, Test & Commissioning of GIS 66/6.3kV Substation as well as 25km twin bundle / twin circuit 63kV transmission line. Location: Qeshm Island Project Period: 12 Months

28 OIL, GAS & PETROCHEMICAL PROJECTS
Major Projects OIL, GAS & PETROCHEMICAL PROJECTS

29 Olefin Unit Construction
Client: Bandar Imam Petrochemical Co. Project type: Construction Partner Company: Niksan Sanaat (Iran) Scope of Work:  Project Management  Procurement of Bulk material  Project Construction  Civil  Mechanical / piping  Electrical / instrumentation  Commissioning Brief Description: Completion of Construction works at Olefin Unit for Bandar Imam Petrochemical co Location: Bandar Imam Khomeini Project Period: 7 months

30 Poly Propylene Production Line Revamp / Expansion
for Arak Petrochemical Company Client: Arak Petrochemical Company Project type: Construction & Commissioning Scope of Work:  Project Management  Civil Works  Structure  Mechanical  Electrical  Instrumentation  Procurement of Civil & Bulk Material  QA/QC Management  HSE Management Brief Description : Revamping and expansion of PP unit from 50’000 TpA to 75’000 TpA Location: Arak Project Period: 12 Months (Finished)

31 Polypropylene Production Line Expansion
for Arak Petrochemical Company

32 Expansion of Utility units at Arak Petrochemical company
Client: Arak Petrochemical Company Project type: Construction & Commissioning Scope of Work:  Project Management  Civil Work  Structure  Mechanical  Electrical  Instrumentation  Procurement of Civil & bulk Material  QA/QC Management  HSE Management Brief Description: Revamping and expansion works at cooling and DM unit, Central Utility Unit. Location: Arak Project Period: 5 Months (Finished)

33 Renovation & Control Systems Upgrading For Steam & Gas Compressor
Client: Tehran Oil Refinery Co Project type: EP Scope of Work:  Project Management  Basic Design  Detail Design  Procurement  Supervision on Installation  Commissioning & Start Up  QA/QC Management  HSE Management Brief Description: - 5 Control Panels Integrated by S7 Siemens PLC - Cabling Programming of PLC & Monitoring System Instrumentation FAT SAT Supervision On Installation Redundancy of System Location: Tehran Refinery Project Period: 12 Months

34 Renovation & Control Systems Upgrading For Steam
& Gas Compressor

35 Pre line check , Loop Check and Loop Test
Automation and Control Systems Client: PIDECO on behalf of Daelim Project type: Pre-commissioning Services Scope of Work:  Project Management  Finishing the Remaining Work left by First Contractor on Control Systems Brief Description: Pre line check loop cheek and loop test of Automation and control systems of some area of Gas Refinery “South Pars Phase 1” Location: Assaluyeh ,South of Iran Project Period: 6 Months (Finished)

36 Calibration and Relay Test of Control and Instrumentation Equipment
Client: PIDECO on Behalf of Daelim and IDRO Consortium Project type: Pre commissioning Services Scope of Work:  Project Management  Ending The Remaining Work from First Contractor in Control Systems Brief Description: Pre-line-check loop check and loop test of Automation and Control Systems in some area of Gas Refinery “South Pars Phase 1” Location: Assaluyeh ,South of Iran Project Period: 6 Months (Finished)

37 Industry & Mine Projects
Major Projects Industry & Mine Projects

38 Revamping & Renovation of Brick Factories
Client: Iranian fuel Conservation Organization (IFCO) Project type: Engineering, Procurement & Construction Partner Company: KELLER (GERMANY), IPA-ARPINA (ITALY) SWINDELL DRESSLER (USA) Scope of Work:  Feasibility Study  Project Management  Transfer of Technology  Procurement  Installation  QA/QC Management Brief Description: Optimizing of Fuel Consumption by Replacement of Traditional Kiln to Improved Tunnel Kiln for 20 factories Location: Khorasan - Kerman - Isfahan - Tabriz - Yazd Project Period: 25 Months

39 Aluminum Smelter Plant (Hormozal)
Client: FATA EPC (Main Contractor for Hormozal Project) Project type: Engineering (Partial), Procurement (Partial) & Construction Partner Company: Cemag, CimanSazan Scope of Work:  Project Management  Procurement  Civil works  Installation  Commissioning & Start Up  QA/QC management Brief Description: Site Mobilization Site Excavation Furnace Building Reinforced Concrete Pillars Furnace Casing and Foundation Steel Structure for Cladding and Roofing Cranes Railing Control and Electrical Building and Related Facilities Location: Bandar Abbas Project Period: 20 Months

40 Management Consulting
Major Projects Management Consulting

41 Kerman Province 500MW CCP Project Definition: Scope of services:
Offering All Expert Services In Performing Feasibility Study And Required Studies For Preparing Explanatory Design For The Construction Of Combined Cycle Electricity Power Plant, With The Capacity Of 500 MW In Kerman Province, And Doing Necessary Discussion With Organization And Expedient Governmental Sector For Getting Necessary Approval By Construction Of Above Mentioned Power Plant Scope of services: 1. Preliminary Consideration Of Feasibility Study And Performing Required Explanatory Reports And Conducting Certain Negotiations With The Electricity Development Organization Of Iran, With The Coordination Of The Company For Getting The Approval For Construction Of The Power Plant. 2. Researches For Selecting The Type, Quantity, Combination And Arrangement Of The Units And Related BOP In The Location, Which Is Appointed, With Regard Of Its Effect On Financial Model , Appointing Design Parameters. 3. Studying On The System, And Its Connection To The Country's Network, Short Cut Calculations And Stability Of The Network And Distribution Of The Load. 4. Studying On The Environmental Conditions For Getting The Relevant Approval. 5. Studying On The Weather Conditions Such As Humidity, Altitude And The Temperature Degree Of The Project In The Appointed Site. 6. Studying On The Access And Communication Routes And Transportation Of The Heavy Equipments. (Continued on next page)…

42 Project Definition: (Continued)
Kerman Province 500MW CCP Project Definition: (Continued) Offering All Expert Services In Performing Feasibility Study And Required Studies For Preparing Explanatory Design For The Construction Of Combined Cycle Electricity Power Plant, With The Capacity Of 500 MW In Kerman Province, And Doing Necessary Discussion With Organization And Expedient Governmental Sector For Getting Necessary Approval By Construction Of Above Mentioned Power Plant Scope of services: 7. Consideration And Studying On The Geology With Regard To Earthquake. 8. Studying On The Possibility Of Access And Supply Of Raw Water And Its Transfer. 9. Studying On The Circumstances Of Supplying Fuel And Fuelling For The Main Fuel (Gas) And The Fuel Supporter (Liquid) And Assigning The Required Quantity And The Technical Specification Of The Fuel And Cooperation With The Company For Getting Relevant License. 10. Preparation Of Financial Model With Regard To Circular (Letter) And Related Approvals And According To The Acceptable Formats Of Other National And International Economical Institutes. 11. Conducting Certain Negotiations And Preparation Of Contract For Selling Electricity Up To The Stage Of To Be Signed By The Company.

43 Bojnord Automatic brick factory
Project Definition: Bojnord Automatic Brick Factory Scope of services: Following The Step Of The Execution Of The Project, Such As Design Inspection And Estimating The Facilities For Arrangement Of The EPC Contract For Execution, Installation And Commissioning Of The Mentioned Furnace Tunnel And The Necessary Action For Introducing Project To The Organization Of Optimization Of Fuel Consumption For Using Non Refundable Facilities Of The Organization And Also Preferred Facilities From Other Financial Sources And Institutes With Credit Loan And Signing The Current Project Agreement In The Form Of EPC

44 Crude Oil Storage in Qeshm Island
Project Definition: Pre-feasibility study and finance services for construction of crude oil storages in Qeshm island free zone. Scope of services: 1) Pre-feasibility Studies 2) Locating The Most Proper Location To Install The Tanks With Reference To Environmental, Economical And Legal Parameters. 3) Determination Of Storage Capacity, Pumps Characteristics And Number And Pipe Specifications Vs. Technical And Economic Viewpoints 4) Extraction Of Basic Lay-out And Design Of Area, Release Of Preliminary & Schematic Drawings And Preparation Of Material / Equipment List 5) Structural Design Of Tank And Pump Area, Release Of Drawings For Earthwork And Concrete Works. 6) Determination Of Battery Limits For Local / Foreign Services In Whole Scope Of Engineering, Procurement, Transportation, Installation And Construction Works. 7) Evaluation And Review Of Economic Impacts On Project Feasibility During Project Key Periods Like Engineering, Procurement And Construction Works. 8) Evaluation And Review Of Interest Rate And Other Financial Parameters On Project Feasibility. (Continued On Next Page)…

45 Crude Oil Storage in Qeshm Island
Scope of services: 9) Preparation Of Human Resource List, Evaluation Of HR Costs On Project Costs, Including Training Courses For Maintenance And Operation Works. 10) Evaluation Of Safety System, Gas/Oil Leakage Alarm, Fire Alarm And Fire Fighting System. 11) Evaluation Of Annual O&m And Operation Costs. 12) Project Finance Services. 13) Evaluation Of Project Costs, Preparation Of Relevant Reports For Vendors. 14) Management And Leading Of All Communication To/From Banks/Credential Institutes To Receive Finance Agreement And Loan Acceptance According To Client’s Conditions And Abilities. 15) Discussion And Agreement On Investment Securities Required By Financers And Loan Payers. 16) Preparation And Supervision Of Finance Agreement With Financers. 17) Preparation Of Finance Resources (Finance Portfolio) And Determination Of Investment Costs. 18) Preparation Of Investment Guidelines To Project For Interested Investors 19) Preparation Of Required Agreement Packages To Be Signed Between QFZ, NIOC And investors.

46 Optimization of Regional Electric Companies
Project Definition: Optimization Of “Electrical Distribution Companies” Structure, In A Manner That Both Electric Companies And Clients Suffer Less Complexity In Their Procedures And Pay Less Costs For Services. Scope of services: Consulting Services To Prepare Optimum Activity Models For Power Distribution Companies Which Detail Activity And Analytical Probe Criteria Are As Following: 1 - Organizational Process Optimization Of Distribution Departments. 2 - Outsourcing Sequences For Operations Of Distribution Department. 3 - Providing An Optimization Model For Upgrading Distribution Management. 4 - Providing An Optimization Model For Development Of Advisory And Contractual Capabilities. 5 - Providing A Model For Upgrading The Evaluation Systems Of Distribution Department.

47 System Loss Reduction & System Efficiency
Barsan Is A Pioneer In Power Quality To Increase Overall System Efficiency In Power Generation, Transmission And Distribution Systems To Decrease General Power Transmission And Distribution Loss To Enhance System Design, Installation, Operation And Maintenance Standards And Procedures. Provides New Technologies And New Solutions For A Better Grid Efficiency: DAS (Distributed Automation Systems) AMR (Automatic Meter Reading) BPL (Broadband Over Power Line)

48 Major Projects Project Development

49 Project Development Highlights by BARSAN
Barsan has a great attitude and ability to introduce new solutions and conform new projects to give the best out of every problem. While Barsan is a pioneer in new concepts and new approaches on most of its projects, our engineering and economical team has completed several designs, technical and economical feasibility studies and project developments. Here is a short example of Barsan’s prosperous experiences: 1- Power Grid Loss Optimization and Power Quality 2- Optimization of Brick Kilns for Energy Saving 3- Environment Friendly Bricks (Un-Fired Bricks) 4- Concrete Sleepers (Feasibility Study and Investment) 5- Establishment of Several Power Plants as B.O.O. or B.O.T. Basis Contracts. 6- Wind Power Plant Projects (Analysis, F.S. and B.S.) 7- Solar Power Plant Projects, Industrial Technology Creation (Conceptual Design, F.S. & B.S.) from 2kW to 1000kW 8- Hydrogen as an Alternative Energy Carrier (Conceptual Design, F.S. & B.S.) 9- DC/AC Drive Conversion of Railway Transportation (C.D.) 10- Wiremesh Cable Trays 11- Cement Factories (F.S, B.S, Investment and Project Management) – 3 Projects accomplished 12- Mining and Mineral Separation / Classification Technology 13- TSP Fertilizer Production (F.S, B.S, Investment and Project Management) 14- Date Sugar Extraction and Mass Production (F.S, B.S. and Investment) 15- Technology Transfer and Mass Property Transfer Contract Consultancy and Contract Management (Privatization, Ownership Transfer, Operation Contracts, Energy Conversion Agreements etc.) Abbrevations: F.S. = Feasibility Study B.S. = Bankable Study C.D. = Conceptual Design (in patent process)

50 End-To-End System Solution
BPL (Broadband Over Power Line) Barsan Introduced BPL As A Pioneer Communication Medium The First Pilot Project For Transmission Of High Speed Data On 20KV And 220V Power Line For Tehran Regional Electric Company. The First Pilot Project For Transmission Of Voice On 20kv And 220v Lv Power Line For Providing Telephony Communication On Power Line By Using Transmission Of High Speed Data. Transmission Bandwidth For The Above Two Bpl Project Is 200 Mbps. Broadband Infrastucture Development Is One Of The Most Important Challenges For Worldwide Users Needs The Global Broadband Market Is Forecast To Grow Up $80 Billions Until 2008 The Annual Growth Rate Between Was Of 54% Need Cost Effective And Reliable Solutions That Bridge The “Digital Divide” High Income Economies Account Today For 94% Of The Broadband Users Backbone Gateway Access Point CPE’s MV Head End LV Head End HIGH VOLTAGE MEDIUM VOLTAGE LOW VOLTAGE CUSTOMER-PREMISE End-To-End System Solution

51 BPL (Broadband over Power Line) – Smart Grid Solutions
Smart Grid Services Represent The Industry’s Most Robust Capability To Leverage Real-time Electric Distribution Network. Services Set Includes The Following Core Elements: Power Automation Automated Meter Reading (AMR) Automated Outage Detection And Restoration Load Management Through Remote Monitoring Of Electric Utility Network Equipment Geographic Information System(gis)/Asset Management System Updates Efficient Demand-side Management/Direct Load Control Programs Voltage Monitoring From The Substation To The Meter Etc.

52 Distribution Automation System (DAS) By BARSAN
Barsan EPC Company Has Developed And Operated Distribution Automation System (DAS) To Achieve Its Goal Of Supplying The Best Quality of Electric Power. Initially, Barsan Has A Close Cooperation With Well known Companies, To Provide New DAS Systems To Offer Lower Investment and Ease of Management, As Well As Excellent Scalability, Reliability, And High Availability. Barsan’s DAS Is A Metropolitan Area System With Basic Functions Such As Remote Monitoring, Remote Control, Remote Measurement, And Remote Setup For Distribution Equipments And A Variety Of Additional Features For Effective Operation Of Distribution Such As Failure Detection On Distribution Line, Failed Section Identification And Flexible Load Switching, Loss Reduction By Sharing Related Data With Other Computer Systems, Overload Prevention, And Line Optimization.

53 Pre-stressed Concrete Sleeper Factory by Barsan
This Project Is Barsan’s First Attempt On Mass Production. Basic Idea Induced While Project Team Was Studying Various Resources To Procure Concrete Parts For Khorasan Railway Renewal Project. While It Was A Big Deal To Invest On Such A Project, Barsan Decided To Take The Risk, And Invest On The Factory, Considering Transportation Costs And Barsan’s Position Comparing To Other Competitors. The Sleeper Factory To Be Located At Minimum Distance To Consumption Place. Initial Capacity Of The Factory Is 1000 Sleepers In Two Work Shifts. Total Investment On Project Is Estimated About €3 Million, And Construction Period Will Be 14 Months.

54 Barsan Small Sustainable Energy Solutions
Barsan Has A Valuable Experience In Sustainable Energy Sources. Out Engineering And Project Execution Background Has A Deep Recognition And Close Touch Of Small Energy Solutions Like Wind Mills, Solar Plants And Small Water Turbines. Barsan Has Experimented Design And Prototyping Of Several Small Energy Systems As Well As Installation And Commissioning Of Large Power Plants. We Have Prepared A Complete Package Of Sustainable Energy Solutions Like: Small Wind Turbine (12.5kw) – First Attempt Of Stall Controlled Blades Designed In Iran. (Designed And Prototyped) Small Wind Turbine (25kw) (Designed And Prototyped) Small Asynchronous Water Turbines (0.3 To 1 MW) - Designed Very Small Water Turbines (1 To 50kw) – Designed New Concept On CSP Solar Power Plants (4 Kw, 50kw, 250kw And 1MW) Now Under Design, Prototyping And Patent Process Very Low Investment, Very Low Consumption Solar Lighting Solutions For Off Grid Usage Lighting And Other Small Purposes. Advance Solar Solutions For Energy Storage And Hydrogen Energy Carrier.

55 Qualified Tenders: Design ,Procurement,Construction & installation,Commissioning and operation of Mashhad Urban line 2 Client: Mashhad Urban Railway organization Consultant: Moshaver Pajohesh Co Design ,Procurement,Construction & installation,Commissioning and operation of Mashhad Urban line 2 Client: Mashhad Urban Railway organization Consultant: Moshaver Pajohesh Co Design ,Procurement, Construction & installation, Commissioning and operation of MIS oil field Development project Client: CNPCI Consultant: CNPCI Design ,Procurement, Construction & installation, Commissioning and operation of Saadat Abad 400/63/20KV GIS Substation Client: Tehran Regional Electric Co Consultant: Moshanir Co Design ,Procurement, Construction & installation, Commissioning of SSS Substations, phase 1, line 1 shiraz urban railway Client: Shiraz Urban Railway organization Consultant: IMER Co Design ,Procurement, Construction & installation, Commissioning of infrastructure of Ghazvin- Rasht- Anzali Transmission line Client: Islamic Republic of Iran Railways ( IRIR) Consultant:Metra Design ,Procurement, Construction & installation, Commissioning of Oromiyeh 132/20 kv Substation Client: Azarbayjan Regional Electric Co Consultant:Aran Naghsh Design ,Procurement, Construction & installation, Commissioning and operation of MIS oil field Development project Client: CNPCI Consultant: CNPCI Design ,Procurement, Construction & installation, Commissioning and operation of Saadat Abad 400/63/20KV GIS Substation Client: Tehran Regional Electric Co Consultant: Moshanir Co Design ,Procurement, Construction & installation, Commissioning of SSS Substations, phase 1, line 1 shiraz urban railway Client: Shiraz Urban Railway organization Consultant: IMER Co Design ,Procurement, Construction & installation, Commissioning of infrastructure of Ghazvin- Rasht- Anzali Transmission line Client: Islamic Republic of Iran Railways ( IRIR) Consultant:Metra Design ,Procurement, Construction & installation, Commissioning of Oromiyeh 132/20 kv Substation Client: Azarbayjan Regional Electric Co Consultant:Aran Naghsh Design ,Procurement, Construction & installation, Commissioning of Load arms N.I.O.P.D.C Client: Palayesh Naft Consultant:-

56 Qualified Tenders: Design ,Procurement, Construction & installation, Commissioning and operation of Bafgh-Baft-Sabzevar 400/33 kv Substations Client: Shahid Rajayi Institute Consultant: - Design ,Procurement, Construction & installation, Commissioning and operation of MV&LV Distribution system network at Heart Province Client: Ministry of Energy & Water Consultant: :MEW Design ,Procurement, Construction & installation, Commissioning of 400/132/6.6 kv substation of Jajarm Aluminum factory Client: Iran Alumina Consultant: Namvaran Design ,Procurement, Construction & installation, Commissioning of 300 KM Ethiopia 230 kv transmission line Client: EEPCO Consultant: - Design ,Procurement, Construction & installation, Commissioning of two 230 kv substations in Ethiopia Client: EEPCO Consultant: - Design ,Procurement, Construction & installation, Commissioning of 120 MW Wind farm in Ethiopia Client: EEPCO Consultant: - Design ,Procurement, Construction & installation, Commissioning of slurry transfer of Bauxite in Guinea Client: SBDT Consultant: Nipec Co Design ,Procurement, Construction & installation, Commissioning and operation of Oman 33/11 Substation Client: PDO Consultant: -

57 Qualified Tenders: Optimizing of distribution network and design, procurement, commissioning of AMR Client: Tehran electric distributing Co Consultant: Pajoheshgah Niro Design ,Procurement, Construction & installation, Commissioning of 33/11 kv Mobile Substation in Iraq Client: KRG Consultant:- Darbandikhan Hydro power Plant substations in Iraq Client: KRG Consultant:- Shiraz Urban railway Signaling System Client: Shiraz Urban railway Consultant: IMER Tabriz Urban Railway substation Client: Tabriz Urban Railway Consultant: Railbandar Shiraz Urban railway ventilation Client: Shiraz Urban railway Consultant:: IMER Electrification, Signaling, Communication of Esfahan Urban Railway Organization (line 1) Client: Esfahan Urban railway Consultant: IMER Herat renovation of electrical development Client: MEW Consultant:- Soleymaniyeh 132 kv substation and 300 km transmission line in Iraq Client: KDG Consultant:-

58 Qualified Tenders: Kabul renovation of Contribution network (phase 1) in Afghanistan Client: MEW Consultant : SMEC Supplying different electrical equipments in Afghanistan Client: DABM Consultant : - 4 km feeding system of Tehran Subway Client: Tehran Urban railway Organization

59 Barsan Certificates

60 Barsan Certificates

61 Barsan Certificates

62 Barsan Certificates

63 Barsan Certificates :

64 Barsan Certificates : Consortium of DEALIM and IDRO PIDECO
Certificate of work Quality Dated: 26May 2003 This is to certify that Barsan Modiriat Co Has performed “Loop Check” of Instrumentation in Area 1, 2, 4 & 13 of Phase 1 South Pars Gas Refinery, and has been accepted by PIDECO. Out thanks are addressed to management and technical staff of the company. Letter signed by Mr. Riahi Pour (site manage) And Saeed Asadi (E&I manager)

65 Iranian Power plant Project Management Company
Barsan Certificates : MAPNA Group Iranian Power plant Project Management Company Dated: 6 May 2006 To: Barsan Co. (CEO) Dear Sir, Hereby ref. your letter no. LG700/031 dated you are kindly informed that: First inspection show that in current time, not decreasing than the least situation required of management and staff, your company is qualified as a bidder for MAPNA tenders, to execute transmission lines up to 400kV, Substations up to 230kV as EPC projects, and also EPC projects of electrical & instrumentation. Letter signed by Behzad Azam Commercial Manager

66 No. 254, Iran Zamin St, Shahrak Gharb , Tehran-Iran
Tel: (+98-21) TeleFax: (+98-21)


Download ppt "Project Development Railway & Subway Substation & Transmission"

Similar presentations