KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS DEPARTMENT OF CONSTRUCTION ENGINEERING AND MANAGEMENT TERM PROJECT PRESENTATION CEM – 512: Value Engineering.

Similar presentations


Presentation on theme: "KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS DEPARTMENT OF CONSTRUCTION ENGINEERING AND MANAGEMENT TERM PROJECT PRESENTATION CEM – 512: Value Engineering."— Presentation transcript:

1

2 KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS DEPARTMENT OF CONSTRUCTION ENGINEERING AND MANAGEMENT TERM PROJECT PRESENTATION CEM – 512: Value Engineering Ring Main Unit SF6BY ABUL KARIM AL SULAIS

3 OUTLINE OF PRESENTATION Introduction Objectives Job Plan Information Phase Speculation (Generate alternatives) Evaluation Deployment Presentation Implementation

4 INTRODUCTION Electric Panel Factory at Dammam has decided to modify compact substation production line by replacing Oil Ring Main Unit (RMU) with sulphur hexafluoride insulation (SF 6). Replaced Oil Ring Main Unit (RMU) by SF6 insulation

5 OBJECTIVES 1. Replace Old and Obsolete Oil RMU 2. Use SF6 RMU 3. Select the best RMU 4. RMU should be delivered in six lots / 2 year 5. The cost of oil type RMU is 15,000 SR

6 SF6 in RMU SF6 gas is used in electrical power equipment It is insulation and arc quenching medium in RMU

7 SF6 Oil Type of Ring Main Unit

8 Compact Substation

9 Compact substation Layout Transformer LV MV

10 Infromartion- Requirment 1. Type- tested 2. Independent of climat 3. Maintenance - free 4. 15 KV, 630 Amp, 60 HZ,SF6,21 KA/sec 5. Hermetically -sealed welded switchgear enclosure 6. Compact and clear design 7. Short Delivery Period

11 compactEasy cable instalation Encapsulated, climate proof, Easy accessable, etc. maintenance free Easy cable installation Infromartion- Requirment

12 Information- Data Quotations Catalog Competitor

13 Information- Cost Data NoItemQ.TU.SRT.SR Dimension Delivery LHW 1Oil type RMU50017,000 8,500,000400900170014 2ABB500 22,000 10,450,000355775160012 3 SIEMENS500 23,000 11,040,000105835140012 4 Merlin Gerin500 20,000 9,600,000500775160010 5 Saudi Lucy500 20,000 9,200,000600120014008 6 Alstom500 20,000 9,600,0001010700131516 7 Hoeco500 19,000 8,835,000500700120020 8 Ormazabal500 19,500 9,360,000370900180020 9 F & G500 19,500 9,400,000320640140022

14 Why To install RMU in Compact S/S To have good market share How Select RMU Function Buy 500 RMU Select RMU Function Worksheet

15 Identify Present Function What dose it now do Verbnoun FeedTransformer LinkLoad Used Oil insulation What must it do VerbNoun Improvemarker share Reduce Maintenance Easyoperation & installation IncreaseCustomer acceptance

16 Analysis Phase- Ideas The most used RMUs in KSA 1. ABB 2. Siemens 3. Merlin Gerin 4. Saudi Lucy 5. Alstom 6. Hoeco 7. Ormazabal

17 Function Worksheet Function : Re Design Compact substation using SF6 RMU Why : To be competitive in the market How Select SF6 RMU

18 Reliability 1ABB6998322 2Siemens68910331 3Saudi Lucy5997303 4Merlin Gerin6886284 5Alstom5446195 6Hoeco3325137 7Ormazabal4224128 8F & G4344156 Probability of Implementation Replacement Cost Time of Implementation Total Rank Reliability

19 Idea Comparison AdvantageDisadvantageRank ABBCompactDelivery +Spare parts12 AlstomCompactPoor After Sales5 F& GPriceNo Technical support6 HolecPriceAfter sales support8 Merlin GerinPrice + DeliveryAfter sales support4 OrmazabalPrice and compactafter sales support + Spare parts 7 SiemensCompactDelivery10 Saudi LucyPrice + DeliveryDimension3

20 Weight Evaluation Raw Score Assigned Weight APrice1110 BDimension22 CDelivery33 DTechnical Support98 EService after sales65 FNumber of installed units44 GInstallation time77

21 Weights for Evaluation BCDEFG How ImportantAA-3A-2A/DA/EA-2G-1 3-Major PreferenceBB-2D-2E-2F-2G-2 2- Medium PreferenceCD-2C/EC-2G-2 1- Minor PreferenceDD-2 D/G EE/FE/G FF/G G

22 Low life cycle costs! independent of dust, animals and climate insensitive to failures easy to operate safe for people maintenance- free compact low building and real estate expenses Salvage value after 15 years

23 Life Cycle Analysis for 500 units N.o Item OriginalABBSiemensSaudi Lucy 1Install Cost 8,500,000 10,450,000 11,040,000 9,200,000 2Annual operation 500x 250125,000500 x 12060,000500 x 10050,000500 x 15075,000 3Salvage cost 500 x15075,000500 x 1000500,000 500 x 1200600,000 500 x 800400,000 4Life years 15

24 Life Cycle Analysis I = 8%N= 15 P/A= 8.5595P/F = 0.3152 P- Original = 9,546,298 P-ABB = 11,121,170 P- Siemens = 11,657,095 P-Saudi Lucy= 9,501,895 Choose Saudi Lucy since it is the lowest

25 Savings Original : Total SR 9,546,298 Proposed Saudi Lucy Total SR 9,501,895 Saving = 44,403 # 0.465 %

26 Value Study Summary Comprising between SF6 and Oil RMU Reduce the cost of compact substation Easy to install Increase customer acceptance of co S/S Increase the Factory market share RMU`s manufacturer will provided technical support for changing implement the new design Reduce maintenance cost Increase breakdown The difference in price between oil and SF6 is slightly very small

27 Implement Plan 1- How Should it be implemented? The propped RMU from Saudi Lucy will be discussed with factory, purchasing and engineering managers to overcome any road blocks prior to management presentation 2- What should be changed and in what sequence? Within approval the purchasing department should finalize the price and delivery time. Then, the designer shall revise the drawings to meet new approved SF6 RMU. 3- Who should do it? Engineering department and do necessary changes prior compact substation submittal to procurement department

28 Implement Plan 4- How long should it take? Two weeks 5- Any deadline required As per management report forcast 6- Implementation cost, internal house 30 hours for engineering 20 procurement 50. Total cost SR 3000