Presentation is loading. Please wait.

Presentation is loading. Please wait.

1923 Installed the first Movie Ticker at the NYSE, which would remain until the 1970s 1925 Listed on the American Stock Exchange: TLX 1920 Founded by.

Similar presentations


Presentation on theme: "1923 Installed the first Movie Ticker at the NYSE, which would remain until the 1970s 1925 Listed on the American Stock Exchange: TLX 1920 Founded by."— Presentation transcript:

1

2 1923 Installed the first Movie Ticker at the NYSE, which would remain until the 1970s 1925 Listed on the American Stock Exchange: TLX 1920 Founded by Percey Furber as a high-end video screen manufacturer 1930 Start of joint venture with RKO to create Trans-Lux theater-building program August 14, 1945 U.S. sailor and his girlfriend on VJ Day in front of the Trans-Lux Theatre in New York's Time Square 1958 Trans-Lux brings Felix the Cat to US audiences 1967 Trans-Lux premiers Speed Racer 1959 The famous scene in The Seven Year Itch outside the Trans-Lux Theater on Lexington Avenue at 52nd Street, New York City

3 Our HD Digital Display solutions say it all… Large screen LED & LCD systems including several industry firsts…

4 From LED to LCD, we have a solution to meet any need…

5 Allianz football stadium in Munich Germany Sports…

6 Iconic…

7 Liquid pub in Switzerland P50mm strip Mood…

8 MGM casino project in Hongkong (The stickers has been changed to MGM on site) Day / Night Mode…

9 Rembrandt square project in Holland In the day time time Outdoor…

10 The Venetian, our latest install, is the largest Full HD TV in the world… Over 100 feet wide!!

11 Rite Aid

12

13

14

15

16

17

18

19

20

21 Scope of Work Custom LED display as described. Trans-Lux has opted to submit quotations for a 16mm front serviced Oval, 16mm rear-serviced SMD and a 10mm front-serviced SMD LED displays. TNLX base operating system included, customer elective option to upgrade to the Epic control option detailed within. Owner responsible for power data, rack equipment and location of rack. TNLX to turnkey installation, including engineering, permitting, project management and supervision. Sales taxes, if applicable, adjusted on final invoice. Special inspection, if required, to be adjusted on final invoice. Street closure permits, if required, to be adjusted final invoice.

22 TNLX Services Engineering, including structural, electrical, computer & frame design. Installation, project management, supervision and permits. Onsite technical support, including display hook up & testing. Onsite training, including operation & maintenance training. 3-year All-inclusive parts and labor warranty. Inclusion of spare parts.

23 TNLX Front End System The Trans-Lux Epic management software is used create content layouts and schedules. All content file formats are compatible. Text overlay capability also enables placing text in another layer on top of static image or digital video content. Windowing capability enables a large display to be divided into multiple windows with different content shown in the various windows. The Epic Suite is user-friendly and full training will be provided as part of the solution.

24 TNLX Installation Provide Labor, Equipment and Materials as required to: Installation of frame and display. Budget includes fabrication and installation of misc. steel outrigger supports. Includes the following: Sign design & specification drawings. Structural Drawings and filings. Staff Time. Approved Los Angeles Certified sign fabrication for Supports. Sign installations of Customer Supplied Product. Sign Transportation & Delivery to the Jobsite. Guarantee & Warranty. $ 9,000,000.00 Certificate of Insurance while on the job site. Please forward at your convenience who shall be listed as additionally insured for each location.

25 Preliminary Installation Budget As instructed, we have included all necessary sign display content, to feature new Message Center Branding at the recommended sign location. Provide Labor, Equipment and Materials as required to: Install One (1) Single face curved LED Message Center Sign. Budget established to provide fabrication & installation of misc. steel outrigger supports. Projected Install & Steel Budget: $ 42, 186.00 Approximately $ 1, 500.00 for permit fees. The above synopsis pricing includes the following: Sign design & specification drawings Structural Drawings Staff Time Approved Los Angeles Certified sign fabrication for Supports Sign installations of Customer Supplied Product Sign Transportation & Delivery to the Jobsite Guarantee & Warranty $ 9,000,000.00 Certificate of Insurance while on the job site. Please forward at your convenience who shall be listed as additionally insured for each location. Continued …

26 We are fully aware, any labor and/or all additional sign types and/or alternates can be included at a later date as a supplemental conformity to design. If building and electrical permits are required, all associated permit fees will be billed at cost upon completion of the sign order. It is our endeavor to work in good faith in establishing a cohesive onsite working schedule that will be flexible for all involved. Electrical circuits (if required), as well as all necessary components associated with the same will be provided by the Customer. Sign Industries, Inc. will provide final hook-up to sign locations. If arrangements need to be made to run new primary electrical circuits we will be glad to assist with this as well. Sign Industries, Inc. will guarantee its products, against all defects in material or workmanship following the date of the installation. After receipt of your approved letter of intent and/or standard agreement, we will immediately proceed with sign fabrication, shipping and installation.

27

28

29

30

31

32

33

34

35

36


Download ppt "1923 Installed the first Movie Ticker at the NYSE, which would remain until the 1970s 1925 Listed on the American Stock Exchange: TLX 1920 Founded by."

Similar presentations


Ads by Google