Presentation is loading. Please wait.

Presentation is loading. Please wait.

Electrical distribution performance & risk management

Similar presentations


Presentation on theme: "Electrical distribution performance & risk management"— Presentation transcript:

1 Electrical distribution performance & risk management
TM ECOFIT Sepam 2000 by Sepam series 60/80 Customer Presentation INFRASTRUCTURE BUSINESS Jean-Claude MOLLARD Global Solutions & Engineering Management Automation Launch Leader

2

3 Agenda Introduction : Electrical Distribution Asset Optimisation & Retrofit solutions ECOFIT SEPAM 2000 : Installed Base ECOFIT SEPAM 2000 : Solution Description ECOFIT SEPAM 2000 : Retrofit Steps ECOFIT SEPAM 2000 : Conclusion & Global Benefits Before jumping in the presentation please explain briefly what is the presentation about and what are its main parts: the scope of the presentation is Electrical distribution network performance. In Part1 we’ll cover the introduction to Electrical Asset Optimization. In Part2 we’ll look to the MP4 service offer, its value proposition and major benefits. In Part3 we will go through the methodology which is used to define the services which later will be applied on each electrical equipment, and will describe the different plans as deliverables. Part4 is a conclusion part where you can present an offer for your particular customer and make a small resume of whole presentation. Of course, the is the responsibility of the speaker to decide which slides he wnts to use and how deep he will get on each of them.

4 Retrofit solutions at a glance
Customer benefits: improve installation safety, availability and quality provide a roadmap for maintenance and modernisation activities prioritise electrical investments to optimise CAPEX Objective of this slide is to summarize in 1, the major points of MP4 offer. All the slides that are after will detail one of the points highlighted here.

5 Retrofit of the obsolete SEPAM 2000 relays by a live SEPAM series 60 or 80 relay
We propose you a complete retrofit solution This proposal answers the following issues : Use of obsolete relays, which cannot be upgraded anymore, Use of relays which have not all the functionalities you may need Compensate the lack of spare parts on Sepam 2000 Relays 5 5

6 Agenda ECOFIT SEPAM 2000 : Installed Base
Introduction : Electrical Distribution Asset Optimisation & Retrofit solutions ECOFIT SEPAM 2000 : Installed Base ECOFIT SEPAM 2000 : Solution Description ECOFIT SEPAM 2000 : Retrofit Steps ECOFIT SEPAM 2000 : Conclusion & Global Benefits TM Before jumping in the presentation please explain briefly what is the presentation about and what are its main parts: the scope of the presentation is Electrical distribution network performance. In Part1 we’ll cover the introduction to Electrical Asset Optimization. In Part2 we’ll look to the MP4 service offer, its value proposition and major benefits. In Part3 we will go through the methodology which is used to define the services which later will be applied on each electrical equipment, and will describe the different plans as deliverables. Part4 is a conclusion part where you can present an offer for your particular customer and make a small resume of whole presentation. Of course, the is the responsibility of the speaker to decide which slides he wnts to use and how deep he will get on each of them.

7 Ecofit S2000 Current Situation End of Live data
Installed base very importante SEPAM2000 units over the world Existing Relays obsolete Competitors already propose and provide replacement solution at low price in some countries Need to have a plug and play solution to reduce as much as possible the site activity scope High references in retrofit solution and refurbishement solution inside SE Automation, helpful for Customer support End of Live data 2006 : end of sales 2015 : end of repair and end of components for spare parts

8 Ecofit S2000 The project objective Main Advantages
Manufacturing of a Plug and Play Solution providing a replacement of original Sepam 2000 relay by a Sepam series 60 or 80 Main Advantages No modification of existing wiring, (except if new functionnality added) No modification of Electrical drawings No modification of mechanical parts (cut off,…) on the panel or LV compartment Solution ready for new communication facilities, monitoring and remote control, providing up to 2 communication protocols (ModBus & IEC 61850) Availability of software convertion tools to transfer existing logics into Logipam automation toolsuite for all standard configurations Reduce the shutdown time Provide upgrade at minimum cost thanks to a manufacturer qualified solution

9 SEPAM 2000 - Installed base Evaluation
Split by Application and Case type Split by Application Family Split by Case type About 70% of S35/S36 case About 30% of S25/S26 case

10 Ecofit S2000 End Users Exclusion
Industrial Customers (except french users) : Sub-station (30%) Motors (cimenterie, Intensive & Oil & gas…) (25%) Transf (20%) BusBars ( 5%) Other (20%) Exclusion SEPAM 2000 with Amagnetic CTs In that case, we propose an ECOFIT S CTs replacement, SEPAM D31 & D32 For 3 Winding Transformers : To be replaced by MiCOM P633 SEPAM Rxx (RTU Applications)

11 Agenda Introduction : Electrical Distribution Asset Optimisation & Retrofit solutions ECOFIT SEPAM 2000 : Installed Base ECOFIT SEPAM 2000 : Solution Description ECOFIT SEPAM 2000 : Retrofit Steps ECOFIT SEPAM 2000 : Conclusion & Global Benefits Before jumping in the presentation please explain briefly what is the presentation about and what are its main parts: the scope of the presentation is Electrical distribution network performance. In Part1 we’ll cover the introduction to Electrical Asset Optimization. In Part2 we’ll look to the MP4 service offer, its value proposition and major benefits. In Part3 we will go through the methodology which is used to define the services which later will be applied on each electrical equipment, and will describe the different plans as deliverables. Part4 is a conclusion part where you can present an offer for your particular customer and make a small resume of whole presentation. Of course, the is the responsibility of the speaker to decide which slides he wnts to use and how deep he will get on each of them.

12 Ecofit S2000 – Solution Description
Ecofit Principle : The new SEPAM relay is integrated into a dedicated case, providing the same rear panel than the original Sepam 2000 A set of wired is provided, installed and tested at manufacturing place to interface the new Sepam terminal blocks with existing Sepam 2000 terminals, so that there is no wiring modification at customer side The global rack is inserted in lieu of the existing Sepam 2000 (same size), using the same cut off characteristics, and is fixed by using the normal fixing tools provided with the Sepam series 60 or 80. Standard Plug and Play Solution ! Cost Efficient solution vs other local players due to reduction of site activities !

13 Ecofit S2000 – Solution Description
S36 with series 60 or 80 relay S26 with series 60 or 80 relay (photo for information only) Ecofit S2000 Solution Kit S60 / S80 S60 / S80 Space used by S2000 In case type S36 Space used by S2000 In case type S26 Terminal blocks (connectors) initially connected to Sepam 2000 relay One document including : Safety Procedure and Installation Guide, Electrical Interface table (wiring interface), Factory End to End test report + + Commissioning test Procedure and test Equipment shall be provided separately by local team An Ecofit S2000 Relay 1 set of Spare cables and screws

14 Ecofit S2000 – Solution Description
Summary of Applications and Typical Retrofit Configurations : Standardized configurations ! SEPAM series 60 or 80 Range is automatically selected when filling in the order form ! In case of Customized Logipam, Series 80 will be proposed

15 Original SEPAM 2000 Configuration
Ecofit S2000 Detailed list of Applications and Typical Proposed Configurations : SEPAM series 60 or 80 Range is automatically selected when filling in the order form ! S80 application MES120 MET148-2 MCS025 Original SEPAM 2000 Configuration Configuration standard en Sepam80 Transformer Application without Temp. sensor T81 1 T07, T12 2 T01,T03,T09,T14,T15,T17,T18,T19 T82 T13 T02, T06, T10 Transformer Application with Temp. sensor T27, T32 T21,T23,T29,T34,T35,T37,T38,T39 T33 T22, T26, T30 Generator Application G82 G01, G05, G07 G02, G06, G08 G12, G13 G03 G04 G87 G17

16 Ecofit S2000 : Pricing comparison in terms of Man.Days
Competitor Typical execution time (Base Reference time) Time Typ. 1 Day min. Up to 3 Days (Base: French market) Typical Retrofit Steps Site visit Drawing update & Relay selection Setting and Logics transfer to new relay Dismounting, wiring replacement, Door Cut-off modification Mounting & wiring Commis- sioning (*) Typical 0,5 Day (Base: Pilot sites) Time SE Typical execution time with ECOFIT S2000 Engineering Time Site Activity & Protection Feeder unavailability ! (*) Can Be reduced thanks to Transfer tools availability

17 Sepam 2000 to Sepam series 60/80: What changes in software ?
All protective functions are still available in the new Sepam series 60 or 80 relay, New protective functions or Automations are available for future use Settings are performed through SFT2841 software, already used for Sepam range relays All Automation and logics are uptaded using SFT2885 software, ModBus protocol is available as well as new IEC standard protocol With this slide we want to raise customer interest around its electrical network, the risks and main stakes. We also want to point that Electrical Management Services are the services offers which respond to customer requirements all over the entire life cycle of his electrical Installations. 17

18 Agenda Introduction : Electrical Distribution Asset Optimisation & Retrofit solutions ECOFIT SEPAM 2000 : Installed ECOFIT SEPAM 2000 : Solution Description ECOFIT SEPAM 2000 : Retrofit Steps ECOFIT SEPAM 2000 : Conclusion & Global Benefits Before jumping in the presentation please explain briefly what is the presentation about and what are its main parts: the scope of the presentation is Electrical distribution network performance. In Part1 we’ll cover the introduction to Electrical Asset Optimization. In Part2 we’ll look to the MP4 service offer, its value proposition and major benefits. In Part3 we will go through the methodology which is used to define the services which later will be applied on each electrical equipment, and will describe the different plans as deliverables. Part4 is a conclusion part where you can present an offer for your particular customer and make a small resume of whole presentation. Of course, the is the responsibility of the speaker to decide which slides he wnts to use and how deep he will get on each of them.

19 A four step methodology
- Process Identification, - risk and Drawings analysis - Trip & 50BF circuit isolation - Set the new EcofitS2000 - Test it ‘’off board’’ (option) - Disconnect & Remove old Sepam 2000 - Re-insert and connect the new Ecofit S2000 - Connect Com connection if needed (option) - Re-energize the new Ecofit Perform final Checks & Tests This slide is a synthesis of the MP4 delivery process. We think it is important to explain to the customer how this audit will be realized and what he will have as a result of the process. So main messages : MP4 is realized at the customer site. At the end of the diagnosis (standard duration time vary between 4 and 10 days on site), the consultants will present a criticality analysis synthesis and 4 improvement plans. The draft report will be also provided the customer. A final detailed report including data collected during the audit is delivered in week or a bit more after end of the audit. You can also explain that we propose the possibility to access to all data (some customers may be interested by installed base data) through an internet address linking to a web server. It also gives introduction into delivery process of MP4: We want to show to the customer that MP4 offer is based on: - structured methodology and - that the result is delivered in 4 plans which can be implemented in order to bring improvements. The methodology will be described in detail in the following slides and 4 plans presented in slides Identification / Dismounting / Mounting / Wiring Commissionning / Feeder energisation H 0 H 0 + 1,5hours H 0 + 3hours max One example based on a 3 hours on-site execution 19

20 SEPAM 2000 – Retrofit Steps example
From Left to Right and Top to Down – Solution with S26 Case :

21 SEPAM 2000 – Retrofit Steps example
From Left to Right and Top to Down – Solution with S26 Case :

22 SEPAM 2000 – Retrofit Steps example
From Left to Right and Top to Down – Solution with S26 Case :

23 SEPAM 2000 – Retrofit Steps example
Solution with S36 Case – Same process than for S26 case except the implementation of a blanking plate at right side (provided) : Before After

24 Agenda Introduction : Electrical Distribution Asset Optimisation & Retrofit solutions ECOFIT SEPAM 2000 : Installed Base ECOFIT SEPAM 2000 : Solution Description ECOFIT SEPAM 2000 : Retrofit Steps ECOFIT SEPAM 2000 : Conclusion & Global Benefits Before jumping in the presentation please explain briefly what is the presentation about and what are its main parts: the scope of the presentation is Electrical distribution network performance. In Part1 we’ll cover the introduction to Electrical Asset Optimization. In Part2 we’ll look to the MP4 service offer, its value proposition and major benefits. In Part3 we will go through the methodology which is used to define the services which later will be applied on each electrical equipment, and will describe the different plans as deliverables. Part4 is a conclusion part where you can present an offer for your particular customer and make a small resume of whole presentation. Of course, the is the responsibility of the speaker to decide which slides he wnts to use and how deep he will get on each of them.

25 Retrofit Activity Repair, Improve, Monitor and Anticipate !
Reliability To align with your anticipated needs Your need Monitoring Plan Modernisation Plan, by Implementation of new functions Initial performance t3 Maintenance Plan This plan may not appear as “obvious” as the first 2 ones. But it is key to really master what is going on in the installation. We may also use this plan to “open the door” regarding energy measuring and therefore Energy efficiency topic. t1 t2 t4 Time Retrofit Execution

26 Asset optimisation value proposal : guarantee your peace of mind all over the lifecycle of your installation With this slide we move into the Asset Optimization value proposal. We want to point here that Asset Optimization services propose a customer different solutions and support in the any stage of his installations lifecycle. Also here we show the place of Installation Assessment in Asset Optimization services offers and so make a link to the following slides.


Download ppt "Electrical distribution performance & risk management"

Similar presentations


Ads by Google