1 Water Control Structure L-4 Rehabilitation - Change Order 1 Emergency Repair of Unforeseen Condition

2 Divert the Belleaire/Royal Palm Waterways through weir structures at B-1, B-2, and B-3 Dewater the area adjacent to L-4 Weir with sheet piles Determine the nature and extent of the problem Decide on a course of action and repair the unforeseen condition Repair the unforeseen condition Restore the flow ways of the Belleaire/Royal Palms Waterways Rebuild the weir structures at B-1, B-2 and B-3 Scope of Work

3 Divert the Royal Palms and Belleaire Waterways through the weir structures at B-1, B-2 and B-3.

4 Determining the extent of the unforeseen conditions

5 Three dimensional modeling indicated that the void had a volume of approximately 110 cubic yards

6 Filling the void with 110 cubic yards of flowable fill through 19 - 6 inch holes that were drilled in the weir deck

7