Presentation is loading. Please wait.

Presentation is loading. Please wait.

Strawbale house. Main challenge of this project is to develop...

Similar presentations


Presentation on theme: "Strawbale house. Main challenge of this project is to develop..."— Presentation transcript:

1 strawbale house

2 Main challenge of this project is to develop...

3 a replicable design for a Factor 10 office building... Factor 10 means 90% reduction of resource consumption compared to conventional buildings. In other words you could build 10 S-Houses for the same environmental load of 1 house of equal size in conventional technology.

4 Factor 10 a replicable design for a Factor 10 office building...

5 suitable for series production.

6 The development will be realized by an innovative combination of...

7 passive house technology, passive house °C

8 renewable resources and regionally available materials.

9 made of renewable raw materials like wood, straw and clay highly innovative solutions like bioplastic screws contemporary architectural design

10 Highly efficient biomass stove - modular and flexible - experience of open fire - thermal comfort

11 more infos at Click to show wall construction video

12 The End


Download ppt "Strawbale house. Main challenge of this project is to develop..."

Similar presentations


Ads by Google