Presentation is loading. Please wait.

Presentation is loading. Please wait.

Proposal for Task Group Deliverables May 9, 2004

Similar presentations


Presentation on theme: "Proposal for Task Group Deliverables May 9, 2004"— Presentation transcript:

1 Proposal for Task Group Deliverables May 9, 2004
January 2002 doc.: IEEE /xxxr0 May 2004 Proposal for Task Group Deliverables May 9, 2004 Clint Chaplin IEEE FR Study Group Clint Chaplin, FR SG Chair John Doe, His Company

2 Deliverables Define Terminology
January 2002 doc.: IEEE /xxxr0 May 2004 Deliverables Define Terminology Survey of Current BSS-Transition Orthodoxy Use Cases (Usage Model) Functional Requirements Test Methodology Performance Metrics Selection/Acceptance Criteria Draft Standard Clint Chaplin, FR SG Chair John Doe, His Company

3 Define Terminology “Security must not be decreased” Others?
January 2002 doc.: IEEE /xxxr0 May 2004 Define Terminology “Security must not be decreased” Others? Clint Chaplin, FR SG Chair John Doe, His Company

4 Survey of Current BSS-Transition Orthodoxy
January 2002 doc.: IEEE /xxxr0 May 2004 Survey of Current BSS-Transition Orthodoxy What are the necessary and optional steps currently taken during a BSS Transition What is specified vs. what is implicit Include TGe, TGi Include others? Clint Chaplin, FR SG Chair John Doe, His Company

5 Use Cases (Usage Model)
January 2002 doc.: IEEE /xxxr0 May 2004 Use Cases (Usage Model) What application types need TGr, and what are the requirements that are needed? Clint Chaplin, FR SG Chair John Doe, His Company

6 Functional Requirements
January 2002 doc.: IEEE /xxxr0 May 2004 Functional Requirements What are the key requirements that IEEE r needs to meet? Clint Chaplin, FR SG Chair John Doe, His Company

7 January 2002 doc.: IEEE /xxxr0 May 2004 Test Methodology What are the test setups used to measure BSS Transitions? Under what conditions are tests to be made? What is measured during tests? frfh-measurement roaming-intervals.ppt frfh-roaming-intervals-measurements.ppt frfh-analysis-roaming-techniques.ppt Clint Chaplin, FR SG Chair John Doe, His Company

8 January 2002 doc.: IEEE /xxxr0 May 2004 Performance Metrics What results from the test setup are acceptable? What is our minimum acceptable threshold on the tests? Put another way, what maximum times in the tests are acceptable? Clint Chaplin, FR SG Chair John Doe, His Company

9 Selection/Acceptance Criteria
January 2002 doc.: IEEE /xxxr0 May 2004 Selection/Acceptance Criteria What criteria is used to accept/reject proposals? Not necessarily a down-select criteria; may be more than one solution in standard. Information from previous deliverables used in this deliverable. Contradictory vs. complimentary solutions? Clint Chaplin, FR SG Chair John Doe, His Company

10 Draft Standard Call for proposals Present proposals
January 2002 doc.: IEEE /xxxr0 May 2004 Draft Standard Call for proposals Present proposals Apply selection criteria Accept proposal(s) Draft draft Clint Chaplin, FR SG Chair John Doe, His Company


Download ppt "Proposal for Task Group Deliverables May 9, 2004"

Similar presentations


Ads by Google