Presentation is loading. Please wait.

Presentation is loading. Please wait.

Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Closing Report.

Similar presentations


Presentation on theme: "Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Closing Report."— Presentation transcript:

1 Jul 12, 2010 07/12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG10 (L2R) Closing Report for September 2013 Date Submitted: September 2013 Source: Clint Powell, Powell Wireless Commsulting, LLC Contact: Clint Powell, Powell Wireless Commsulting, LLC Voice: , Re: TG10 (L2R) Closing Report for September 2013 Interim Abstract: Closing Report for the TG10 (L2R) Sessions in Nanjing Purpose: Layer 2 (Mesh Under) Routing Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Page 1

2 Jul 12, 2010 07/12/10 TG10 (L2R) Draft a recommended practice for Layer 2 Routing of Dynamically Changing Mesh Networks. ----- Meeting Notes (17/01/ :38) ----- Replace 1st paragraph with context for TVWS Page 2

3 Meeting Goals/Status Recap PAR and 5C EC Approval
Jul 12, 2010 07/12/10 Meeting Goals/Status Recap PAR and 5C EC Approval Discuss Sept Interim Plan for Nov. Joint Session w/ 802.1 Develop Material for Nov. Joint Session w/ 802.1 Develop Contributions Request for for Nov. Page 3

4 Meeting Goals/Status Develop Initial Requirements
Jul 12, 2010 07/12/10 Meeting Goals/Status Develop Initial Requirements Develop Initial Timeline Generated Action Items List Minutes: see doc. # Page 4

5 Next Steps Between now and Dallas (November 2013)
Jul 12, 2010 07/12/10 Next Steps Between now and Dallas (November 2013) Finish Preparing for Nov. Mtg. Complete Action Items At Dallas (November 2013) Hold Joint Sessions w/ 802.1 Revisit Timeline Work on Next Steps Page 5


Download ppt "Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Closing Report."

Similar presentations


Ads by Google