Presentation is loading. Please wait.

Presentation is loading. Please wait.

Submission Title: [WG-Treasurer’s Report July04]

Similar presentations


Presentation on theme: "Submission Title: [WG-Treasurer’s Report July04]"— Presentation transcript:

1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [WG-Treasurer’s Report July04] Date Submitted: [12July2004] Source: [John Barr] Company [Motorola] Address [1303 E. Golf Road, Schuamburg, IL 60196] Voice:[ ], FAX: [ ], Re: [] Abstract: [Treasurer’s Report to WG] Purpose: [Treasurer’s report to WG to update them from the last session.] Notice: This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by January 2004 doc.: IEEE /0160r0 Dr. John R. Barr, Motorola John Barr, Motorola

2 Summary of Anaheim Interim
Expenses: $209, (Budget of $236,750) Fixed - $27, (includes $11,110 hotel rebate) Variable - $181, (650 attendees) Income: $291, (Budget of $250,000) Early - $143,600 Late - $152,500 Refunds and etc. - -$4,150 Surplus of $82,735.23 Dr. John R. Barr, Motorola

3 Berlin Meeting Expected costs are much higher
$60,000 of current surplus applied to Berlin meeting Take note of registration fee increases Dr. John R. Barr, Motorola

4 January 2005 Interim Monterey, CA – Hyatt
Only room for wireless Working Groups: 11, 15, 18, 19, 20, 21 16 will meet separately Dr. John R. Barr, Motorola


Download ppt "Submission Title: [WG-Treasurer’s Report July04]"

Similar presentations


Ads by Google