P.O. Box 29497 – Abu Dhabi – United Arab Emirates Telephone : +971-2-4458030 – Fax : +971-2-4458035 Website: -

Similar presentations


Presentation on theme: "P.O. Box 29497 – Abu Dhabi – United Arab Emirates Telephone : +971-2-4458030 – Fax : +971-2-4458035 Website: -"— Presentation transcript:

1 P.O. Box – Abu Dhabi – United Arab Emirates Telephone : – Fax : Website: - Date Revised : March 2012 Sharjah – United Arab Emirates Website:

2 2. Continual Training of Staff to further Improve their Competency. RemCon Electrical Co. L.L.C. is an Abu Dhabi based company established in 2004 to cater for the needs of local and regional customers in the field of Power Transmission & Distribution. Our offerings include engineering, supply, installation, testing, commissioning and After Sales Service of Substations, Switchgears, Transformers and HV Cable Systems. Together with our partners we offer complete solutions to suit any customer requirement in that field. Customer confidence and a growing customer base are the basis of our success and helped us to achieve a double digit growth. Our ultimate target is to become one of the most trusted and reliable Partner for our customers in the region. RemCon Electrical Co. L.L.C. fully committed towards achieving excellence through: 1. Utilizing our experience in the field of Transmission & Distribution in providing excellent services to our clients. 3. Continual Improvement of the established Integrated Management System. 4. Complying with all legal & regulatory requirements 5. Complying with national and international standards. 6. Ensuring occupational health and safety in all areas at all times 7. Operating in an environmentally friendly manner in all areas at all times. 8. Reducing waste & preventing pollution. 9. Understanding and meeting customers requirement to the fullest.

3 MANAGEMENT TEAM Mr. Gerhard Siegel Managing Partner Mr. Mohamad Dakkak Managing Partner Administration Department Contracts & Tendering Department Finance Department Office Support Department Projects Department Safety Officer Engineering Manager Execution Manager Projects Manager Substations DepartmentElectrical Department 3

4 Admin & Finance Department HR & Admin 1 Administration Assistant 1 Finance Manger 1 Server Adminintrator/IT 1 Clerk, Messenger, Drivers 10 Total 14 Contracts & Tendering Dept. Tendering & Contracts Manager 1 Sales Engineer 1 Purchase Coordinator 2 Total 4 Civil Engineer Civil Engineers2 Total 2 Transformer Team Transformer Specialist and Supporting Team 5 Total 5 Commissioning Engineers Sr. Commissioning Manager 1 Testing & Comm. Engineers 9 Total 10 Design Team Design Engineer 2 Assist Design Engineer 2 Total 4 Electrical Sr. Project Manager 4 Project Engineers 4 Asst Project. Engineer 1 Electrical Engineer Site Manager 5 Electical Engineer 10 Supervisor 1 Electrician 27 Storekeeper 2 Total 54 Safety Safety Officers 5 Total 5 HV/MV Cable Team Cable Specialist / Jointer 4 Cable Jointers 16 Total 20 Telecom Telecommunications Engineer 1 Electronic Comm. Technician 1 Total 2 Switchgear Team Switchgear / GIS Specialist and Supporting Team 5 Total 5 4

5 Al Jazeera Club RemConEletrical Co. Silver Building - Al Dhafra St Mez. Flr. M1 & M2 -AUH - UAE RemConEletrical Co. Silver Building - Al Dhafra St Mez. Flr. M1 & M2 -AUH - UAE Muroor Road To Dubai Abu Dhabi City Al Ittihad Delma Flyover Airport Road Zayed University Occidental Bldg. Mubadalla NBAD Emirates Media Emirates Media Eid Yard 5

6 Site Office Listings 1.Al Wathba Site Office – Yas Island Site Office Reem Island Site Office Dubailand Site Office Wahat Silicon Site Office – Sudah Port – Fujairah Site Office – Reemraan Site Office – Girhart & Nakheel Site Office – Munai – Fujairah Site Office Mussafah Store – Dubailand Site Office - Dubai Sudah Port – Fujairah Site Office 6 Al Wathba Site – Abu Dhabi

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 Design/engineering and execution of power cable projects. Construction of high voltage cable turnkey installations including consultancy services and related equipment. Installation, supervision, testing and commissioning of cable networks or cable accessories. Connection of new XLPE routes to existing oil cable installations Technical advice, expert's opinion, Site/Project management for power cable projects 14

15 Supply and Installation of High and Medium Voltage Cable systems from Cable Systems, Cables and Accessories from 11kV up to 550 kV 15

16 Diagnostic testing of power cable systems 10kV – 132kV. Diagnostic testing of switchgears, transformers, generators and motors. Commissioning testing of mediumand high voltage switchgears with impulse voltages up to 550kV. Commissioning testing with A.C. voltage of power cable systems up to 500kV. MV & HV cable services such on jointing and termination through certified staff up to 500kV. Power System Services 16

17 Design/engineering and execution of HV & MV installations. Installation, supervision, testing and commissioning of Protection and Control systems. Retrofit & Upgrading of existing systems. Maintenance Contracts, Service, and overhaul of existing systems 17

18 Engineering, Testing & Commissioning of Control Systems, SF6 gas monitoring. Retrofit of existing plants 18

19 Design, supply, installation, testing and commissioning of MV & HV substations. Preparation of technical documentation. Performance of all technical calculation. Complex Grid Calculation. Documentation of the calculation by means of suitable software. For Design and calculations we are utilizing the competence and know-how of some of our principals in Europe, i.e. Siemens, Simatex, Areva who are considered to be experts in that field. 19

20 Design/engineering and execution of HV & MV installations Installation, supervision, testing and commissioning of High & Medium Voltage Switchgears incl. Protection and Control systems. Retrofit & Upgrading of existing systems. Maintenance Contracts, Service, and overhaul of existing systems 20

21 Supply, Installation, Testing and Commissioning of Protection and Control Panels. AC and DC Distribution Boards. 21

22 Maintenance of MV & HV Substations Rehabilitation and maintenance of transmission and distribution equipment. Dismantling of existing equipment. Relocation, installation, testing and commissioning of relocated equipment. Retrofit of existing equipment Remote End Modifications in existing substations. Engineering for Cable Systems Preparation of technical documentation for cable systems (MV & HV Cables and accessories) Project design of high voltage cable systems: Performance of all technical calculations Current Load calculation (several cable systems) Calculation of admissible short-circuit currents, induced voltages, etc. 22

23 Installation, supervision, testing and commissioning of Transformers Maintenance, Diagnosis including electrical, chemical & mechanical analysis. Maintenance Contracts, Service, and overhaul of existing systems 23

24 No.PROJECT NAMECLIENTCONTRACTORCOUNTRYPROJECT DESCRIPTIONYEARRemarks 85TRANSCO Contract No. N TRANSCON/AUAE Transferring and Installation of 132/11kV Mobile Station from YAS Island to Mussafah Area (M12) and associated works 2012In Progress 84TRANSCO Contract No. N-11777TRANSCON/AUAE Shifting of 140MVA, 220/33kV Power Transformer from Ghantoot Site to Al Wathba 220/33kV Substation. 2011In Progress 83ADCO ASAB ProjectADCONCCUAE Installation of 132kV Cables and accessories for area at ASAB, Sahel, Shah and Habshan. 2011In Progress 82OTV Sanotec JV Transformer TestingOTV SanotecN/AUAE ISTP2 Project : Testing of Transformers at Al Wathba 2 – Waste water treatment Plant 2011In Progress 81TTEOM Order No. 11/7855TTEOMN/AUAE400kV Transformer oil leaks repair works2011Completed 80TRANSCO Contract N-5208TRANSCOETAUAESupply and installation works for 132kV GIS & TRF terminations2011Completed 79 BOB Gas Compression ProjectADCOSK EngineeringUAECarry out of stability test for 220kV System at Habshan Project2011Completed 78 BOB Gas Compression ProjectADCOSK EngineeringUAEPerforming of oil filling, Filtration and BDV test for 8 transformers2011Completed 77 BOB Gas Compression ProjectADCOSK EngineeringUAECarry out of Hipo Test of 33kV Cable at Habshan Project2011Completed 76 BOB Gas Compression ProjectADCOSK EngineeringUAECarry out of plug in termination at 33kV cables at Habshan Project2011Completed 75BOB Gas Compression ProjectADCOSK EngineeringUAE Erection, Testing and Comissioning of 2 Nos 220 kV Transformer at Habshan Project 2011Completed 24

25 No.PROJECT NAMECLIENTCONTRACTORCOUNTRYPROJECT DESCRIPTIONYEARRemarks 68 Installation of 220kV / 132kV Transmission at Oman OETCL&T OmanOman Installation works of 220kV & 132kV cable terminations at Blue City Grid Station 2010Completed 70Takreer Ruwais ProjectTakreerGS EngineeringUAEErection works of 33kV Cable termination at TAKREER Ruwais Project2010Completed 69 Installation of 220kV / 132kV Transmission at Oman OETCL&T OmanOmanInstallation works of 220kV & 132kV cable terminations at DPC Grid Station2010Completed 67 Installation of 220kV / 132kV Transmission at Oman OETCL&T OmanOmanInstallation works of 220kV & 132kV cable terminations at Misfah Grid Station2010Completed 66Contract No. E03/2009FEWASIEMENSUAEDesign & Build Contract for 132/33/11kV Substation in Northern Emirates2010In Progress Installation of 220kV / 132kV Transmission at Oman OETCL & T OmanOmanInstallation works of 220 & 132 kV cable Termination at IBRI Grid Station2011In Progress 73 Installation of 220kV / 132kV Transmission at Oman OETCL & T OmanOmanInstallation works of 220 & 132 kV cable Termination at Ghriyat Grid Station2011In Progress 72 Installation of 220kV / 132kV Transmission at Oman OETCSEPCO IIIOmanInstallation works of 220 & 132 kV cable Termination at DPC Grid Station2011In Progress 71 Contract No. D ADDCN/AUAE Replacement of 33/11kV 20MVA Power Transformer HTR1 at E12 (Free Port) Primary Substation 2011Completed

26 No.PROJECT NAMECLIENTCONTRACTORCOUNTRYPROJECT DESCRIPTIONYEARRemarks 56 TRANSCO Contract N-6126 TRANSCO N/AUAE TRANSCO N-6126 – Replacement of 132kV Oil Filled cables by 1000 Sq.mm XLPE Cables. 2009In Progress 58 TRANSCO Contract No. N-6878 TRANSCO N/A UAE Supply and Intallation of new 220/33kV Mobile at Shamkha Area and Replacement of Old Battery and Bettery Chargers in Substations 220kV Al Wathba and 132kV W2 2009Completed 57 TRANSCO Contract N-6526 TRANSCO N/AUAE 132kV Double Circuit Connections between the New 400/132kV GIS at BAHIA and the 132/22kV S/s at YAS Island. 2009In Progress TRANSCO Contract No. N-7747 TRANSCO N/A UAE Supply and Installation of New 220/33 kV Mobile At Qaser Al Sarab in Hameem Liwa East 2010In Progress kV EHV Cable Accessories for Various Grid Station in OMAN LARSEN & TOUBRO N/AOMAN 132kV EHV Cable Accessories for Various Grid Station in OMAN – DPC Grid Station (SFZ & IWPP), 132/33kV Misfah Grid Station, 220/33kV Blue City Grid Station, Nakhal Grid Station In Progress 64 Sohar Aluminium Smelter Project Bechtel & Co. LLC. N/AOman Supply and Installation of 220kV Cable Terminations 2010In Progress 63 DEWA - Contract No. DL-M2-02 RP DEWASIEMENSUAE Supply, Installation, Testing & Commissioning of 132/11kV Substations at Dubailand Mizin Project for Tatweer and Associated Works. Remraan 2010In Progress 62 DEWA - Contract No. DL-M2-02 RP DEWA SIEMENSUAE 132kV Substation Wahat Silicon - Elelctrical and Mechanical Installations2010In Progress 61 DEWA - Contract No. CNE/599D DEWA SIEMENSUAE Installation, Testing and Commissioning of 400/132kV (Dubail Land -2) Substations and associated works. 2010In Progress 60 TRANSCO Contract No. N-7641 TRANSCON/AUAE 132/33 kV Mobile substation at Sudah Port to Feed IPIC Loads. Location: Fujairah. 2010In Progress

27 42 ADDC - Contract No. D-8062 ADDCN/AUAE Replacement of SIEMENS LV Panels in Abu Dhabi Island 2008 Completed No.PROJECT NAMECLIENTCONTRACTORCOUNTRYPROJECT DESCRIPTIONYEARRemarks kV GIS Erection and Protection Works SEWASIEMENSUAE Installation of 220kV GIS & Protection Works at Sajja Extension.2008Completed 52 TRANSCO Contract No. N-6325 TRANSCON/AUAE Replacement of Distance Relays on 132kV Cable Feeders with Current Differential Protection Relays and related Telecom. & protection Signalling. 2008In Progress 53 TRANSCO Contract No. N B TRANSCOSIEMENSUAE Erection / Installation Works of 4 Nos. 132 kV Substations in Khalifa Park and related Areas. 2008In Progress kV GIS Erection and Protection Works SEWASIEMENSUE Installation and Commissioning Works at 132kV Extension Narsiya.2008Completed 43 TAWEELAH TTEOMN/AUAE AGPS 11kV SF6 ABB MB C.B. Inspection2008Completed 51 TRANSCO Contract No.N-6377 TRANSCOSUDKABELUAE Installation works for 132kV Cables and Accessories at RAK -Al Qusidat2008Completed 50 ADDC Contract No. D ADDCN/AUAE Retiring of 33kV Switchgear at Old ADPS - with related cabling works.2008Completed 49 Upgrading of Al Salam Street & Eastern Corniche Rd. Contract No. 2 TRANSCOAL KharafiUAE Supply and Installation works for 132kV Cables for the upgrade of Salam St. 2008Completed 48 AADC - Contract No. A-3803 AADCN/A UAE Replacement of Existing Protection Relays at 33/11kV Primary Substation and Distribution Substations.2008 In Progress 47 TRANSCO - Contract No TRANSCOSIEMENSUAE Erection / Installation Works of 400/132/22kV Substation at Sadiyaat Island 2008 Completed 46 SEWA Contract No.-PD/06/ SEWASIEMENSUAE Installation of 220/132/11kV Substation at Al Tay 2008 Completed 45 TRANSCO - Contract No. N TRANSCON/AUAE Power Supply to Al Mafraq Worker City F1 & F /33kV Temporary Substation 2008 Completed 44 FEWA –Contract E05/2008 FEWAN/A UAE 132/33kV Substation Works in Northern Emirates2008In Progress 27

28 No.PROJECT NAMECLIENTCONTRACTORCOUNTRYPROJECT DESCRIPTIONYEARRemarks 34 TRANSCO - Contract No. N4991 TRANSCOAREVAUAE Relocation of 132/11kV Mobile Substation to Madinat Khalifah2007Completed 41 TRANSCO - Contract N-4915 TRANSCOSUDKABELUAE Installation works for 132kV Cables and Accessories at Reem Island 2007 In Progress 40 AADC Contract No. A-4143 AADCN/AUAE Supply, Installation &Comissioning of 11kV OHL Earth Fault Indicators 2007 Completed 39 Shadeed Iron & Steel Project (SIS) L&T N/A Oman Supply and Installation of 220kV Cables and Accessories Completed 38 Sohar Aluminium Smelter Project Bechtel & Co. LLCN/AOman Supply and Installation of 220kV Cable Terminations 2007Completed 37 Al Taweelah A1 Repair Works TTEOMN/AUAE Installation of 400kV Essential Parts of GIS Termination, Transformer Termination and Cable Accessories + Transformer Work. 2007Completed 36 TRANSCO - Contract No. N5796 TRANSCO N/A UAE Re-location of 2 x 132/11kV Mobile Substations to YAS Island2007Completed 35 Wasit Power Plant Cable System SEWA SCAN UAE Supply and installation of 220/132kV Cable Accessories at Wasit Power Plant 2007Completed 28 ADWEA Contract A-2943 ADWEAN/AUAE Supply & Installation of 11kV Autoreclosres at Al Ain Electrical Network.2007Completed 33 FEWA - Contract E28/06 (2) FEWAN/AUAE Installation, Testing & Commissioning of 132/33/11V and 33/11kV Substations in Northern Emirates. 2007Completed 32 Al Taweelah A1 Repair Works TTEOMN/AUAE Supply and Installation of 400kV Essential Parts of Transformer Termination and Cable Accessories Work. 2007Completed kV Cable Work at GHUBARA Power & Desalination Plant, Oman Ghubara / SOGEX Oman Repair / Replacement of 132kV Cable Joints at GHUBARA Power & Desalination Plant, Oman 2007Completed 30Al Taweelah A1 - Repair Works TTEOMN/AUAE Supply and Installation of 400kV Essential Parts of GIS Termination, Transformer Termination and Cable Accessories + Transformer Work. 2007Completed 29 FEWA Contract 35-M/3/35/2006 FEWAN/AUAE Shifting of Capacitor Bank and Accessories from Hamraniya S/S to Umm Al Quawain Main S/S. 2007Completed 28

29 No.PROJECT NAMECLIENTCONTRACTORCOUNTRYPROJECT DESCRIPTIONYEARRemarks 19 Replacement of 132kV GIS Termiantions at Sports Center SEWAN/AUAE Supply and Installation of 132kV GIS Terminations2006Completed 27 TRANSCO Contract No. N2763 TRANSCON/AUAE Relocation of 220kV Nobile Substation from Al Hayer to Liwa2006Completed 26 Industrial 17 Interconnection Project SEWASCANUAE Supply and Installation of 132kV Outdoor Terminations2006Completed 25 Wadi Kabir 132kV Subsataion MWEHL&TOman Repair/Replacement of 132kV Cable Joints at Wadi Kabir Substation2006Completed 24 Wadi Kabir 132kV Subsataion MWEHOasisOman Repair/Replacement of 132kV Cable Joints at Wadi Kabir Substation2006Completed 23 Sharq Sohar Steel Plant SSSPL&T Oman Jointing and Termination of 132kV XLPE Cables2006Completed kV Cable Works PDOCIVILCOOman Supervision of laying, Jointing, and Termination of 132kV XLPE Cables2006Completed kV Cable Works PDOAl-HassanOman Supervision of laying, Jointing, and Termination of 132kV XLPE Cables2006Completed kV Cable Works PDO L&T Electromech Oman Supervision of laying, Jointing, and Termination of 132kV XLPE Cables2006Completed 15 Al Taweelah A1 - Repair Works GTTPCN/AUAE Repair/Rehabilitation of 400kV Cable System and associated works2006Completed 18 Hamriyah Power and Desalination Plant SEWAARWAUAE Erection, Testing, and Comissioniong of 220/132kV Substation2006Completed 17 Al Taweelah A1 - Repair Works GTTPCN/AUAE Repair/Rehabilitation of 400kV Cable System and associated works2006Completed 16 Al Taweelah A1 Repair Works GTTPCN/AUAE Repair/Rehabilitation of 400kV Cable System and associated works2006Completed 29

30 No.PROJECT NAMECLIENTCONTRACTORCOUNTRYPROJECT DESCRIPTIONYEARRemarks 1 Installation of 132/33kV Substation at Majaz SEWAARWAUAE Erection, testing, and comissioning of 132/33kV2004Completed 10 Modification of 33kV Swichgear at Jebel Ali E DEWACENTAURUAE Modification of existing 33kV switchgear2005Completed kV Substations at Layah and Sports Center SEWAARWAUAE Upgrade of 132kV GIS at Layah & Sports Center Substations2005Completed 13 Czech Republic SUDKABEL GmBH N/A Czech Republic Termination of 132kV XLPE Cables2005Completed 12 ADDC Contract No. D4227 ADDCN/AUAE Implementation of Under Frequency Load Shedding Scheme at different Substations 2005Completed 11 ADWEA Contract No. N2757 ADWEAAREVAUAE Relocation of 220kV Nobile Substation from Samha to Shamkha2005Completed 9 Trinidad Petrochemical Plant Proman GmbH N/ATRINIDAD Termination of 66kV XLPE Cables2004Completed 8 Kahrama – Qatar KAHRAMA POWER PROJECTS QATAR Jointing of 220kV XLPE Cables2004Completed 7 Kahrama – Qatar KAHRAMA POWER PROJECTS QATAR Termination of 66kV XLPE Cables2004Completed 6 China - Chonqing Project SUDKABEL GmBH N/ACHINA Termination of 110kV XLPE Cables2004Completed 5 Umm Al Nar -132kV Substation ARABIAN POWER CO. ABBUAE Modification works at 132kV Substation2004Completed 4ADWEA - Contract No. N2254 ADWEA ETA/SUDKABE L UAE Supervision of laying, Jointing, and Termination of 132kV XLPE Cables2004Completed 3 Shweihat Water Transmission Scheme ADWEAABBUAE Termination of 33 and 11kV Cables2004Completed 2 Ruwais Unleaded - Gasloine Project TAKREER LAHOUD ENGINEERING UAE Termination of 33 and 11kV Cables2004Completed No.PROJECT NAMECLIENTCONTRACTORCOUNTRYPROJECT DESCRIPTIONYEARRemarks

31 S.N.Equipment DescriptionMake 1Analog Insulation Tester (MI5500E)MegaBras 2Micro OhmMeterIbeko Power AB 3Relay Test Unit (sverker 760)PROGRAMMA 4Test GaugeHaenni 5TXL 870 Utility ProgramaPROGRAMMA 6Torkel 840 Utiltiy ProgramaPROGRAMMA 7DC Power Pack (30A)ANANDHAJOTHI 8Automatic Relay Test SystemARTES 440II 9KOKOS Sherlog Energy Advanced Network Monithor 10EPPE8 KocosKOCUS 11FREEJA-300 Relay testing Kit (w/ 2 test plugs)PROGRAMMA 12Digital Low Resistance Ohmeter (DLRO 10)Megger 13Variable Auto TransformerDIMMERSTAT 14Multi Meter 179FLUKE 15Multi Meter 179FLUKE 16Multi Meter (179)FLUKE 17Multi Meter-ekuu 221 (defective)EKUU 18Multi Meter-MASTECHMS-8213 S.N.Equipment DescriptionMake 19Clamp Meter-CHAUVIN ARNOUX(mini) 20Digital Mini Clamp meter-06 (defective)KYORITSU 21Digital HiTester ( )HIOKI 22Relay Test Unit - Sverker 760PROGRAMMA 23Step Up Transformer - Magnus (up to 2.5kV)PROGRAMMA 24 Primary Current Injection Kit - ODNE-AT with 2 unit PROGRAMMA 25Circuit Breaker Timing Tester -EGILPROGRAMMA 26Clamp meter - Fluke 337FLUKE 27CT Polarity TesterANANDHAJOTHI 28Meggar 5kV - MI-5500EMegaBras 29Timer - TM200GE Energy 30High Voltage Test SetPhoenix Tech. 31Portable Dew Point MeterDILO 32Automatic Capacitance & Tan Delta Test KitMegger 33MultimeterFLUKE 34Monilog Shock Display CurveMONI LOG 35Megger, MIT510 (5kV Insulation Tester)Megger 36Test GaugeWIKA/DILO 31

32 S.N.Equipment DescriptionMake 374 point Earth Tester - EM4055MegaBras 38MIT 510/2 Megger 5kV Insulation TesterMegger 39Motor & Phase Rotation IndicatorFluke 40Lux MeterBeha - Unitest 41Fluke 355 Clamp MeterFluke 42GIS Leek Seeker (CPS Model LS790B)CPS 43Sokkia C330Sokkia 44Sokkia Set520KSokkia 45Automatic Oil Test Set (OTS 100AF/2) AVO International/Megger 46Fluke 87V MultimeterFluke 47MCCT 10 - CT Test SetMegger 48Transformer Winding Resistance Test SetMegger 49Hipot ALT 120/60High Voltage 50VLF 6022CMFHigh Voltage 51Hioiki Clamp On Leak 3283HIOKI 52MMG 10 Sheath TestSEBA KMT 53MVG 5 E Sheat Fault Pre LocatorSEBA KMT 545kV Insulation Tester Megger (MIT 520)Megger S.N.Equipment DescriptionMake 55Capacitor Discharge Tool (60kV)Hastings 56Phase Sequence IndicatorCAMBRIDGE 57Hioiki Clamp On Leak 3283HIOKI 58Fluke 355 Clamp MeterFluke 59Monilog Shock Display CurveMONI LOG 601kV Insulation Tester (MIT 230-EN)Megger 611kV Insulation Tester (MIT 230-EN)Megger 62Fluke 179 MultimeterFLUKE 63SF6 Volume Percentage MeterDILO 64Kyoritzu Mini Clamp Meter ( Model 2006)KYORITSU 65Kyoritzu Mini Clamp Meter ( Model 2006)KYORITSU 66Variable Auto Transformer (1phase 15A) Carroll & Meynell Transformers Ltd. 67Variable Auto Transformer (1phase 8A) Carroll & Meynell Transformers Ltd. 68Hioiki Clamp On Leak 3293HIOKI 69CMC 256plusOMICRON 70 1kV Insulation Tester (MIT 230-EN) Megger 71 Test Plug MMLB01 AREVA 72 PAM 306E Phase Angle Meter PROGRAMMA 32

33 S.N.Equipment DescriptionMake 73 Test Plug MMLB01 AREVA 74 Micro OhmMeter (MOM 600) PROGRAMMA 75 SVERKER 760 PROGRAMMA 76 MEGOHMMETER (5kV Insulation Tester) (C.A6547) CHAUVIN ARNOUX 77Multimeter 117Fluke 78Clamp MeterFluke 79Fluke 87V MultimeterFLUKE 80 Test Plug MMLB07 AREVA 81 Transformer Ohmeter (MT0 210) Megger 82 Fiber optic Arc Fussion Splicer FUJIKURA LTD. 83 Optical Light Source KINGFISHER 84 FO Access Master MT9083A1 (OTDR) ANRITSU 85Test Gauge DILOWIKA/DILO 86Auto TransformerANDELI 87Clamp Meter Fluke 337FLUKE 88Multimeter - FLUKE 177 True RMSFLUKE 89HP Laptop for Testing EquipmentHP 90Phase Sequence IndicatorCAMBRIDGE S.N.Equipment DescriptionMake 91Portable Dew Point MeterDILO 92SF6 Filtering UnitDILO 93Multimeter Fluke 87 VFLUKE 94Omicron CPC 100 with Current BoosterOMICRON 95Digital Earth Tester (DET4TCR2)Megger 96Analog Multimeter Hioki Hioki 97Analog Multimeter Kyoritsu 1108KYORITSU 98Clamp Meter Fluke 337FLUKE R001 SF6 Gas Refilling DeviceDILO 100 BO46R)! Mobile Vacuum pump unitDILO 101 Compressor Unit B020R01DILO 102 Portable Pre-Filter Unit B007R11DILO 103 SK-512.DILO 33

34 34 Date Revised : December 2011 P.O. Box – Abu Dhabi – United Arab Emirates Telephone : – Fax : Website: - Sharjah – United Arab Emirates Website: