1 Composite ARNG Safety Development & Assessment Program (CASDAP)
Information Update Brief Mr. Kenneth Washington (703)

2 Multiple Lines of Unsynchronized Redundant Effort
Focus on problem identification Problem resolution not built into processes Commonalities of overlapping effort Unsynchronized scheduling Time/Resource Intensive for both units and inspectors Heavy disruption of unit OPTEMPO Units subjected to redundant comprehensive inspections Disjointed, unconsolidated data bases of common interest to multiple users Lack consistent interpretation of standards ASAAPS CLRT Aviation Support Activity Accident Prevention Survey Command Logistics Review Team COMET VPP Command Maintenance Evaluation Team IH/OH Voluntary Protection Programs ATAT Industrial Hygiene/ Occupational Health Assessments OIP Aviation Training and Assessment Team Organizational Inspection Programs (Unit Specific)

3 Regulatory Safety Audits
Program Background Regulatory Safety Audits Requirement: AR , DA Pam , and NGR require Ground Safety Assessments and program audits every 36 months Requirement: NGR establishes the Aviation Support Activity Accident Prevention Survey Program (ASAAPS) Facilities shall be subjected to not more than one ASAAPS in a twelve month period and not less than one ASAAPS every three years

4 Existing Program Deficiencies
Program Background Existing Program Deficiencies Aviation Support Activity Accident Prevention Survey Program (ASAAPS): Not funded for 2011 or 2012 Volunteer participation unreliable due to competing priorities Volunteer members required to travel for 5 days Results not standardized Results not analyzed for trend analysis and counter measure development Travel expenses incurred, even if no foundational safety program existed

5 Existing Program Deficiencies
Program Background Existing Program Deficiencies Ground Safety Assessments: Results not analyzed for trend analysis and counter measure development Travel expenses incurred, even if no foundational safety program existed Resistance from State Safety Managers to be assessed by contractors during on-site assessments

6 Composite ARNG Safety Development & Assessment Program
CASDAP: Resolution-focused Composite ARNG Safety Development & Assessment Program Mission Statement: Identify safety system inadequacies through standardized remote assessments, share best practices, assist states in resolving program gaps, thoroughly develop tailored countermeasures, and deliver actionable metrics for AVS resource prioritization in order to proactively resolve program deficiencies to enhance Soldier survivability throughout ARNG formations.

7 Composite ARNG Safety Development & Assessment Program
CASDAP Program Highlights Composite ARNG Safety Development & Assessment Program Launches in Q1FY13 Allows State and Facility Safety Managers to first conduct remote assessments of their own Safety and Occ Health programs, and supports customized follow-on developmental actions (on-line support/on-site coaching) Generates cost savings from reduced travel of large inspection teams, and greater efficiency in unit visits Inspection results are maintained on a server, giving units the ability to self-audit and upload supporting docs SOPs, appointment orders, HAZLOGS, and photographs substantiate requirements typically inspected on site Meets requirements based in AR and NGR 385-series (safety) and AR 40-5 (preventive medicine) regulations, and satisfies NGR (Aviation Support Activity Accident Prevention Survey Program) requirements Users gain access to an online continuity file for inspection programs to include FORSCOM ARMS, range and explosive safety, and SASOHI checklists, and are able to electronically share best practices Expandable to incorporate additional checklists in future updates Enables tailored program development and issue resolution from the ARNG level, helps generate actionable safety metrics and provides benchmark examples to facilitate safety program improvements Detailed video-based users’ tutorials will be distributed to each state safety manager in Q1FY13 https://www.guardsafetyeaudit.org

8 AVS Proactive Safety Management
Synchronized Lines of Effort AVS Proactive Safety Management Risks & Trends holistically assessed to drive funding & Priorities ARNG Organizational Safety Programs ARNG Safety Support Center DA Safety Audits Tailored Countermeasure Development CASDAT-C On-line CASDAT-M On-Site Deficiencies Resolved & Best Practices Delivered to States Combat Readiness Center OIP ATAT COMET CLRT FORSCOM ARMS

9 CASDAP 12 Months 18 Months 36 Months Phase II Phase I Phase III
Composite ARNG Safety Development & Assessment Program All ARNG 12 Months Phase I Local/State Assessment Phase II Development & Remote Phase III On-Site State Safety Office All ARNG 36 Months 18 Months All AASF Other Facilities Selected by CASDAT

10 Remote and On-Site Assistance
CASDAP includes the CASDAT (Composite ARNG Safety Development & Assessment Team) and the SSC (ARNG Safety Support Center). The CASDAT is comprised of the CASDAT-C and the CASDAT-M. CASDAT-C, is a team of contract Subject Matter Experts specializing in ground and aviation safety that provide safety program development through on-line assessments using the eAudit Tool. CASDAT-M, is a team of military SMEs conducting on-site assessments and coaching, following the initial remote phase.

11 Team Specifics CASDAT-C Coordinate integration of the eAudit tool across all states and territories Provide Technical assistance Distribute best practices Identify deficiencies and help develop solutions Provide expertise for countermeasure product development by SSC

12 Team Specifics CASDAT-M Team composition tailored based upon on-line assessment results Augmented by trained SMEs, utilizing Certified Accident Investigators Reduced footprint because 80% of assessment is conducted on-line Reduced on-site presence that is mostly developmental and not assessment focused Augmented by CASDAT-C

13 Sample CASDAP Reporting Metrics
Standardized Reporting Features Sample CASDAP Reporting Metrics 7,924 Hearing Conservation SOPs 1,578 ASO Positions 3,402 ADSNCO Positions 69.92% Qualified MOSQ 45.24% Qualified ADSNCO 84.46% Non-current (5,702 in Final Phase) QUALIFIED 1,204 UNQUALIFIED 374 1,432 1,745 CURRENT 1,458 >2 YEARS (EXPIRED) 5,634 PIPELNE 6,365 NOT SCHEDULED 11,704 Offers comprehensive look across states Provides data to drive resourcing decisions Guides policy updates improve operations

14 Composite ARNG Safety Development & Assessment Team (CASDAT) Remote E-Audit Tool Rollout Plan
What: Comprehensive Web-based Questionnaire (E-Audit Tool) Enables More Efficient Targeted Gap Resolution How: Advance Self-Assessments With Potential Solutions Presented During NGB Onsite Visits Who: Accommodates Air/Ground/Explosives Safety, Occupational Health/Industrial Hygiene Program Stakeholders Cost Benefit Analysis: Within current MDEP budget Compliant with AR and NGR 385-5 Provides metrics to identify problem areas Allows on-site assessment team to be tailored to resolve previously identified issues On-site assessment becomes coaching tool; developmental team arrives with solutions Predictability for states Holistic approach integrates all safety programs Collaborative approach to sharing of best-practices Supports Comprehensive Safety Campaign (FY13) 54 State/Territory E-Audit Self-Assessments Complete (Phase 1) 1 Nov 12 Complete/Launch E-Audit Tool 1 Sep 12 E-Audit is PreRequisite For On-site Visit Identify 12 States for FY13 On-site Visits CofS Launch Endorsement Memo 6 Aug 12 CASDAT brief for ARNG ESAOC 14 Jul 12 Develop CASDAT users guide 27 Jun 12 CASDAT brief for ARNG NOSHC Complete Contract (AVS/CTC ) 27 Jun 12 1 Apr 12 OPTEMPO: All States Complete Annual E-Audit; 12 State Visits/Year Q1FY13 Q2FY13 Q3FY13 Q4FY13 States Conduct E-Audit Assessment/ Site Preparation States Conduct E-Audit Assessment/ Site Preparation States Conduct E-Audit Assessment/ Site Preparation States Conduct E-Audit Assessment/ Site Preparation On-site Visits (3 States) (Follow-up Coaching & Assessment) On-site Visits (3 States) (Follow-up Coaching & Assessment) On-site Visits (3 States) (Follow-up Coaching & Assessment) On-site Visits (3 States) (Follow-up Coaching & Assessment) “STOP THE LOSS”

15 Beta Testing In Progress
E-Audit Tool Progress to Date Beta Testing In Progress 23 May initial beta test; continued testing 13 June through 01 July 2012 Target launch: 1 September 2012 Finalizing Business Practices Enhanced lower level user capabilities to support user friendly interface Limited lower level user capabilities to delete or destroy vital information Added additional roles to accommodate unique organizational structures Help button features: One button, driven by SME, meets all needs with historic archive capabilities; Includes notification Built communications log to show improvement history between users and assessment team Added capability to identify who assigned checklists & how a user is logged in Graphic changes for readability and reporting continuity Add content concerning the

16 E-Audit Tool Roll Out – Answering Questions
E-Audit Tool Screenshots E-Audit Tool Roll Out – Answering Questions Step 1: Answer the question Add content concerning the Step 3: Save your answer. Doing so directs you to upload supporting documents. (button off slide) Step 2: Add supporting notes and comments

17 E-Audit Tool Roll Out – The “Help” Function
E-Audit Tool Screenshots E-Audit Tool Roll Out – The “Help” Function Step 2: Type your question Add content concerning the STEP 3: SME receives request for “Help” Step 1: Click the highlighted text to submit a question

18 E-Audit Tool Roll Out – History log
E-Audit Tool Screenshots E-Audit Tool Roll Out – History log Answer to question shown. Notice when document was attached General information: Who & when Add content concerning the Note: Status – “complete” indicated when document attached Feedback given, hover mouse to read

19 E-Audit Tool Screenshots
File Upload Features

20 E-Audit Tool Screenshots
File Upload Features

21 E-Audit Tool Screenshots
File Upload Features

22 E-Audit Tool Roll Out – Checklist Graphics
Drill-down Capabilities E-Audit Tool Roll Out – Checklist Graphics ASSF #1 within Maine shown. If listed as “Global” - graphic would show national results Add content concerning the Total checklist score calculated Next Steps: Graphic functionality currently built into tool: Visual changes being considered. Graph shows number of aviation questions by tab answered as “Yes” or “No”. If bar not shown, those questions have not yet been answered

23 Chief of Staff Endorsement

24 Composite ARNG Safety Development & Assessment Program (CASDAP)
Information Update Brief Mr. Kenneth Washington (703)


Download ppt "Composite ARNG Safety Development & Assessment Program (CASDAP)"

Similar presentations


Ads by Google