Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGn Closing Report – July ‘05

Similar presentations


Presentation on theme: "TGn Closing Report – July ‘05"— Presentation transcript:

1 TGn Closing Report – July ‘05
doc.: IEEE /0760r0 July 2005 TGn Closing Report – July ‘05 Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Bruce Kraemer, Conexant Bruce Kraemer, Conexant

2 Plans for July Reuse Agenda for January as a place holder for now
doc.: IEEE /0760r0 May 2005 Plans for July Reuse Agenda for January as a place holder for now Which in rough outline form will be: Now to July Update technical proposals posted by 10 days prior to July meeting questions Single Stream adhoc teleconferences every 2 weeks beginning June 6 In Session July 18-22 Proposal presentations Q&A Elimination vote Bruce Kraemer, Conexant Bruce Kraemer, Conexant

3 July 2005 Motion: Moved: Because the TGn selection process allows proposals to ask for time to complete mergers prior to consideration, M&T&W are granted time to complete a merged Joint Proposal (JP) that will replace the current three remaining TGn proposals. The time line is: July 2005: Provide time this week (ref 5557R0 Bruce’s opening report) for these groups to go work on this effort. Sept 2005 JP draft will be provided to TGn; Q&A sessions on JP to that time. November 2005: JP replaces current 3 proposals; Confirmation vote on JP. Vote: 195/2/3 Bruce Kraemer, Conexant

4 X Jul 20 Jul 21 TGn - January Schedule Jul 18 Jul 19 July 2005 Recess
Time Monday Tuesday Wednesday Thursday 8:00-10:00 X Recess 10:30-12:30 1:30-3:30 UCLA Presentation Proposal Updates Single stream CA status Merger Status 4:00-6:00 Opening, Agenda Minutes, CA & SS status Single Stream (if needed) Sept plans Utah Presentation 7:30-9:30 Bruce Kraemer, Conexant

5 Motion on adding FR10 and FR11
July 2005 Motion on adding FR10 and FR11 Motion: adopt new revision of document n-functional-requirements containing the following changes: addition of FR10 and FR11. FR10: Existence of single spatial stream transmission modes Requirement: Proposal shall define single spatial stream transmission modes that provide at least one mode of operation that supports a maximum throughput of at least 50 Mbps in a 20MHz channel as measured at the MAC data SAP. FR11: Interoperability with single spatial stream non AP stations A .11n AP or STA shall interoperate with a single spatial stream entity defined as a non-AP STA that complies with the .11n proposal with the exception of only supporting single spatial stream transmission modes as required by FR10. Vote: 110/0/7 Bruce Kraemer, Conexant

6 September Agenda Plan Between now and September
July 2005 doc.: IEEE /0760r0 July 2005 September Agenda Plan Between now and September No teleconference calls for SS or CA will be needed Partial merged proposal draft posted to server & announced on reflector by Monday Sept 12 Question submission via Thursday Sept 15 Responses will be presented beginning Monday Sept 19 September Meeting Plan (Monday = September 19) Merged proposal Presentation & Discussion Coexistence Assurance status update Review Document linkage for changed FR Formulate and Consider WFA liaison request Bruce Kraemer, Conexant Bruce Kraemer, Conexant

7 Technical Proposal Documents
July 2005 Technical Proposal Documents Submissions r2 Garth Hillman “TGn May Minutes” r2 Single stream ad hoc telecon minutes r5 WWiSE Proposal r0 MitMot Proposal Update Presentation r0 WWiSE Complete Proposal Presentation r5 MITMOT TGn Complete Proposal Detailed Description r7 TGnSync Proposal “PHY results” r13 TGnSync Proposal “Presentation” r7 TGnSync Proposal “Technical Specification” r6 TGnSync Proposal “MAC1 simulation results” r6 TGnSync Proposal “MAC2 simulation results”s r6 TGnSync Proposal “MAC simulation results” r5 TGnSync Proposal “Technical Specification” r7 TGnSync Proposal “MAC Results” r1 Security aspects of MAC aggregation Bruce Kraemer, Conexant

8 New Documents posted during July ’05 meeting
Submissions r0 TGn Sync, WWiSE, MitMot Opening Report r0 TGn Sync, WWiSE, MitMot Closing Report r0 Single Stream ad hoc minutes of July 18 r5 Single Stream ad hoc group r2 Experiments with an 11n radio test bed r1 Soft Detector for n r1 TGn Opening Report r0 TGn July Minutes r0 TGn Closing Report Bruce Kraemer, Conexant

9 July 2005 End of Closing Report Bruce Kraemer, Conexant


Download ppt "TGn Closing Report – July ‘05"

Similar presentations


Ads by Google