Presentation is loading. Please wait.

Presentation is loading. Please wait.

SCHOOL CONSOLIDATION MEETINGS Request for Community Feedback Halifax County Schools.

Similar presentations


Presentation on theme: "SCHOOL CONSOLIDATION MEETINGS Request for Community Feedback Halifax County Schools."— Presentation transcript:

1 SCHOOL CONSOLIDATION MEETINGS Request for Community Feedback Halifax County Schools

2 AGENDA Welcome ~ School Principal or Designee Purpose ~ Ms. Gerry Middleton, Superintendent H.C.S. Facilitator ~ Mr. Charles Chambliss, Asst. Supt. H.C.S. Schedule of Meetings Facility Task Force Plan Update ADM Trend Current K-5 Facility Capacities Consolidation of Savings General School Building Information Options for School Consolidation School District Maps (Mr. Pearson, Director of School Operations) School To School Distance Report Site Visits and Community Feedback

3 School Consolidation Meetings 6:30 – 8:30 p.m. April 7, 2009Brawley Middle School April 21, 2009William R Davie Middle School April 23, 2009Enfield Middle School April 28, 2009Eastman Middle School DATESITE

4

5

6

7

8 ADM Trend School YearADM , , , , , , , , , , , , ,841

9 Attendance Report Sixth School Month: PMR 4 December 19, 2008

10 Attendance Report Seventh School Month: PMR 5 February 4, 2009

11 Attendance Report Seventh School Month: PMR 4 January 3, 2008 ( School Year)

12

13

14

15 Halifax County Schools General School Building Information Brawley Middle School 501 East 16 th Street, Scotland Neck, N. C Music building was built in 1942, consist of 5,729 sq.ft. The roof was replaced in The building is heated and cooled with through the wall electric units. Old high school building was built in 1951 and consist of 14,726 sq.ft. The roof was replaced in Window air conditioners were installed in The boiler is a 1969 cast iron boiler that needs to be replaced. We have already had a pre bid on replacing the heating and cooling for this building and the estimates were $175,000. Gym/Café/Classrooms were built in 1960 and consist of 26,249 sq.ft. The roof was replaced in Window air condition units were installed in the classrooms in The boiler is a 1960 steel 2-pass boiler that is leaking now. Pre bids are out on this boiler replacement at this time. New office building was built in 1990 and consist of 14,688 sq.ft. The building is cooled with a 1991 model chiller and heated with two cast iron boilers, also 1991 models. The roof was replaced in Scotland Neck Primary 901 Junior High School Road, Scotland Neck, N. C Building was completely remodeled in All classrooms have direct access to outside. Has central heating and cooling, city water and sewer, fire alarm system and wired for technology. Hospital and Emergency Medical Service located next to campus.

16 Halifax County Schools General School Building Information Dawson Elementary School 6878 Old 125 Road, Scotland Neck, N. C Building was built in 1957, roof was replace in 1989, and boiler was replaced in Has county water, onsite sewer disposal system and technology wiring. Has four classrooms with direct access to the outside. Needs: Fire alarm system and some floor tile replaced. Building is located in rural area and near emergency services. Pittman Elementary School Hwy 561, Enfield, NC Building was built in 1959, roof was replace in 1995, and boiler was installed in Has county water, onsite sewer disposal system and wired for technology. Needs: Fire alarm system and some floor tile replaced. McIver Elementary School 1064 Bacon Road, Littleton, NC Building was built in , 1963, roof was replaced on primary building in 1995 and office and grammar building in Individual heating/cooling units were installed in Part of the school has a fire alarm system. Needs: a complete fire alarm system and some floor tile replaced. The Town of Littleton is the water and sewer provider. This is one of two elementary schools that have a gymnasium.

17 Halifax County Schools General School Building Information Eastman Middle School Hwy 48, Enfield, NC Office building was built in 1951 and consists of 7,400 sq.ft. The roof was replace in Window air condition units were installed in It is heated with a cast iron boiler that was replaced in The gym was built in 1951 and consists of 10,220 sq.ft. Its roof was replace in It is heated by a boiler installed in 1988 and has no air condition. The floor was replaced in The 600 Building was built in 1959 with 4,794 sq.ft. It is heated and cooled with gas packs, installed in The 700 building was built in 1959 with 13,857 sq.ft. It is heated and cooled with gas packs installed in The 800 building was built in 1955 with 7,812 sq.ft. The roof was replaced in Gas packs installed in Cafeteria was built in 1968 with 6,875 sq.ft. The roof was replaced in It is heated by a boiler installed in It is cooled by a Heat Pump installed in the shop was built in the 70s with 2,764 sq.ft. It is heated and cooled with a gas pack installed in All buildings were wired for technology in 2003.

18 Halifax County Schools General School Building Information William R Davie Middle School 4391 Hwy 158, Roanoke Rapids, NC Built in 1999 consisting of 124,584 sq. ft. Roof renovations in Heat installed as two cast iron boilers and air conditioning installed as two chillers in Inborden Elementary School Hwy 481, Enfield, NC Building was built in 2007 New school – all codes met. Enfield Middle School Hwy 481, Enfield, NC Building was built in New school – all codes met.

19 2009 – 2010 (Year I) McIver (PK-5: 137)TOEveretts (PK-5: 347) and Aurelian Springs (PK-5: 438) Total Everetts Enrollment: 447 Total Aurelian Springs Enrollment: 475 Total Capacity: 528Total Capacity: 576 Brawley (6-8: 203)TOEnfield (6-8: 173) Total Enfield Enrollment: 376 Total Capacity: 432 Eastman (6-8: 218)TODavie (6-8: 345) Total Davie Enrollment: 563 Total Capacity: 912 Options for Consolidation of Schools

20 Options for Consolidation of Schools (3) Options for Consolidation of Schools 2010 – 2011 (Year II): Dawson (PK-5: 220)TOSNP (PK-3: 188) Total Scotland Neck Primary (PK-5) Enrollment: 408 Total Capacity: 336 White Oak (PK: 36)TOHollister (K-5: 238) Total Hollister Enrollment : 274 Total Capacity: – 2012 (Year III): Pittman (PK-5: 205)TOInborden (PK-5: 426) Total Inborden Enrollment: 631 Total Capacity: – 2013 (Year IV): Inborden (PK-5: 631)TOEnfield Middle (6-8: 376) Total Inborden/Enfield Enrollment (PK-8): 1,007 Total Capacity: 1,056

21 NEW BOUNDARY FOR AURELIAN SPRINGS THIS IS A COMBINATION OF THE CURRENT AURELIAN SPINGS AND PARTIAL MCIVER BOUNDARY

22 NEW BOUNDARY FOR AURELIAN SPRINGS SHOWING LOCATION OF STUDENTS

23 NEW BOUNDARY FOR DAWSON & SN PRIMARY THIS IS A COMBINATION OF DAWSON & SN PRIMARY BOUNDARIES

24 NEW BOUNDARY FOR DAWSON – SN PRIMARY SHOWING LOCATION OF STUDENTS

25 NEW BOUNDARY FOR ENFIELD MIDDLE THIS IS A COMBINATION OF BRAWLEY AND ENFIELD MIDDLE BOUNDARIES

26 NEW BOUNDARY FOR ENFIELD MIDDLE SHOWING LOCATION OF STUDENTS

27 NEW BOUNDARY FOR EVERETTS THIS IS A COMBINATION OF THE CURRENT EVERETTS AND PARTIAL MCIVER BOUNDARY

28 NEW BOUNDARY FOR EVERETTS SHOWING LOCATION OF STUDENTS

29 NEW BOUNDARY FOR INBORDEN THIS IS A COMBINATION OF PITTMAN AND INBORDEN BOUNDARIES

30 NEW BOUNDARY FOR INBORDEN ELEMENTARY SHOWING LOCATION OF STUDENTS

31 NEW BOUNDARY FOR WR DAVIE THIS IS A COMBINATION OF EASTMAN AND WR DAVIE BOUNDARIES

32 NEW BOUNDARY FOR WR DAVIE SHOWING LOCATION OF STUDENTS

33

34 School Tour Visits Saturday, April 25, :30 a.m. Brawley to Enfield Middle School (9: :00 a.m.) Saturday, May 2, 2009 – 8:30 a.m. Eastman to William R. Davie Middle School (9: :00 a.m.) Saturday, May 2, 2009 – 1:00 p.m. McIver to Everetts and Aurelian Springs (1:30 – 3:30 p.m.) Halifax County Schools will provide transportation. Pick up time: 8:30 a.m., 8:30 a.m., and 1:00 p.m.

35 Request for Community Feedback A. B.Schools (Suggestions Box) C.Community Centers D.Halifax County Schools Central Office


Download ppt "SCHOOL CONSOLIDATION MEETINGS Request for Community Feedback Halifax County Schools."

Similar presentations


Ads by Google