1 B HARUCH C IVIL E NGINEERS F ORUM Organises A PRESENTATION ON TECHNICAL ISSUES INVOLVED IN WEIR CUM CAUSEWAY ON RIVER NARMADA TO ARREST SALINITY DUE TO BACK (SEA) WATERS and AUGMENTING SURFACE TRANSPORTATION FACILITY BETWEEN BHARUCH & ANKLESHWAR By MK BAROT, Member BCEF Thursday, 17th July, 2003

2 MOTIVES AND OBJECTIVES OF BCEF UNLIKE THE BIG BROTHER ROLE, BCEF AIMS TO EXTEND A HELPING HAND WITH FUTURISTIC VISION TO LOCAL ADMINISTRATION FOR BETTERMENT OF CIVIC LIFE IN THE REGION. TAPPING OF TECHNICAL RESOURCES. TO CREAT ENVIRONMENT CONSCIOUSNESS & QUALITY AWARENESS IN CONSTRUCTION FIELD. TO SET UP RURAL DEVELOPMENT CELL CONDUCTING BRAIN STORMING TECHNICAL SESSIONS

3 MAJOR CAUSE OF CONCERN FOR CITIZENS OF BHARUCH AND ANKLESHWAR NATURES FURY : SALINITY INGRESS – Water-rich region reduced to water-scarce region. WATER WOES : ACTUTE DRINKING WATER PROBLEM. GRINDING HALT : SUDDEN SHUTDOWN OF PLANT. MISSING LINK BETWEEN TWIN CITIES : STRATEGICALLY IMPORTANT CENTURY OLD GOLDEN BRIDGE HAS OUTLIVED ITS USEFUL LIFE.

4 SALINITY : BRUNT OF DOUBLE EDGE SWORD FACED BY THE REGION. MANAGING FINITE SUPPLY OF NATURES BOUNTY : LIMITED INCOMING WATER AFTER UPCOMING OF DAM AND INCREASED RATE OF SALINITY ON ACCOUNT OF GLOBAL GEOLOGICAL CHANGES. AS PER THE INFORMATION COLLECTED FROM CENTRAL WATER COMMISSION OFFICE – RATE OF FLOW IN NARMADA RIVER NEAR GADURESHWAR IS AROUND 180 Cu.M/ Sec. I.e MLD. POUND OF FLESH : RIPEARIAN RIGHTS OF THE REGION TO BE REVIEWED.

5 SWEET WATER REQUIREMENT : 1ANKLESHWAR GIDC100 MLD 2PANOLI GIDC100 MLD 3JHAGADIA GIDC075 MLD 4ANKLESHWAR CITY025 MLD 5BHARUCH CITY035 MLD 6GNFC100 MLD 7NTPC075 MLD 8GPEC075 MLD 9VIDEOCONE075 MLD 10IPCL075 MLD 11BIRLA COPPER075 MLD 12GACL075 MLD 13INDL. AT DAHEJ120 MLD 14TOTAL1000 MLD

6 MISSING LINK : EXISTING CONDITION OF SURFACE TRANSPORTATION BETWEEN TWIN CITIES ? IN HOT WATER ?? 120 YEAR OLD GOLDEN BRIDGE : HIGH TIME TO FIND OUT SUBSTITUTE OF HERITAGE STRUCTURE DUE TO DETRIORATED FOUNDATION CONDITION NEED OF THE DAY : WIDE SPREAD INDUSTRIAL GROWTH RESULTED IN TO INCREASED TRAFFIC VOLUME CALLS FOR A FULL PROOF LINK.

7 A PANEL DISCUSSION ON AUGMENTATION IN CONNECTIVITY BETWEEN BHARUCH & ANKLESHWAR STRENGTHENING OF GOLDEN BRIDGE OR NEW BRIDGE ? Sunday, 30th September, 2001 Organised By BHARUCH CIVIL ENGINEERS FORUM

8 ABSTRACTS OF CONCLUDING REMARKS 120 YEAR OLD GOLDEN BRIDGE TO BE TREATED AS MONUMENT AND SHOULD BE PRESERVED AS HERITAGE STRUCTURE TECHNICAL INVESTIGATION TO BE CARRIED OUT FOR ASCERTAINING THE CONDITION OF BRIDGE FOUNDATION WEIR CUM CAUSEWAY : - TO SOLVE PROBLEM OF POTABLE WATER BY ARRESTING SALINITY DUE TO SEA WATER - TO IMPROVE EXISTING SURFACE TRANSPORTATION FACILITY RIVER SIDE DEVELOPMENT AS A RECREATIONAL SPOT WHICH WILL HELP IN GENERATING FUND FOR PROJECT

9 NECESSITY OF WEIR CUM CAUSEWAY ON RIVER RETIREMENT OF THE CENTURY OLD BRIDGE CATERING THE NEED OF INCREASED TRAFFIC VOLUME TO ARREST THE SALINITY INGRESS IN RIVER WATER DUE TO BACK FLOW FROM SEA CREATION OF SWEET WATER RESERVOIR ESPECIALLY IN VIEW OF THE LIMITED QUANTITY OF INCOMING WATER DUE TO SARDAR SAROVAR PROJECT

10 INTRODUCTION OF WEIR CUM CAUSEWAY WEIR : WEIR IS AN IMPERVIOUS BARRIER ACROSS A RIVER TO RAISE THE WATER LEVEL ON ITS UPSTREAM AND TO ARREST BACKWARD FLOW OF WATER FROM DOWN STREAM CAUSEWAY : A CAUSEWAY IS SMALL SUBMERSIBLE BRIDGE. IT IS ALSO KNOWN AS AN IRISH CAUSEWAY OR DIP TYPES OF CAUSEWAY : 1 LOW LEVEL CAUSEWAY (LLC) - Without Opening 2 HIGH LEVEL CAUSEWAY (HLC) - With Opening

11 REQUISITE CONDITIONS FOR WEIR CUM CAUSEWAY DEPTH OF WATER : SEASONAL FLOW OF WATER SHOULD BE VERY LESS HIGHEST FLOOD DISCHARGE : FLOW IN THE STREAM SHOULD NOT BE FOR MORE THAN 8 TO 10 DAYS IN A YEAR AND FOR ABOUT 4 TO 5 HOURS DURING THESE DAYS NORMAL FLOOD DISCHARGE : IT SHOULD NOT BE MORE THAN 40 % OF HIGHEST FLOOD DISCHARGE

12 SALIENT & BROWNIE POINTS WEIR CUM CAUSEWAY ACROSS RIVER NARMADA + INDUSTRIAL DEVELOPMENT : UNINTRUPETED & SUSTAINED INDUSTRIAL GROWTH. + AGRICULTURAL DEVELOPMENT : OPTIMUM UTILIZATION OF LAND FOR IRRIGATION. + FISHERIES FRIENDLY PROPOSAL : DISCHARGE OF SWEET WATER ON DOWNSTREAM OF WEIR SHALL BE SAME AS EARLIER. + DEVELOPMENT OF BOATING, RECREATIONAL & NAVIGATIONAL FACILITIES

13 ADVANTAGES OF WEIR CUM CAUSEWAY FOREMOST & BEST WAY OF CONSERVATION OF PRECIOUS NATURAL RESOURCE + CAN BE USED AS A MEANS OF SURFACE TRANSPORTATION + ARREST SALINITY DUE TO BACK FLOW FROM SEA WATER + CREATION OF RESERVOIR FOR PRESERVATION OF SWEET WATER + PRESERVATION OF UNDERGROUND (SUB SOIL ) SWEET WATER

14 ADVANTAGES OF WEIR CUM CAUSEWAY RISE OF WATER TABLE OF SURROUNDING REGION WHICH WILL, IN TURN, REDUCE THE PUMPING COST + DEVELOPMENT OF FISHERIES WHICH CAN GENERATE SELF- EMPLOYMENT OPPORTUNITIES + DEVELOPMENT OF BOATING & RECREATIONAL FACILITIES + OPTIMIZATION OF RIPARIAN RIGHTS + CAN BE USED FOR NAVIGATIONAL PURPOSE

15 SPECIFIC ADVANTAGES OF SELECTING SITE OF CAUSEWAY NEAR GOLDEN BRIDGE + ROAD LINK ON BOTH THE ENDS AVAILABLE. + MINIMUM RIVER TRAINING WORKS REQUIRED. + WILL NOT AFFECT FISHERMANS BUSINESS. + SERVES DUAL PURPOSE OF SURFACE TRANSPORTATION AS WELL AS ARRESTS SALINITY + PICKNIC SPOT CAN BE CREATED ADJOING TO GOLDEN BRIDGE : A HERITAGE MONUMENT.

16 SHORTCOMING OF WCC AS COMPARED TO BRIDGE MUCH COSTLIER OPTION (Both Initial Project Cost as well as Maintenance Cost ) RIVER TRAINING WORKS SILTING PROBLEM IN BASIN HIGH COST OF DREDGING HIGH MAINTENANCE COST DUE TO LIKELY DAMAGES DURING FLOODS

17

18

19

20

21 SERVICES RENDERED BY : CONSTRUCTION AGENCY : M/s LARSEN & TOUBRO LIMITED ECC CONSTRUCTION GROUP DESIGN CONSULTANT : M/s MULTI MEDIA CONSULTANT PROJECT MANAGEMENT CONSULTANT : M/s DALAL CONSULTANT PROJECT ENGINEER - IN- CHARGE : Mr. PC SHAH, CITY ENGINEER, SMC OVERALL COORDINATION : HAJIRA AREA INDUSTRIES ASSOCIATION

22 TECHNICAL PROFILE OF WCC at SURAT LENGTH OF THE WEIR ( The Portion Without Gate & With Gate ) In all 580 Meters 2WIDTH OF THE CREST 10 Meters having 6 Meters RL 3FRL( Up to the top of the gate )5 Meters 4WATER STORAGE CAPACITY 310 Lacs Cubicmeters i.e Million gallons 5 GATES ( SEAL LEVEL ) - SELF OPERATIVE150 Meters Length Such 16 Nos. 6FLOOD GATES AT BOTH ENDS 10 x 5.2 Meters each of 14 Meter Height 7RL OF RIVERBED( - ) 1.9 Meters

23 TECHNICAL PROFILE OF WCC at SURAT- 2 8DESIGNED DISCHARGE24000 Cusec 9LENGTH OF RESERVOIR 30 Kms. Area : 18 Square Kms 10 CAUSEWAY DIMENSIONS Total Top Width - 10 Meter 3.5 Meter Wide x 2 Lanes 11 FOOTPATH DIVIDER/CURB 1 x 1.80 Meter 1.20 Meter 12CONSUMPTION OF CEMENT- CONCRETE86,000 Cubic Meters 13CONSUMPTION OF CEMENT 6,24,000 Bags i.e. 31,200 MTs 14CONSUMPTION OF STEEL1100 MTs

24 TECHNICAL PROFILE OF WCC at SURAT PROTECTION WORKS APRON BLOCK x 1.5 x 0.9 Meter size 7300 Nos. of 5 MT weight each 16RIPARIAN RIGHT OF SMC300 Cusec 17TOTAL COST OF LIGHTING & ILLUMINATIONRs. 16 Lacs 18CAUSEWAY UTILIZATION PERIOD More than 10 Months in a year 19TOP LEVEL OF CAUSEWAY6.00 RL 20TOP RL OF HIGH TIDE LEVEL4.00 RL 21TOP RESERVOIR LEVEL5.00 RL

25 FAVOURABLE CONDITIONS FOR CONCEIVING SURAT PROJECT 1 ACUTE SHORTAGE OF WATER FOR CATERING THE NEEDS OF SURAT CITY 2 HIGHLY DEVELOPED INDUSTRIAL ZONE WHICH CALLS FOR RELIABLE & PERENNIAL WATER SUPPLY 3 DRAWING OF WATER FROM UKAI / KAKARAPAR CANAL - HIGHLY COSTLY AFFAIR 4 TOTAL WATER SUPPLY DISRUPTED DURING CANAL MAINTENANCE WORK EVERY YEAR 5 TOPOGRAPHY AND SUBSOIL CONDITIONS 6 HIGH & FIRM EMBANKMENTS WITH MINIMUM BED WIDTH OF RIVER SECTION

26 MAJOR CONTRIBUTING INDUSTRIAL GIANTS RELIANCE INDUSTRIES LTD ESSAR GUJARAT LIMITED NATIONAL THERMAL POWER CORPORATION LTD. OIL & NATURAL GAS COMMISSION INDIAN OIL CORPORATION RAMA NEWS PRINT & PAPER LIMITED GUJARAT INDUSTRIAL DEVELOPMENT CORPORATION CYANIDES & CHEMICALS COMPANY LARSEN & TOUBRO LIMITED GAS AUTHORITY OF INDIA LIMITED

27 THE GOVERNING FACTORS FOR COST ECONOMICS AND FUND RAISING FOR IMPLEMENTATION OF WCC PROJECT ON RIVER NARMADA LENGTH OF CAUSEWAY : Approx Meters ( 580 Meters) ESTIMATED COST: Approx. 125 Crores ( 35 Crores ) FUND RAISING : Contribution is expected from approx. 5-7 major Industrial sectors (10 mega Industrial units ) Like GNFC, IPCL, ONGC, GIDC, NTPC, Torrent, Birla Copper ALMOST EVERY INDUSTRY HAS THEIR PERMANENT WATER SUPPLY SCHEME ON NARMADA RIVER ITSELF THE TOP PRIORITY OF OUR PROJECT IS SURFACE TRANSPORTATION AS WELL AS PRESERVATION OF SWEET WATER.

28 RAISING OF FUND FOR CIVIC PROJECT 1)ISSUE OF NON CONVERTIBLE BONDS JOINTLY BY LOCAL CIVIC BODY AND FORMING – " BHARUCH –ANKLESHWAR DEVELOPMENT BOARD" 2)GOVERNMENT SHOULD OWN THE PROJECT AND EXECUTE WITH EITHER WITH THE HELP FROM WORLD BANK OR ON BOT BASIS 3)CONTRIBUTION FROM THE INDUSTRIES LOCATED IN THE REGION 4)DEVELOPMENT OF RIVER SIDE BANKS AS A PICNIC SPOT 5)REVENUE TO BE GENERATED FROM FISHERIES BUSINESS

29 SALIENT FEATURES OF NCB ISSUED BY AHMEDABAD MUNICIPAL CORPORATION FOR RAISING OF FUND FOR CIVIC PROJECT A)NON CONVERTIBLE BONDS ISSUED IN THE Y EAR Fund Raised : Rs. 100 Crores. Duration : 7 Years Nature of Bond : Public Bond. Rate of Interest : 14 %. B)TAX FREE NON CONVERTIBLE BONDS TO BE ISSUED IN MARCH Fund to be Raised : Rs. 100 Crores. Duration : 10 Years. Nature of Bond : Premium Tax Free & shall be open to only Selected Financial Institutions. Price of the Bond : Rs. 1.0 lac per Bond. Rate of Interest : 9.09 %. Status of Bond : Prerequisite clearance for NCB has been acquired from Central as well as State Government. Purpose : Finance generated by the bond would be used for projects like bridges, fly overs, water supply & sewerage, roads etc.