Presentation is loading. Please wait.

Presentation is loading. Please wait.

Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Similar presentations


Presentation on theme: "Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012."— Presentation transcript:

1 Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012

2 Woodbridge High School Site Plan Concept A

3 Woodbridge High School DD Plan Ground FloorGround Floor Design Development

4 Woodbridge High School DD Plan Second FloorSecond Floor Design Development

5 Woodbridge High School The following series of images are intended to indicate the level of detail associated with current Design Development plans. We have only presented a small portion of the design sheets. Design Development

6 Woodbridge High School Design Development

7 Woodbridge High School Design Development

8 Woodbridge High School Design Development

9 Woodbridge High School Design Development

10 Woodbridge High School Design Development

11 Woodbridge High School Design Development

12 Woodbridge High School Design Development

13 Woodbridge High School Design Development

14 Woodbridge High School The project is being designed using Building Information Modeling – BIM Considered next generation of Auto-CadConsidered next generation of Auto-Cad 3D virtual building – allows clash detection of trades on paper prior to construction3D virtual building – allows clash detection of trades on paper prior to construction Clash detection resolution prior to construction reduces potential for change- ordersClash detection resolution prior to construction reduces potential for change- orders Design Development

15 becomes The following series of images show some of the detail associated with BIM – virtual 3D designs Design Development

16 Woodbridge High School Design Development

17 Woodbridge High School Design Development

18 Woodbridge High School Design Development

19 Woodbridge High School Woodbridge School District Project Cost Summary – up-dated Building Construction Costs $ 46,597,632 Design & Consulting Fees $ 2,659,269 State, County, Local & Agency Fees $ 1,155,895 FF&E & Technology Equipment $ 1,970,000 Subtotal $ 52,382,795 Total Project Costs $ 52,382,795 Woodbridge School District Budget $ 52,539,700 Total Amount Under / (Over) Budget $ 156,905 Proposed Add Alternates $ 3,000,000 May 22, 2012

20 Woodbridge High School Woodbridge School District Project Schedule Space programming09/22/11 – 11/16/11 Schematic Designs (30%)11/11/11 – 01/17/12 Design Development (60%)12/19/11 – 04/23/12 Construction Documents03/22/12 – 08/23/12 Bid Pack A (Site Concrete & Steel)8/20/12 Bid Pack B (Building & Systems)10/03/12 Funding available $10.5 m 10/2011 (FY-12) Funding available$21.0 m 10/2012 (FY-13) Funding available$21.0 m 10/2013 (FY-14) 3/29/12 On sched. On Schedule 12/11

21 Woodbridge High School Recommend the Woodbridge Board of Education approve for continued design progression, the design development documents, budget and schedule Thank you! Questions and Answers


Download ppt "Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012."

Similar presentations


Ads by Google