1 WATER TREATMENT ENGINEERS AND CONTRACTORS

2 Naston Engineering Nigeria Ltd. is a leading indigenous engineering and contracting company in the field of water and wastewater treatment systems, sewage treatment, bulk and domestic metering systems, tank fabrication and pumping systems. The company's unique range of different technologies come from her research and development centres, constant liaison with world leaders in engineering and ensures that our clients (which includes private companies, municipalities, governments, and international organizations ) receive the most innovative and effective technological solutions. With several years of experience, we are able to draw upon an unsurpassed knowledge of traditional and innovative solutions in order to meet the demands of both industrial and municipal client. We have executed projects for many states and the federal government and have participated in a number of local and internationally funded projects and are conversant with international procurement Procedures. 2

3 Our mission is to transform lives by providing systems that adhere to international standards. The management and staff of Naston (of more than 60 employees) are committed to ethical business practices and professional conduct. The company led by professional engineers with more than 20 years of combined experience in the field of waste management, industrial waste water management, operation and maintenance management, turnkey projects, process reengineering, health and safety management and cost reduction program. 3

4 Naston Engineering's services include: Feasibility studies, Procurements and Supply of equipment, Construction of water treatment plant (Fabrication, Installation &Erection), Geo-physical services and Drilling of boreholes, Project Management, Operation and Management of Plants, Metering (Bulk and Domestic), Commissioning of Plants and Equipments, After-sales service maintenance, Plant monitoring and staff training, Rehabilitation and upgrading of Waterworks for public and private sectors, We operate a standard laboratory equipped with modern equipments to carry out water Analyses. 4

5 We also offer engineering Services in the following areas: Packaged Water Treatment Plants, utilizing raw water from boreholes or Rivers to produce potable water, Municipal Water Schemes for Township and Urban centre, Supply and Installation of Metering devices, including Pre-paid meters, Domestic Meters, Nodal Flow Meters, etc. Sewage Treatment Plants for small communities as well as more elaborate schemes for larger communities. 5

6 We promote world class metering solution for both Nodal and Domestic metering. These meters are fully Electronic, intelligent thus offering exceptional features such as: 6 Exceptional Accuracy, Durability, Reliability/Sustainability, Maintenance Free, and Good Security.

7 VISUAL DISPLAY OF REMOTE METER READING FROM ONE OF THE INSTALLED ELECTROMAGNETIC FLOW METER 7

8 Procurement and Installation of Prepayment Water Meters in Gwarinpa II Housing Estate Client:FCT, Abuja Financier: World Bank Date of Award:July, 2009, Status:Completed. Value: N60Million 8 The Scope of the Project Includes: Procurement of 1000units of Fully Electronic Domestic Prepaid Water Meters Installation of Fully Electronic Domestic Prepaid Water Meters Including Testing and Commissioning

9 Construction of Otta-Ikosi 4MGD Regional Water Supply Scheme and pipeline Reticulation. Client:Lagos State Financier: Lagos State Date of Award:17 th Dec, 2008, Status:70% completed Value: N4.37Billion 9 The Scope of the Project Includes: Construction of River Intake, Construction of Head-Works & Ancillaries - Pumps Ranging from 25Kw to 75Kw Construction 2 Booster Pumping Stations at Agbowa and Imota,

10 10 Laying of 40km of DI Pipe for Transmission Mains - Pipes ranging from 80mm to 500mm of DI Pipe Laying of over 40km of PVC Pipe for Reticulation in 13 communities - Pipes ranging from 63mm to 315mm of PVC Pipe, Laying of Service Mains Supply and Installation of Motor Control Panel (MCC) with Soft Starters Supply and installation of Telemetry SCADA Equipment and other works Supply and Installation of 16Nos Galvanized Pressed Steel bolted Panel Tanks of different sizes- 8,400m 3 Cumulative Capacity.

11 Construction of 4MGD Otta-Ikosi Regional Water supply Schemes (Additional works- Extension To Ikorodu) Client:Lagos State Financier:Lagos State Date of Award: 18 th April, 2011 Status:` In progress. Value: N2.3Billion 11 The Scope of the Project Includes: Construction of booster Station at Isiu, Supply and Installation of 3Nos 750m 3 Galvanized Pressed Steel bolted Panel Tanks on 18m Tower at Isiu and Ikorodu. Supply and installation of 15km of DI pipes ( 400mm & 500mm) including fittings and accessories.

12 12 The Scope of the Project Include: Refurbishment of Raw water intake station & Floating pontoon Supply and installation of Raw water Submersible Pumps Overhauling/Refurbishment of Pumping Station Equipment: Clear water pumps, Compressors, blowers, dosing equipment, MCC Panels etc Refurbishment of Filtration Systems Including Installation of New Instrument and Control Systems Refurbishment and Improvement to Control Room and PLC (Programmable Logic Controllers Replacement of chemical dosing pumps, Mixers and dosing pipelines Improvement to office, security lightings and small power distribution Rehabilitation of 4MGD Ishasi Waterworks Client: Lagos State Financier:World Bank Date of Award:24 th Jun, Status:` In progress. Value: N745.9Million Newly Awarded

13 Construction of Water supply schemes at Murtala Muhammed International Airport, Ikeja. Client: FAAN Financier: Fed. Govt. of Nig. Date of Award: 14 th Oct Status:80% Completed Value: N290Million 13 The Scope of the Project Include: Upgrading of the plant from 200m 3 /day to 400m 3 /day, Construction of 3nos 250mm Borehole, Installation of Pump galleries (between 15Hp to 30Hp Pumps), Supply and Installation of Diesel/Electric Fire Hydrant Pump set Supply and Installation of Motor Control Panel (MCC) with Soft Starters, Supply and Installation of Standard Laboratory Equipments, Etc….

14 Construction of 4Nos 2Million Gallon Per Day Mini Waterworks at: 1.Magodo, 2.Epe-Agric, 3.Ajangbadi and 4.Isheri-Oshun in Lagos State. Client:Lagos State Financier:Lagos State Date of Award:21 st Apr, 2008 Status:Completed Value:N 1.9Billion Completion Period:6 Months 14

15 Scope of Works of Each of the 4 Sites: Drilling of 4Nos Deep Boreholes, Booster Pumping System Installed, Aeration/Sedimentation Tank Fabricated and Installed, Filtration System- 4 pressure filters of 3m and 3m height, Clear Water Tank (1,000m 3 ) Fabricated and Installed, Elevated Tank (225m 3 ) Fabricated and Installed, Power Generation System, Operations Building, 5km of Distribution Pipeline of different sizes ( 110mm to 315mm). Installation of MCC Control Panel Etc. 15

16 Upgrade of Water Treatment Plant at United State of America Consulate, Lagos Nigeria. Client: US Consulate Financier: United State of America Date of Award:21 st Aug Status:Completed Value: N38.5Million 16 The Scope of the Project Includes: Upgrading of the plant from 12m 3 /hr to 18m 3 /hr, Supply and installation of 10hp Submersible pump, Construction of 18m 3 /hr Water Treatment Plant Comprising: Aeration & Sedimentation tank: 4.8mL X 2.5mW X 1.5mH Supply and Installation 3kw Filter pumps and 4kW Transfer pumps Supply and Installation Pressure Filters Supply and Installation 3kW Air blower Supply and Installation Dosing Equipment Supply and Installation of Motor Control Panel (MCC) with Soft Starters, Picture not Available

17 Overhauling/Upgrading of the FCT Water Boards Pumping Stations. Client:FCT, Abuja Financier: Fed. Govt. of Nig. Date of Award:8 th Sept, Status:Completed Value: N428.9Million 17 The Scope of the Project Include: Pump and Power Upgrade of 11 Stations Rehabilitation and Complete overhauling of the Electromechanical Equipments of the Booster Pumping Station, Supply and Installation of Pumps Ranging from 11Kw to 30Kw, Supply and Installation of Electricity Generating Set, Installation of Bulk Flow Meter

18 Rehabilitation of Lower Usuma Dam Water Treatment Plant (Phase 1) Client:FCT, Abuja Financier: Fed. Govt. of Nig Date of Award:8th Sept, 2008, Status:Completed. Value: N245. 8Million 18 The Scope of the Project Includes: Replacement of the Emergency De-silting Gate of the Dam at a Depth of 60m, Rehabilitation of the Phase 1 LUD Water Treatment Plant, Rehabilitation of The Intake Tower, Supply and Installation of Electromechanical Equipments (Electric Flow Meters, Compressor, etc. Supply and Installation of Chlorinator (Pre and Post Chlorinator ; up to 20Kg/h), And many more..

19 Construction Works for the Extension and Rehabilitation of Karu/Nyanya Water Distribution Network. Client:FCT, Abuja Financier:World Bank Date of Award:7th Oct Status: Completed. Value: N599.9Million 19 The Scope of the Project Include: Laying of over 40Km of PVC and Ductile Iron for Transmission and Distribution Pipeline Network

20 Emergency Rehabilitation of Nsukka Water Supply System Client: Enugu State Financier: World Bank Date of Award:10 th Oct Status:Completed Value: N182Million 20 The Scope of the Project Include: Drilling of 350mm Borehole, Rehabilitation of 4Nos Existing Borehole, Supply and Installation of Clear Water Pumps Rehabilitation of Treatment Plant and Installation of Dosing Equipments, Rehabilitation of Operational Building and Treatment Plant Building, Laying of 22Km of Distribution Pipeline Network..

21 Supply of Vertical Driven Pumps for Ajalli-Owa Head works. Client:Enugu State Financier: World Bank Date of Award:10 th Oct Status:Completed Value: N102.4Million 21 The Scope of the Project Includes: Procurement of 4Nos Vertical Line Driven Pumps for Raw Water (580m 3 Procurement of 4Nos Vertical Line Driven Pumps for Clear Water (1070m 3

22 Replacement of the Electrical Panels for the New Ajalli-Owa Intake and High lift pumps Client:Enugu State Financier: World Bank Date of Award:3 rd July, 2009 Status:Completed Value: N101.3Million 22 The Scope of the Project Includes: Supply and Installation of Motor Control Panel (MCC) with Soft Starters for Intake Station, Supply and Installation of Motor Control Panel (MCC) with Soft Starters for High Lift Station Supply of Spare Parts.

23 Rehabilitation of Enugu Metropolis Water Distribution Network. (Lot 1) Client:Enugu State Financier: World Bank Date of Award:23 rd Jan Status:Completed Value: N136.9Million 23 The Scope of the Project Includes: Procurement of 300mm and 450mm Ductile Iron Pipes Procurement of 100mm and 200mm UPVC Pipes Laying of Pipes in a densely Built up Area Reclaimation of Right of Ways by Relocating Utilities such as Underground Electrical Cables, Telecoms Cable, Transformer etc., Rehabilitation of Lower Ogui Road Pipe Reticulation of 4km Pipe Line, Reconnection of New Pipe Network With Supply Mains, Testing, Flushing and Chlorination of New Pipeline,

24 Rehabilitation of Enugu Metropolis Water Distribution Network. (Lot 2) Client:Enugu State Financier: World Bank Date of Award: 23 rd Jan Status:Completed Value: N139.3Million 24 The Scope of the Project Includes: Procurement of 300mm and 450mm Ductile Iron Pipes Procurement of 100mm and 200mm UPVC Pipes Laying of Pipes in a densely Built up Area Reclamation of Right of Ways by Relocating Utilities such as Underground Electrical Cables, Telecoms Cable, Transformer etc., Reconnection of New Pipe Network With Supply Mains, Testing, Flushing and Chlorination of New Pipeline,

25 25 Ikoyi Hotel Redevelopment - Borehole/Water Treatment and Sewage Treatment Plant Installation Client:Ikoyi Hotel Ltd. Financier: Beta Consurtium Date of Award:24 th Jul Status:Completed Value: N44.9 Million

26 Rehabilitation and Upgrade of Ose-Owo Water Supply Scheme. Client:Ondo State Financier:Ondo State Date of Award:14 th Oct Status:In progress Value: N1.4Billion 26 The Scope of the Project Includes: De-silting (Dredging) of the fully silted Ose dam reservoir. Improvement of the treatment and production capacity of the Treatment plant Improvement on the water supply to the catchments area via – Installation of new Transmission and distribution pipelines (16.7Km 300mm Steel Pipeline of Transmission Main).

27 Rehabilitation and Upgrade of Ose-Owo Water Supply Scheme. (continue ) 27 The Scope of the Project Includes: De-silting (Dredging) of the fully silted Ose dam reservoir. Improvement of the treatment and production capacity of the Treatment plant Improvement on the water supply to the catchments area via – Installation of new Transmission and distribution pipelines (16.7Km 300mm Steel Pipeline of Transmission Main).

28 28 Rehabilitation and Upgrade of Awara Water Supply Scheme. Client:Ondo State Financier:Ondo State Date of Award:14 th Oct Status:In progress Value: N988.7Million The Scope of the Project Includes: Upgrade of the treatment and production capacity of the plant Salvaging of abandoned pressure filtration accessories and Completion of the abandoned pressure filtration system. Upgrade of The Water Supply to The Catchment Area via – Installation New Transmission And Distribution (HDPE) Pipelines

29 Construction of 50M 3 /hr Augmentation Water Treatment Plant at Ido-Ani. Client:Ondo State Financier:Ondo State Date of Award:3 rd Dec, 2010 Status:In progress Value: N117.5 Million 29

30 30 Construction of Re-designed Intake/ Rehabilitation of Existing intake structure at Oke-Igbo Water Scheme. Client:Ondo State Financier:Ondo State Date of Award:24 th Dec Status:In progress Value: N42 Million

31 Rehabilitation of Ife-Odan Water supply scheme. (EU Financed) Client:Osun State Financier: European Union Date of Award:9th Mar Status:In progress Value: N48 Million 31 Rehabilitation of Lower Usuma Dam Embarkment. (Landscaping) Client:FCT, Abuja Financier: Fed. Govt. of Nig Date of Award:30th Nov Status:60% Completed Value: N19.9Million

32 1Rehabilitation and Expansion of Onikan Water Works (WORLD BANK PROJECT) Onikan, LagosLagos State Govt.World BankCompletedN 79.6M 2Rehabilitation of V.I Annex, Eredo, Ota-Ikosi and Agege Micro Waterworks LagosLagos State Govt. CompletedN 506.7M 3Construction of 1.25MGD Water Treatment Plant, Supply and Installation of Fire Pump Set and Provision of External Water Distribution System at 1004 Estates Redevelopment, Victoria Island, Lagos Victoria Island, Lagos UACN Property Development Company plc. CompletedN 90.5M 4Water Supply Project at Ojo and Epe Campuses, Lagos State University LagosLagos State Govt. CompletedN 525.3M 5Design, Fabrication and Installation of 75m3/hr Water Supply System and Pipeline. Management of the water energy services at Palm Springs Residences & Resorts, Lekki, Lagos LagosArtee Group Nig. Ltd. CompletedN 111.0M 6Ijora Badiya Micro WaterworksLagosLagos State Govt. CompletedN169.0M 7Federal Rural Water Supply, Ikorodu, LagosLagosFederal Ministry of Water Resources CompletedN13.6M 8Design, Supply & Installation of 50m 3 Water Treatment Plant at Nicon Town, Lagos LagosChevron Employees Coop Thrift & Credit Society Ltd CompletedN54.5M 9Drilling of 6 Borehole, Installation of 3m 3 /hr Water Treatment Plant, Provision of High Lift Pumps, Welding & Fabrication of Steel Water Storage Tank at Banana Island, Private Development, Ikoyi, Lagos LagosBusiness Contracting Limited CompletedN9.85M 32

33 10Laying of Water Pipeline Reticulation for Oworonsoki, Otto-Awori and Ijora Badia LagosLagos State Govt. CompletedN 288.2M 11Iwaya Micro Water Works – 1 Million Gallon Per Day LagosLagos State Govt. CompletedN 162.0M 12Otto-Awori Micro Water Works – 1 Million Gallons per Day LagosLagos State Govt. CompletedN 229.0M 13Oworonshoki Micro Water Works – 1 Million Gallons Per Day LagosLagos State Govt. CompletedN 229.0M 14Ijora Badia Micro Water Works – 1 Million Gallons Per Day LagosLagos State Govt. CompletedN 229.0M 15Onikan Micro Water Works – 1 Million Gallons per Day LagosLagos State Govt. CompletedN 229.0M 16Rehabilitation of Owena Water Treatment Plant OwenaOndo State Govt. CompletedN 15.0M 17Drilling of 2 Boreholes, Reticulation, Rehabilitation of Gent Sets and Storage Tanks at University of Abuja. AbujaUniversity of Abuja CompletedN 7.5M 18And many more projectsAcross Nigeria Private, Companies, Governments and International Bodies Completed And On-Going 33

34 34 We have presented our capability and experience in executing projects of various sizes and complexity in the water industry and we are roaring to do more…

35 35 LAGOS OFFICE ADDRESS WATER HOUSE, IPONRI 1, AFRIC ROAD, OFF FUNSHO WILLIAMS AVENUE, IPONRI LAGOS ABUJA OFFICE ADDRESS 3, GOBA STREET, OFF MONROVIA STREET AMINU KANO CRESENT, WUSE II, ABUJA. TELEPHONE: , AKURE OFFICE ADDRESS 22, IKALE STREET, IJAPO ESTATE AKURE, ONDO STATE.