Presentation is loading. Please wait.

Presentation is loading. Please wait.

Forest Service and A/E Services David Culp, RA, LEED AP Regional Architect Southern Region.

Similar presentations


Presentation on theme: "Forest Service and A/E Services David Culp, RA, LEED AP Regional Architect Southern Region."— Presentation transcript:

1 Forest Service and A/E Services David Culp, RA, LEED AP Regional Architect Southern Region

2 T HE N ATIONAL F OREST S YSTEM

3 F OREST S ERVICE O RGANIZATION Forest Service National Forest System Research State & Private Forestry

4 T HE W EEKS A CT OF 1911

5 T HE S OUTHERN R EGION

6 NFS O RGANIZATION Chief Forester of the United States Regional Forester Forest Supervisor District Ranger National Forest System Region Forest District Staff

7 V ISITING THE N ATIONAL F ORESTS

8 T HE A DMINISTRATIVE S ITE

9 U NDER C ONSTRUCTION T EXAS SO

10 W ORK C ENTERS

11 T HE O VERLOOK AND I NTERPRETIVE S ITE

12 W AYAH B ALD L OOKOUT T OWER

13 T HE C AMPGROUND

14 T OILET B UILDINGS

15 R ECREATION C ONSTRUCTION Currently advertized, this project is to demolish two existing buildings and existing site construction and to construct a new combined toilet and concession building and new plaza at Brasstown Bald, Chattahoochee-Oconee National Forests near Blairsville, GA

16 L AKE W INFIELD S COTT

17

18 T HE B UILT E NVIRONMENT I MAGE G UIDE

19 LEED-NC P ROJECTS COMPLETE UNDER CONSTRUCTION PLANNED R8 SRS

20 S USTAINABLE C ONSTRUCTION : N OW AND F UTURE

21 Joint Venture between USGBC, ASHRAE, and IESNA Alternative Compliance Path for the new IGCC Written in enforceable code language Overlay to existing building codes (IBC, IPC, IMC, IFGC, IFC) and ASHRAE 90.1 G REEN B UILDING C ODES : ASHRAE

22 Projects Funded through Normal Appropriations Facility Construction Facility & Site Maintenance Road Maintenance Bridge Maintenance and Construction Environmental Remediation Appropriations are subject to the will of Congress C ONSTRUCTION & M AINTENANCE P ROJECT T YPES

23 B ROOKS A CT P ROCEDURES –C ONTRACTS Receive Qualifications Eliminate Non-responsive Rate FirmsRank Firms Interview FirmsRate FirmsRank Firms All Firms Top-Ranked Firms in Each Category (Min. 3) Negotiate PricingAward Contract Top-Ranked Firms in Each Category (Max. 3)

24 B ROOKS A CT P ROCEDURES –T ASK O RDERS Consult qualifications on file with FS Issue RFP to most qualified Negotiate Pricing Award Fee < $150,000: Fee $150,000 Issue RFP to all firms for qualifications Request Pricing from most qualified firm Negotiate Pricing Award

25 Maximum Design Fee of 6% of the Governments Estimated Cost of Construction Does not include Planning, Pre-design, Investigative, or Construction Services B ROOKS A CT F EE L IMITATION

26 Forest Service and A/E Services Questions and Answer Session


Download ppt "Forest Service and A/E Services David Culp, RA, LEED AP Regional Architect Southern Region."

Similar presentations


Ads by Google