2 Company History Established as a company incorporated under Companies Act 1956 in FY 2008 engaged in construction of infrastructure in India. A part of Arham Group, mainly trading in Iron and Steel, recognized the opportunity in infrastructure construction. Integrated group of technocrats, engineers and project specialists involved in construction of highways, bridges, hydro power projects, metro rail projects, residential complexes and refineries. Has completed projects costing over INR 750 millions. An ISO company, associated with leading infrastructure companies like GVK, L&T, IJM and IL&FS for enhanced expertise. Arham Group has commitment to quality of service, safety, community welfare and environmental protection. 2

3 Strengths Accreditation by ISO 9001:2008 certified by KVQA Certification Services Pvt Ltd. Footprint in states of Andhra Pradesh, Madhya Pradesh, Rajasthan, Delhi, Haryana and Uttarakhand. Follow stringent procedures and measures to maintain quality, time schedule and safety. Management team with greater vision and capability. Execution Staff with relevant experience. Association with leading construction companies to increase expertise, experience and knowledge base. Generation of repeated business with GVK, IL&FS and L&T ECC. Ability to optimize resources at various locations. 3

4 Mission Statement Vision To be a significant contributor to infrastructural values. Mission To build clean and environmental friendly infrastructure for expressways, metro rail, industrial and residential complexes. Our Commitment to Stakeholders Customers- To provide quality service within stipulated time frame at a cost effective rate Employees-To provide a safe and stable work environment with career growth opportunities that recognize technical excellence and exceptional client service EnvironmentRespecting law of state Following ethical business practices Providing support for improving communities 4

5 Safety Policy While Arham Infrabuild Ltd has urbanized an enviable reputation for building landmark complexes and world class infrastructure, we always remember the fact these are made possible by a large pool of enormously hard working and committed workforce. All team members have responsibilities towards one and all as below : Company Management Has overall responsibility for the companys safety program and regularly reaffirms support for loss control activities. Insures that all employees are informed of top managements commitment to safety and the abidance of all federal, state, and local regulations. Supervisors / Foremen Responsible for the safety of their employees and oversee the compliance with the safety program and applicable state, federal, and local regulations. Arranges for prompt medical attention in case of an injury and provides a through written investigative report with recommendations to prevent a reoccurrence. Minimize equipment damage. Employees Responsible for learning and abiding by the rules and regulations which are applicable to their assigned tasks. To report all accidents and near-misses. Perform their functions in the safest possible manner and encourage co-workers to do likewise. 5

6 Project Portfolio Our Project Portfolio covers all the stages of construction projects and include the following : Viaduct for Elevated Metro including Pile caps, Pier, Pier Cap, Portal, Soldier Pile and Elevated Metro Station. Fabrication of girders for flyovers, ROB and CLCs. Infrastructure and bridges construction for Four-Lane and Six-Lane Expressway Projects including ROB, CUP, VUP, minor bridges and flyovers. Hydro-power Projects (Power House, Switch Yard, Power Channel, Forebay water body and other related civil structures). Renting heavy construction equipment like Hydra, TM, Dumpers and Excavators. We ensure high quality of service with a well structured escalation matrix that maps into high level of skills and experience ensuring handling of incidences efficiently and effectively. 6

7 The Leadership Mrs. Anu Parakh - Managing Director of the Arham Group, is a first generation entrepreneur with interest in Iron and Steel trading and having gained experience in the field of construction. Mr Taj Parakh - Director, credited for steering the Company to execute projects worth Rs 750 million in span of four years. 7

8 The Team Arham Infrabuild Ltd. has a team which comprises of various engineers in civil and mechanical which have experience in large infrastructure projects like IOC, NTPC, SAIL, Highway projects, civil construction in oil refineries,construction of highways,hydro projects and railways,managing construction activities with groups like DLF, Jaypee and Ansals. The team operates 24 x 7 and is supervised by at least one Project Manager at each site. The team will necessarily include supervisors, foremen, Stores In-charges, Billing Engineer, electricians, crane operators, welders and work force. We have various staff, but all with one culture and one goal to ensure we remain the very best. We are backed by a team of professionals, who work round-the-clock in order to fulfill the demands of the clients. Our experts try to achieve the goals of the organization efficiently and diligently. All the members are appointed strictly on the basis of their work experience and knowledge in this domain.Our architects work in coordination with the clients so as to design the layout as per their preferences. We try to under stand the latest trends of the market and accordingly render the services. The team members in our organization comprise : Architects Engineers Designers Supervisors Quality testing personnel 8

9 List of Equipments 9 3DX Bachoeloader (JCB) Transit Mixer Vehicle 6 Cum (Chasis Tata 2516 with Greaves Concrete Mixer 65XL) Mobile Hydraulic Crane (Escorts F15) Tractor Trolly Diesel Generator Amico 6000 Watt Truck Tata 407 / Trailor Ashok Leyland 3516 Triple Axle 35 Tons Bar Bending Machines Bar Cutting Machines Jack Hammer with Air Compressor Concrete Pump (Schwing Stetter BP 350DX) High Frequeny Convertors with Vibrators Vibrators-Diesel/Electrical/Petrol Welding DG Sets / Diesel Welding Machines Diesel Generators- 7.5KV/15 KV/40 KV/125 KV / Mobile DG Sets Powerica 125 KVA Furnished & Unfurnished Containers

10 List of Equipments (contd.) Batching Plant Typical Shuttering for Metro Rail & Road Work Shuttering/Scaffolding & Structural Steel Tata Excavator EX 200LC Tata Dump Truck Daewoo NOVUS 6C280-2 Concrete Pump Diesel Engine HBT Cum/H JCB Loader JCB Escorts 430Z 1.5 cum JCB Excavator Grader G720 Volvo Canada 16 Tons Roller Tandum L&T Case Tons Roller Soli L&T/Escorts 1107/ Tons Sensor Paver ABG Titan IR MTS B.Plant Simem CP cum/pr

11 Projects Executed Project NameClientDurationDescription of Activities 1Jaipur-Mahwa NH-8IJM(India) Infrastructure Ltd 13 MonthsConstruction of Toll Plaza-II Minor Bridges, Box Culverts 2Construction & Development of an Integrated Township IJM(India) Infrastructure Ltd 18 MonthsConstruction of 37 Villas Total Area 150,000 Sq Ft 3330 MW Srinagar Hydro Electric Project GVK Projects Ltd 18 MonthsConstruction of Water Body (Canal) Fore Bay Intake Pass Channel Tail race Channel 4Delhi Metro ProjectIJM(India) Infrastructure Ltd 5 MonthsConstruction of Vis Duct & Dhaula Kuan for Airport One for Express Line Including Ramps Amel- C MW Srinagar Hydro Electric Project GVK Projects Ltd 12 MonthsConstruction of Power House & Penstocks 6KMP Express WayDSC Limited15 MonthsConstruction of Structure & Bridges 7Barapullah Pack-1DSC Limited3 MonthsCasting of Pile Cap & Pier with Crash Barrier

12 Projects Executed (contd.) S No.Project NameClientDurationDescription of Activities 8 Rapid Metro Rail Project,GurgaonIL & FS18 MonthsConstruction of Mall of India Station 9 Rapid Metro Rail Project,GurgaonIL & FS18 MonthsConstruction of Pile Cap,Pier Cap & Pier 10 Surat Hazira Road Project NH6ISOLUX CORSAN3 MonthsConstrution of Structure & Bridges (10 kms) 11 Rapid Metro Rail Project,GurgaonIL & FS6 MonthsConstruction of Pile Cap,Pier Cap & Pier 12DMRC Project,FaridabadL&T Construction3 MonthsConstruction of Viaduct (17 Kms) 13 Rapid Metro Rail Project,GurgaonIL & FS3 MonthsConstruction of Portals 14 Rapid Metro Rail Project,GurgaonIL & FS1 MonthWaterproofing 15 DMRC Project,Faridabad (HR) L&T Construction08 MonthsConstruction of Viaduct (17 Kms) 16 DMRC Project,Shakurpur,DelhiL&T Construction03 MonthsConstruction of Viaduct (07 Kms) 17 Road Project,GhaziabadITD-CEM India18 MonthsConstruction of "I" Girder & Flyover (4 Kms) 18 DMRC Project,Bahadurgarh (HR) CORSAN CORVIAM CONSTRUCCION 03 MonthsDevelopment of Casting Yard

13 Letter of Certification





18 Work-in-Progress 18 Sl.No.Project NameClientDuration Description of Activities 1Deoli-Kota Road Project GVK Projects Ltd. 19 MonthsConstruction of Structures (25 Kms) 2 Civil Works at Jaipur Kishangarh Toll Plaza(Rajasthan)GVK (JEPL) 03 MonthsConstruction of Toll Plaza 3 Bameetha-Satna Road ProjectMPRDC 12 Months Development of Bameetha-Panna- Nagod-Satna NH-75 Road on BOT basis 98 Kms.

19 Four Laning Work at Kota-Deoli 19

20 Abutment Cap & Girder Launching at KMP

21 Jaipur-Mahwa, NH-8 Construction of Toll Plaza – II Minor Bridges, Box Culverts

22 Rapid Metro - Gurgaon

23 Way Forward Keeping in pace with the progressive work in infrastructure construction, we are geared up to undertake the following projects : Scaling up of operations in Metro railways ; Irrigation projects ; Hydro-power projects ; Highways/ Expressways ; Residential and Commercial projects ; Participation in various upcoming projects in Haryana, Uttar Pradesh, Uttarakhand, Madhya Pradesh, Andhra Pradesh and Delhi NCR ; 23

24 Standalone Financials 24

25 Next Step Mr Taj Parakh Mob No. : Delhi Office G -1/1521, Wazir Nagar, Kotla Mubarakpur, New Delhi Landline : / Hyderabad Office 309, 3 rd Floor, Diamond Towers, SD Road, Secunderabad – Landline : Please Contact

Download ppt "ARHAM INFRABUILD LTD Company Profile. Company History Established as a company incorporated under Companies Act 1956 in FY 2008 engaged in construction."

Similar presentations

Ads by Google