Presentation is loading. Please wait.

Presentation is loading. Please wait.

Liaison from to Date: 15 September, 2016 September 2016

Similar presentations


Presentation on theme: "Liaison from to Date: 15 September, 2016 September 2016"— Presentation transcript:

1 Liaison from 802.15 to 802.18 Date: 15 September, 2016 September 2016
Name Affiliation Address Phone Jay Holcomb Itron, Inc. 2111 N. Molter Liberty Lake, WA 99019 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Slide 1 Jay Holcomb, Itron, Inc. Jay Holcomb, Itron, Inc.

2 September 2016 Overview This document summarizes the activities of the IEEE Working Group for IEEE RR-TAG during the September 2016 IEEE 802 Interim Meeting at the Warsaw Marriott, Warsaw, Poland Jay Holcomb, Itron, Inc.

3 Task Group Status (1/2) September 2016 Task Group Closing Reports:
CLOSING REPORT: TG3d 100G THZ - KUERNER /0691r00 CLOSING REPORT: TG3e HRCP (HIGH RATE, CLOSE PROXIMITY) - ESTRADA /0634r01 CLOSING REPORT: TG4s SRU (SPECTRUM RESOURCE UTILIZATION) - KITAZAWA /0697r03 CLOSING REPORT: TG4t HRP (HIGHER RATE PHY) - POWELL /0611r01 CLOSING REPORT: TG4u IBP (INDIA 865 BAND PHY) - BEECHER /0651r00 CLOSING REPORT: TG4v RSGB Regional Sub-GHz band updates - BEECHER /0624r02 CLOSING REPORT: TG7m (7r1) OWC (OPTICAL WIRELESS COMMS) - JANG /0703r00 CLOSING REPORT: TG8 PAC (PEER AWARE COMMUNICATIONS) - LEE /0648r00 CLOSING REPORT: TG10 L2R (LAYER 2 ROUTING) POWELL /0612r01 CLOSING REPORT: TG12 ULI (UPPER LAYER INTERFACE) KINNEY /0601r01 Jay Holcomb, Itron, Inc.

4 Study & Interest Group Status
September 2016 Study & Interest Group Status SGs n/a IGs CLOSING REPORT: IG LWPA (low rate wide area) - Robert /0654r01 CLOSING REPORT: IG HRRC (HIGH RATE RAIL) - KIM plenary CLOSING REPORT: IG DEP (DEPENDABILITY - KOHNO not meeting CLOSING REPORT: IG THZ - KUERNER plenary Other CLOSING REPORT: IETF/WNG/WG RULES/MAINTENANCE - KINNEY /0604r01 11-15 REG SC KENNEDY /1084r01 Jay Holcomb, Itron, Inc.

5 Other Group Status September 2016 Liaison Reports
LIAISON REPORT - Petrick LIAISON REPORT - Holcomb /0663r00 LIAISON REPORT - Shellhammer no report LIAISON REPORT - Godfrey/Rolf verbal Jay Holcomb, Itron, Inc.

6 802.15 Meeting Close The 802.15 WG adjourned Thursday evening
September 2016 Meeting Close The WG adjourned Thursday evening The next face to face meeting of the WG will be the Plenary 08 – 10 November 2016 at the Grand Hyatt San Antonio, San Antonio, TX, USA Jay Holcomb, Itron, Inc.


Download ppt "Liaison from to Date: 15 September, 2016 September 2016"

Similar presentations


Ads by Google