CONTENTS Phase I – Current Status Phase II - Future –Costs –Implementation program Performance Effects of Climate Change.

Similar presentations


Presentation on theme: "CONTENTS Phase I – Current Status Phase II - Future –Costs –Implementation program Performance Effects of Climate Change."— Presentation transcript:

1

2 CONTENTS Phase I – Current Status Phase II - Future –Costs –Implementation program Performance Effects of Climate Change

3 Treaty signed on 24 Oct 1986 Phase II Agreement signed on 11 August 2011

4 WHAT IS THE LHWP ? Bi-national interbasin water transfer - ultimate delivery 70 m 3 /s 5 Phases - 30 year Implementation - LHWC, LHDA & TCTA One of largest engineering projects Worth $ 8 billion

5 WHY THE LHWP ? Augmentation for Vaal System in RSA Millions people without water Cheaper alternative source Good quality water Opportunity for regional development Hydro-electricity for Lesotho

6 Project governance LESOTHO HIGHLANDS WATER COMMISSION

7 PHASE 1A & 1B Current

8 Phase 1

9

10

11 MUELA HYDRO POWER SWITCH YARD

12 POWERLINES

13

14 Bokong Vehicular Bridge

15 PHASE II Future

16 LHWP PHASE II Polihali Dam 163.5m high rockfill dam 49.5m Saddle dam Transfer Tunnel 38.2 km long 5.2m diameter Kobong Pump storage 101m high Kobong Dam 6.3 km tunnels 11.5m dia

17

18 KATSE POLIHALI POLIHALI to KATSE TUNNEL

19 TBM BREAKTHRU

20 Biophysical features Mitigation measures: Fish species Natural grass and woodlots Sedimentation Erosion prevention programmes Rehabilitation of disturbed areas Rescue Indigenous and threatened flora and fauna Instream Flow Requirements IFR volumes and policy - Downstream losses & compensation Water quality Responsibility for monitoring

21 SOCIAL Resettlement Polihali Reservoir Affects- 17 Villages = 534 Households = 2547 People Other assets Affected By Reservoir ( Fields & Grazing Lands) 72 Villages Affected Mokhotlong Town Excluded

22 ADVANCED INFRASTRUCTURE ROADS St Peters to Oxbow Rd Oxbow to Seate Bridge Rd Seate Bridge to Mapholaneng Rd, etc…. = OR = Matsoku to Polihali Route RESIDENTIAL AREAS Client, Engineer, Contractor facility, Mporosane and Polihali Labour camps CONSTRUCTION POWER Reroute Letseng-Tlokoeng 33kV line Reroute Tlokoeng-Mapholaneng 33kV line Reroute Mapholaneng-Mokhotlong 33 kV line New line 132kV line (Kao option done by LEC to be considered later) = OR = Matsoku to Polihali line Substation Polihali Upgrade Ha Lejone sub station TELECOMMUNICATIONS Relocate existing lines Polihale dam connection Tunnel Polihali FEEDER ROADS Mokhotlong to Mositeng Chaba Li Maketse to Moeaneng Ha Tlhakola to Makalong Ramoruti to Ha Pohla Ntlholohetsane to Ha Letjama Various road bridges

23 KOBONG PUMP STORAGE SCHEME

24 Upper dam Tunnel Powerhouse Discharge tunnel to Katse Dam

25 PS Katse reservoir Tunnel Intake Water transfer to SA

26 PROJECT STATUS Lower Dam = Katse Dam Upper Dam = Kobong Dam Dam height=101 meters Headrace Tunnel length=4270 meters Headrace Tunnel diameter=11.5 meters Detailed Feasibility Study funded by Swedish Government commenced in 2012 Feasibility Study complete 2013 Detailed design 2014 to 2016 Construction to start 2016 Completion end 2021 KOBONG 1200MW PUMP STORAGE SCHEME

27 TOP STRUCTURE OF THE LHDA – PHASE II Chief Executive Div Manager Development and Operations Division Div Manager Social Development and Environmental CHIEF OPERATING OFFICER (COO) Div Manager Phase II & Project management Unit PMU - Engineering - Social & environmental - Financial - Communications (PR) - Contracts / Legal ……. WATER TRANSFER RSA RESPONSIBILITY TCTA Funding procurement / administration HYDRO FUNDING LESOTHO RESPONSIBILITY Funding procurement / administration Finance Chief Financial Officer

28 PERFORMANCE

29 Key Performance Indicator Yield – Water Delivery (Volume & Quality) Power Supply – Revenue (Availability) Sustainability – Policy (IFR, EAP) Safety – Instrumentation (DSR)

30 Effects of Climate Change

31 4 x 1