Syed Ahmad Syed Mustafa Head, GTFS Strategic Planning, Alliance & Business Development Division May 2012 1.

Similar presentations


Presentation on theme: "Syed Ahmad Syed Mustafa Head, GTFS Strategic Planning, Alliance & Business Development Division May 2012 1."— Presentation transcript:

1 Syed Ahmad Syed Mustafa Head, GTFS Strategic Planning, Alliance & Business Development Division May

2 TABLE OF CONTENTS 2 BIOMASS IN MALAYSIA MUNICIPAL SOLID WASTE OIL PALM BIOMASS BIOMASS APPLICATIONS GREEN TECHNOLOGY FINANCING SCHEME (GTFS) WHAT IS GTFS? GTFS TERMS WHO SHOULD APPLY? THE PROCESS GTFS STATUS GREENTECH MALAYSIAQ & A

3 BIOMASS IN MALAYSIA Source: UPM Agricultural residues Generate>85 million tonnes / year (94% palm oil, 4% wood industry & 1% rice husk and baggase Municipal solid waste Generate >25,000 tonnes / day (48% organic / food waste, 24% paper, 9% rubber & plastic, 6% metal, 5% wood and 8% glass & textile Source: JPSPN

4 o 25,000 tons/day waste generated in Peninsular Malaysia in 2012 o Only an estimated of 5% recycled. o Landfills are the only means of disposal. o Life span of landfill years Current state of affairs Reduce dependence on landfills lack of areas for new landfills especially within major conurbation and corridors landfills increase methane and GHG emissions causing climate change negative public perception on landfills New sustainable SWM technologies are required to address environmental issues. Emerging technologies are available and looks promising but viability needs to be verified. MUNICIPAL SOLID WASTES Source: JPSPN

5 Oil Palm Biomass Palm oil industry is 4 th largest contributor to GNI (8% or RM50 million of GNI) Malaysia is the 2 nd largest producer in the world and largest exporter for CPO Produce 80 mil tonnes solid biomass/ yr and 60 mil tonnes of POME in 2010 In 2020 solid biomass and POME volume expected to increase to mil tonnes/ yr and mil tonnes / yr respectively

6 Oil Palm Biomass Source: Felda Palm Industries

7 OIL PALM BIOMASS 7 1 MT of FFB Biomass

8 BIOMASS APPLICATIONS 8

9 WHAT IS GTFS? 9 Soft loan scheme initiated by the government to facilitate the improvement of supply and utilization of Green Technology by providing easier access to financing.

10 LET IT BE GREEN! THE GREEN PROJECTS CRITERIA Minimize degradation of environment; Zero or low green house gas emission; Safe for use and promotes healthy and improved environment for inhabitants Conserve the use of energy and natural resources; and Promote the use of renewable energy resources. 10

11 PRODUCER Maximum: RM50 Million per company Up to 15 years Legally registered Malaysian – owned companies (at least 51%) in all economic sectors USER Maximum: RM10 Million per company Up to 10 years Legally registered Malaysian – owned companies (at least 70%) in all economic sectors 11 GTFS TERMS CRITERIA i) CRITERIA

12 GTFS TERMS 12 Financing will be provided by all commercial & Islamic banks, Development Finance Institutions (DFIs) 2% p.a. of governments subsidy 60% government guarantee of financing approved 0.5% p.a. guarantee fee to the government Projects are to be located in Malaysia Refinancing is not allowed. OTHERS ii) OTHERS

13 KEY PLAYERS BANK NEGARA MALAYSIA COORDINATING THE SCHEME GREENTECH MALAYSIA ISSUANCE OF PROJECT CERTIFICATE CREDIT GUARANTEE CORPORATION PROVIDING GUARANTEE ON THE FINANCING AMOUNT PARTICIPATING FINANCIAL INSTITUTIONS FINANCING PROVIDER 13

14 WHO SHOULD APPLY? ENERGY SECTOR ENERGY SUPPLY SECTOR ENERGY UTILIZATION SECTOR BULDING CONSTRUCTION, MANAGEMENT, MAINTENANCE AND DEMOLITION WATER & WASTE MANAGEMENT SECTOR MANAGEMENT AND UTILIZATION OF WATER RESOURCES WASTE WATER TREATMENT, SOLID WASTE AND SANITARY LANDFILL TRANSPORTATION TRANSPORTATION INFRASTRUCTURE AND VEHICLE PUBLIC ROAD TRANSPORT 14

15 THE PROCESSES PROJECT CERTIFICATION STAGE 1 FINANCING & GUARANTEE STAGE 2 PROJECT OUTCOME /MONITORING STAGE 3 15

16 STAGE 1: PROJECT CERTIFICATION 16 GREENTECH MALAYSIA WILL ISSUE PROJECT APPROVAL CERTIFICATE Project Certificate TECHNICAL PROJECT APPROVAL BY GTFS COMMITTEE (GC) *If rejected, applicants will be notified Technical Evaluation & Business Review Presentation by GreenTech Malaysia Technical Evaluation Team APPLICATION (PROJECT PROPOSAL) - Online: Hard Copy Submission

17 STAGE 2: FINANCING & GUARANTEE FINANCING APPLICATION Loan Application Processed by PFIs Additional supporting documents are required LOAN APPROVAL BY PFI Approved/ Applicant will be notified if not approved LETTER OF OFFER TO BORROWER FROM PFI GOVERNMENT GUARANTEE APPROVED BY CREDIT GUARANTEE GROUP (CGC) LOAN AGREEMENT & DOCUMENTATION 17

18 STAGE 3: PROJECT OUTCOME/MONITORING PROJECT MONITORING & VERIFICATION Submission of monthly Project Progress Report to GreenTech Malaysia during project implementation Submission of Project Outcome Report every six months to GreenTech Malaysia upon commissioning PROJECT IMPACT Submission of Project Impact Study upon completion of Project Monitoring and Verification 18

19 GTFSSTATUS 19

20 APPLICATION PROCESSED AMOUNTING TO RM3.4BILLION IN GREEN COSTS

21 PROJECTS CERTIFIED AMOUNTING TO RM3.3BILLION IN GREEN COSTS

22 22 43 PROJECTS SECURED FINANCING AMOUNTING TO RM659.1 MILLION AND RM188.2 MILLION DISBURSED

23 23 37 GTFS CERTIFIED BIOMASS PROJECTS AMOUNTING TO RM855 MILLION IN GREEN COST

24 Certified biomass project by GTFS Type of biomass projects Type of resources No of projects (RM'million) Total project cost Recommended GT cost Biofuel oil palm biomass, wood, edible oil, etc Biomass / Biogas power plant oil palm waste, animal manure & waste water Paperoil palm biomass Fertilizeroil palm waste & wood Palletsoil palm & wood waste Dry fiberoil palm biomass Total 37 1,

25 11 PROJECTS SECURED FINANCING AMOUNTING TO RM307 MILLION 25

26 Financing status for GTFS certified projects 1) Rejection reason: company do not have relevant expertise; 2) No submission; projects inactive or in progress for submitting loan application

27 CRITICAL SUCCESS FACTORS 27

28 28 Biogas Plant Criteria: Biogas power plant (RE ) Category: Producer

29 29 Paper FromWaste (Oil Palm EFB) Criteria: EFB based paper Category: Producer

30 30 ProjectGreen Pelleting Plant LocationKlang, Selangor Capacity 7,200 Mt/month (30% for domestic market) Green pellets and flakes at Calorific Value of 19MJ/kg Project Cost RM 42.1 million Project Objectives To produce palm tree-based pellets; Bio Green Pellets(BGP) and Green Flakes(Palm Kennel Shell) Technology The process is locally invented with German and Japanese technology application such as pellet press machine. The process includes demoisturization, vibrator separation, blending, drying exchange, fumigations, homogenization, packing in standard bags(Jumbo bag or loose). Project outcome Reduction of GHG emission about 60,054 tCO2-eq/yr Pellet Production Criteria: Green pellets & flakes Category: Producer

31 31 Project Nutrient Recycling Strategy via Decomposition of Palm Oil Mill Green Waste LocationGua Musang, Kelantan Capacity Compost plant capacity : incoming EFB 50,544 metric ton/year compost production 27,048 metric ton/year Plant area requirement is acres Project CostRM 8.4 million Project Objectives To convert EFB (50,544 metric ton/year) into bio-organic fertilizer (27,048 metric ton/year) by using a compost plant. Technology 1. Composting technology and addition of beneficial microbes. 2. Extraction of humic acid from composting leachate. Project outcome Reduction of GHG emission about 28, tCO2-eq/yearComposting Criteria: Bio-compost Category: Producer

32 32 Dry Fiber Criteria: EFB dry fiber Category: Producer

33 ABOUT GREENTECH MALAYSIA 33 INCEPTION: 12 MAY 1998 FOCUS Technology and Research Centre in the Energy Sector focussing on EE and RE. CHANGED NAME: 7 APRIL 2010 MANDATE Implementation Agency for development of Green Technology

34 34 ENERGY AUDITGREEN TOWNSHIPCLEAN DEVELOPMENT MECHANISM GREEN TECHNOLOGY FINANCING SCHEME COMPETENCY DEVELOPMENT CENTRE IGEMEV ROADMAPGREEN TECHNOLOGY ROADMAP CENTRE OF EXCELLENCE GREEN LABELGREEN DIRECTORYSMART PARTNERSHIPSActivities… 34

35 Q & A SESSION 35

36 Malaysian Green Technology Corporation ( T) No. 2, Jalan 9/10, Persiaran Usahawan, Seksyen Bandar Baru Bangi, Selangor Darul Ehsan Website: Hotline: