12 Things You Need to Know about Monitoring Based Commissioning (MBCx) Presented by Rick Rodriguez – April 23 rd, 2014 Restricted © Siemens Industry, Inc.

Similar presentations


Presentation on theme: "12 Things You Need to Know about Monitoring Based Commissioning (MBCx) Presented by Rick Rodriguez – April 23 rd, 2014 Restricted © Siemens Industry, Inc."— Presentation transcript:

1 12 Things You Need to Know about Monitoring Based Commissioning (MBCx) Presented by Rick Rodriguez – April 23 rd, 2014 Restricted © Siemens Industry, Inc All rights reserved. Page 1Author / Department

2 Restricted © Siemens Industry, Inc All rights reserved. Page 2Author / Department Building Lifecycle Costs POST-BUILT ENERGY CONSUMPTION = 32% OF TOTAL LIFECYCLE COSTS! Design/Build 20% In Use 80% Operations 60% Energy 40%

3 Restricted © Siemens Industry, Inc All rights reserved. Years Building Performance 100% 1N+1 The Importance of Building Performance Management

4 Restricted © Siemens Industry, Inc All rights reserved. Years Building Performance 100% 1N+1 MBCx Software drives savings throughout the process The Importance of Building Performance Management

5 Restricted © Siemens Industry, Inc All rights reserved. Basic repairs based on actionable information from MBCx Software MBCx Software drives savings throughout the process Years Building Performance 100% 1N+1 The Importance of Building Performance Management

6 Restricted © Siemens Industry, Inc All rights reserved. Advanced Control Strategies Ex: Chilled Water System Optimization MBCx Software drives savings throughout the process Years Building Performance 100% 1N+1 Basic repairs based on actionable information from MBCx Software The Importance of Building Performance Management

7 Restricted © Siemens Industry, Inc All rights reserved. Equipment Replacement and Upgrades Advanced Control Strategies Ex: Chilled Water System Optimization MBCx Software drives savings throughout the process Years Building Performance 100% 1N+1 MBCx impacts 32% of lifetime cost! Basic repairs based on actionable information from MBCx Software The Importance of Building Performance Management

8 Restricted © Siemens Industry, Inc All rights reserved. Page 8 Where Does Technology Fit In? IT/building convergence Systems: building, business, IT, enterprise Big data Networks and storage are readily available and accessible Cloud delivery Medium to easily deploy and update solutions User experience Customized visualization for a range of stakeholders Data analytics Sophisticated analytics to turn data into actions Efficient buildings use Technology as an Enabler Indoor Environment Energy Efficiency System Performance Reliability Compliance Lifecycle Sustainability Financial Top Facility Goals

9 Restricted © Siemens Industry, Inc All rights reserved. Commissioning strategy leverages Fault Detection & Diagnostics Strategy & Planning Page 9 EBCx (Existing Building Commissioning): An EBCx program will involve work in the Plan, Evaluate and Implement phases and will rely on people, processes and technologies in order to drive home results. MBCx (Monitoring Based Commissioning): MBCx programs will involve ongoing service and data driven measurement and reporting. Like EBCx, a combination of people, process and technology are necessary for a successful MBCx program. FDD (Fault Detection Diagnostics): FDD is an important tool that can be leverage to create quick and cost effective results during the Evaluate, Service and Measure phases. FDD relies heavily on technology in order to be successful. EBCx MBCx FDD

10 Restricted © Siemens Industry, Inc All rights reserved. About the Authors Strategy & Planning Jim Butler – CTO – Cimetrics Craig Engelbrecht – Director of Smart Services and Technology – Siemens Jim Lee – CEO, Founder – Cimetrics Jim Sinopoli - Managing Principal, Founder – Smart Buildings, LLC

11 Restricted © Siemens Industry, Inc All rights reserved. 1.It goes beyond energy savings 2.Its a team effort 3.Process, Process, Process 4.Implementation requires full buy-in 5.Its more than just a rule developed in a lab 6.You might not have all the data you want and need 7.When it comes to data, its all hands on deck 8.MBCx doesnt work on its own 9.The software doesnt drop in and get to work 10.Dont turn it all on at once 11.If your not committed to fixing issues, dont waste your money on MBCx 12.Optimization strategies go hand-in-hand with analytics 12 Things You Need to Know About MBCx Siemens Whitepaper The 12 Things You Need to Know About MBCx Jim Butler, Craig Engelbrecht, Jim Lee, Jim Sinopoli

12 Restricted © Siemens Industry, Inc All rights reserved. Page 12 PeopleTechnology Keys to Success Process

13 Restricted © Siemens Industry, Inc All rights reserved. Page 13 Contact Details- Craig, Mike, Rick Rick Rodriguez Director, Portfolio & Innovation – Building Performance & Sustainability Phone: Craig Engelbrecht Director, Smart Services and Technology Phone: Mike Chimack Senior Program Manager, Commissioning Advantage Phone:


Download ppt "12 Things You Need to Know about Monitoring Based Commissioning (MBCx) Presented by Rick Rodriguez – April 23 rd, 2014 Restricted © Siemens Industry, Inc."

Similar presentations


Ads by Google