Presentation is loading. Please wait.

Presentation is loading. Please wait.

NGP TGaz Nov. Agenda Date: Authors: Nov. 2015

Similar presentations


Presentation on theme: "NGP TGaz Nov. Agenda Date: Authors: Nov. 2015"— Presentation transcript:

1 NGP TGaz Nov. Agenda Date: 2015-11-12 Authors: Nov. 2015
doc.: IEEE /1003r0 Nov. 2015 NGP TGaz Nov. Agenda Date: Authors: Jonathan Segev, Intel Corporation Jonathan Segev, Intel Corporation

2 IEEE 802.11 Task Group az Next Generation Positioning
Nov. 2015 IEEE Task Group az Next Generation Positioning Dallas, Texas Nov. 8th-13th , 2015 Chair: Jonathan Segev (Intel) Vice-chair: Carlos Aldana Secretary: Zhou Lan (MediaTek) Jonathan Segev, Intel Corporation

3 Nov. 2015 doc.: IEEE /1003r0 Nov. 2015 Abstract This presentation contains the IEEE TGaz NGP (Next Generation Positioning) agenda for the Nov. meeting. Jonathan Segev, Intel Corporation Jonathan Segev, Intel Corporation

4 Attendance, Voting & Document Status
Nov. 2015 Attendance, Voting & Document Status Make sure your badges are correct Please announce your affiliation when you first address the group during a meeting slot If you plan to make a submission be sure it does not contain company logos or advertising Questions on Voting status, Ballot pool, Access to Reflector, Documentation, member’s area see Jon Rosdahl – Cell Phones Silent or Off Jonathan Segev, Intel Corporation

5 Logistics Attendance: Documentation Note: https://imat.ieee.org
Nov. 2015 Logistics Attendance: You must register before logging attendance. You must log attendance during each 2 hour session. Documentation Use “TGaz” folder for documents relating to the TGaz activity. Note: Per WG leadership guidance, attendance count at the midpoint of each timeslot will be conducted during each TG meeting slot. Jonathan Segev, Intel Corporation

6 Patent Policy Following 5 slides September 2015
July 2014 doc.: IEEE /xxxxr0 September 2015 Patent Policy Following 5 slides Jonathan Segev, Intel Corporation Osama Aboul-Magd (Huawei Technologies)

7 Instructions for the WG Chair
July 2014 doc.: IEEE /xxxxr0 September 2015 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: Show slides #1 through #4 of this presentation Advise the WG attendees that: The IEEE’s patent policy is described in Clause 6 of the IEEE-SA Standards Board Bylaws; Early identification of patent claims which may be essential for the use of standards under development is strongly encouraged; There may be Essential Patent Claims of which the IEEE is not aware. Additionally, neither the IEEE, the WG, nor the WG chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development. Instruct the WG Secretary to record in the minutes of the relevant WG meeting: That the foregoing information was provided and that slides 1 through 4 (and this slide 0, if applicable) were shown; That the chair or designee provided an opportunity for participants to identify patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) of which the participant is personally aware and that may be essential for the use of that standard Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom. The WG Chair shall ensure that a request is made to any identified holders of potential essential patent claim(s) to complete and submit a Letter of Assurance. It is recommended that the WG chair review the guidance in IEEE-SA Standards Board Operations Manual and in FAQs 14 and 15 on inclusion of potential Essential Patent Claims by incorporation or by reference. Note: WG includes Working Groups, Task Groups, and other standards-developing committees with a PAR approved by the IEEE-SA Standards Board. Jonathan Segev, Intel Corporation Osama Aboul-Magd (Huawei Technologies)

8 Participants, Patents, and Duty to Inform
July 2014 doc.: IEEE /xxxxr0 September 2015 Participants, Patents, and Duty to Inform All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants [Note: Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2]: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search Slide #1 Jonathan Segev, Intel Corporation Osama Aboul-Magd (Huawei Technologies)

9 July 2014 doc.: IEEE /xxxxr0 September 2015 Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at Slide #2 Jonathan Segev, Intel Corporation Osama Aboul-Magd (Huawei Technologies)

10 Call for Potentially Essential Patents
July 2014 doc.: IEEE /xxxxr0 September 2015 Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted Slide #3 Jonathan Segev, Intel Corporation Osama Aboul-Magd (Huawei Technologies)

11 Other Guidelines for IEEE WG Meetings
July 2014 doc.: IEEE /xxxxr0 September 2015 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. Slide #4 Jonathan Segev, Intel Corporation Osama Aboul-Magd (Huawei Technologies)

12 TGaz - Schedule in a Glance
Nov. 2015 TGaz - Schedule in a Glance MON TUE WED THU FRI AM1 AM2 PM1 NGP PM2 Eve Jonathan Segev, Intel Corporation

13 Agenda Items for the Week
Nov. 2015 Agenda Items for the Week Patent policy Approve previous meeting minutes (11-15/1238). Election for TG vice chair position. Review TG development process and documentation status Presentations to inform the TG: Completion of use case document development. Initiation of Functional Requirements Document. Schedule teleconference times as needed. Jonathan Segev, Intel Corporation

14 Submission List for the week
Nov. 2015 Submission List for the week Document No. Presenter Title Topic Jonathan Segev NGP Nov Agenda Agenda Deck Zhou Lan Sep. meeting minutes approval Meeting minutes Friedbert Berens Dynamic Environment Use Cases Use cases Assaf Kasher MIMO for NGP feasibility Xun Yang STA to STA use cases Santosh Pandey Use case document Use case Jonathan Segev, Intel Corporation

15 Nov. 2015 Meeting Slot #1 Jonathan Segev, Intel Corporation

16 Meeting Slot # 1 Agenda Call Meeting to Order (1min)
Nov. 2015 Meeting Slot # 1 Agenda Call Meeting to Order (1min) Patent Policy and Logistics (5min) Last call for Submission (0min) Agenda Setting (4min) Approval of previous meeting minutes (3min - Chair) Election for TG vice chair position. Presentation to inform TG. Jonathan Segev, Intel Corporation

17 Submission order – Slot 1
Nov. 2015 Submission order – Slot 1 Document No. Presenter Title Topic 11-15/1237 Jonathan Segev Next Gen. Positioning Agenda Deck Zhou Lan Sep. meeting minutes approval Meeting minutes Friedbert Berens Dynamic Environment Use Cases Use cases Assaf Kasher MIMO for NGP feasibility Jonathan Segev, Intel Corporation

18 Approval of previous meeting minutes
Nov. 2015 Approval of previous meeting minutes Document 11-15/1238r1 posted to Mentor Oct. 5th. Motion: To approve document 11-15/1238r1 as TG meeting minutes for the Bangkok meeting. Moved by: Zhou Lan Seconded by: Allan Zhu Results (Y/N/A): Unanimous consent Jonathan Segev, Intel Corporation

19 TGaz Vice-chair elections
Nov. 2015 TGaz Vice-chair elections Last call for nominations. Close of nomination. Presentation of nominees. Jonathan Segev, Intel Corporation

20 TGaz Vice-chair elections
Nov. 2015 TGaz Vice-chair elections Motion To approve Carlos Aldana (Qualcomm) as TGaz vice- chair. Moved: Allan Zhu 2nd: Santosh Pandey Results (Y/N/A): 30/0/1 Motion passes Jonathan Segev, Intel Corporation

21 Nov. 2015 Presentations Jonathan Segev, Intel Corporation

22 Nov. 2015 Attendance reminder Jonathan Segev, Intel Corporation

23 Nov. 2015 Recess Jonathan Segev, Intel Corporation

24 Nov. 2015 Meeting Slot #2 Jonathan Segev, Intel Corporation

25 Meeting Slot # 2 Agenda Call Meeting to Order (1min)
Nov. 2015 Meeting Slot # 2 Agenda Call Meeting to Order (1min) Patent Policy and Logistics (5min) Agenda Setting (4min) Presentations to inform the TG (55min) Jonathan Segev, Intel Corporation

26 Submission order – Slot 2
Nov. 2015 Submission order – Slot 2 Document No. Presenter Title Topic 11-15/1003 Jonathan Segev Next Gen. Positioning Agenda Deck Xun Yang STA to STA use cases Use cases Santosh Pandey Use case document Use case Jonathan Segev, Intel Corporation

27 Motion – approve UC document
July 2015 Motion – approve UC document Motion We adopt document r2 as our baseline draft for use case document. Move: Santosh Pandey 2nd: Allan Zhu Y: 15 N: 0 A: 5 Motion passes. Jonathan Segev (Intel)

28 Review TGaz Timeline progress
Nov. 2015 Review TGaz Timeline progress 2015 2016 2017 2018 2019 2020 PAR Approved (Sep. 2015) We are here NGP SG Launch (Jan. 2015) TG formation meeting (Sep. 2015) .11az Draft 1.0 (Sep. 2017) .11az Draft 2.0 (Mar 2018) .11az Final (Mar ) UCD FRD 11az SFD Amendment text UC doc. (May 15 – Nov. 17) Spec Frame work (May 16 – Mar. 17) Func. Req. Doc. (Nov May 16) Amendment text (Mar 17 – Mar. 20) Jonathan Segev, Intel Corporation

29 Goals for the Jan. meeting
Sep. 2015 Goals for the Jan. meeting Initiate the Functional Requirement Document development. Technical presentations. Jonathan Segev, Intel Corporation

30 Teleconference Schedule
Sep. 2015 Teleconference Schedule Dec. 2nd 10:00 ET for 1hr. Do we need anymore calls? Jonathan Segev, Intel Corporation

31 Motion To instruct the use case document editor to add use cases depicted by slide 6 of submission r1 to the use case working draft document. Move: Xun Yang 2nd: Allan Zhu Y: N: A: Xun Yang, Huawei

32 Nov. 2015 Submission 1436 Motion Motion to table motion on slide 31 of this deck until Thursday PM1 session. Move: Santosh Pandey 2nd: Allan Zhu Y: 10 N: 0 A: 3 Motion passes. Jonathan Segev, Intel Corporation

33 Reminder to do attendance
Sep. 2015 Reminder to do attendance Jonathan Segev, Intel Corporation

34 Nov. 2015 Recess Jonathan Segev, Intel Corporation

35 Meeting Slot # 3 Agenda Call Meeting to Order (1min)
Nov. 2015 Meeting Slot # 3 Agenda Call Meeting to Order (1min) Patent Policy and Logistics (5min) Agenda Setting (4min) Tabled motion from 2nd slot of the week (25min). Jonathan Segev, Intel Corporation

36 Submission order – Slot #3
Nov. 2015 Submission order – Slot #3 Document No. Presenter Title Topic 11-15/1003 Jonathan Segev Next Gen. Positioning Agenda Deck Xun Yang STA to STA use cases Use cases Jonathan Segev, Intel Corporation

37 Motion#5 (tabled) To instruct the use case document editor to add use cases depicted by slide 6 of submission r1 to the use case working draft document. Move: Xun Yang 2nd: Allan Zhu Y: N: A: Xun Yang, Huawei

38 Nov. 2015 AOB? Jonathan Segev, Intel Corporation

39 Nov. 2015 Attendance remainder Jonathan Segev, Intel Corporation

40 Nov. 2015 Adjourned Jonathan Segev, Intel Corporation

41 Sep. 2015 Backup Jonathan Segev, Intel Corporation

42 References Sep. 2015 doc.: IEEE 802.11-15/1003r0 Sep. 2015
Jonathan Segev, Intel Corporation Jonathan Segev, Intel Corporation

43 July 2015 Some history Jonathan Segev (Intel)

44 Historical performance data
Sep. 2015 Historical performance data Stage Duration 11v 11u 11ac [1] 11ad [1] Proposed for 11az PAR approval -> Approved Standard 64 months 46 months PAR approval -> Draft 1.0 34 months 21 months PAR approval -> D0.1 29 months 17 months D0.1 –> Draft 1.0 6 months 4 months Draft 1.0 –> Draft 2.0 8 months Draft 2.0 -> Final 22 months 19 months Amendment size 442 pg. 679 pg. Jonathan Segev, Intel Corporation

45 Study Group Timeline - modified
Sep. 2015 Study Group Timeline - modified Month Milestone / Plan of Action January (i) Formation meeting Initial discussion on PAR and CSD Presentations on use cases, usage models. March (p) Continue discussion on PAR and CSD Discussion supporting presentations. Study Group extension May (i) SG Final version of PAR and CSD Discussion on supporting presentations Working Group Approval on PAR and CSD PAR circulated amongst other WGs. July (p) Presentations. Resolve EC feedback on PAR and CSD. Executive Committee Approval on PAR and CSD July NesCom Approval on PAR and CSD (July 24/Sep. 4th submittal deadline). Nov. Sep. (actual) Task Group formation meeting Jonathan Segev, Intel Corporation

46 Timelines Nov. 2015 UCD FRD 11az SFD Amendment text 2015 2016 2017
2018 2019 2020 PAR Approved (Sep. 2015) We are here NGP SG Launch (Jan. 2015) TG formation meeting (Sep. 2015) .11az Draft 1.0 (Sep. 2017) .11ax Draft 2.0 (Mar 2017) .11az Final UCD FRD 11az SFD Amendment text UC doc. (May 15 – Nov. 17) Spec Frame work (May 16 – Mac. 17) Func. Req. Doc. (Nov May 16) Spec Frame work (Mar 17 – Jan. 19) Jonathan Segev, Intel Corporation

47 Functional Req. Document
Nov. 2015 2015 2016 2017 2018 2019 2020 PAR Approved (Sep. 2015) We are here NGP SG Launch (Jan. 2015) TG formation meeting (Sep. 2015) .11az Draft 1.0 (Sep. 2017) .11ax Draft 2.0 (Mar 2017) .11az Final UCD FRD 11az SFD Amendment text Functional Req. Document (Nov May 16) Spec Frame work (Mar 17 – Jan. 19) Spec Frame work (May 16 – Mac. 17) Jonathan Segev, Intel Corporation

48 Motions and strawpolls as needed
July 2015 Motions and strawpolls as needed Motion/strawpoll To instruct the use case document editor to add use cases depicted by slides x y z of submission abc to the use case working draft document. Move: 2nd: Y: N: A: Jonathan Segev (Intel)

49 July 2015 Strawpoll#1 We support the addition of use cases depicted by slides a,b,c of submission 11-15/XYZrN to the use case working draft document. Y: N: A: Jonathan Segev (Intel)

50 Motions on submission xxx
July 2015 Motions on submission xxx Motion To instruct the use case document editor to add use cases depicted by slides a,b of submission 11-15/XYZrN to the use case working draft document. Move: 2nd: Y: N: A: Jonathan Segev (Intel)

51 Strawpoll#1 submission 634
July 2015 Strawpoll#1 submission 634 We support the addition of use cases depicted by slides a,b,c of submission 11-15/XYZrN to the use case working draft document. Y: N: A: Jonathan Segev (Intel)

52 802.11 Template Instructions 1/4
Nov. 2015 doc.: IEEE /1003r0 Nov. 2015 Template Instructions 1/4 To properly identify your PowerPoint presentation as an IEEE Submission there are 7 steps that you must complete, and 12 data fields that you must fill in. Step 1. Obtain a document number (has the form yy/xxxx). Step 2. Title slide: Fill in the presentation subject title text, the full date (in ISO 8601 format of YYYY-MM-DD), and the complete author(s) details (a total of 3 data fields). Step 3. Abstract slide: Fill in the abstract text. Step 4. Press “Office” button, Prepare / Properties. Fill in the 2 data fields: Author field = first author's name Title field = Title of presentation Jonathan Segev, Intel Corporation Jonathan Segev, Intel Corporation

53 802.11 Template Instructions 2/4
Nov. 2015 doc.: IEEE /1003r0 Nov. 2015 Template Instructions 2/4 Step 5. Menu select View, Master, Slide Master, select the top master page (theme slide master). Place the document designator in the right hand side of the header. Document designator example "doc.: IEEE /9876r0" , or "doc.: IEEE /9876r2" Step 6. Menu select Insert, Header and Footer (5 data fields): Slide tab: Date & Time, Fixed = venue date (as Sep. 2015, e.g. January 2005) Footer = first author, company Notes tab: Data and time, Fixed = venue date (as Sep. 2015, e.g. January 2005) Header = document designator (e.g. “doc.: IEEE /9876r0”) Click "Apply to all". Step 7. Delete the four template instruction slides. Jonathan Segev, Intel Corporation Jonathan Segev, Intel Corporation

54 802.11 Template Instructions 3/4
Nov. 2015 doc.: IEEE /1003r0 Nov. 2015 Template Instructions 3/4 PowerPoint Submission Preparation Summary: Things to do: 7 Fields to fill in: 12 Jonathan Segev, Intel Corporation Jonathan Segev, Intel Corporation

55 802.11 Template Instructions 4/4 Recommendations
Nov. 2015 doc.: IEEE /1003r0 Nov. 2015 Template Instructions 4/4 Recommendations a) Always create a new presentation using the template, rather than using someone else's presentation. b) For quick and easy creation of new submissions, place the template files in the template folder area on your computer. Typical locations are: c:\Program Files\Microsoft Office\Templates\802.11, or c:\Documents and Settings\User Name\Application Data\Microsoft\Templates\802.11 To create a new submission from within PowerPoint, menu select File, New, then select the appropriate template file. c) When you update or revise your presentation, remember to check all 6 fields in steps 5 and 6 for the correct values. rev: Jonathan Segev, Intel Corporation Jonathan Segev, Intel Corporation

56 [begin placing presentation body text here]
Nov. 2015 doc.: IEEE /1003r0 Nov. 2015 [begin placing presentation body text here] Jonathan Segev, Intel Corporation Jonathan Segev, Intel Corporation

57 Nov. 2015 doc.: IEEE /1003r0 Nov. 2015 Jonathan Segev, Intel Corporation Jonathan Segev, Intel Corporation


Download ppt "NGP TGaz Nov. Agenda Date: Authors: Nov. 2015"

Similar presentations


Ads by Google