1 API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: John Helge Olsen Statoil Jan, 2017 Subcommittee 19

2 Task Group API 19 CI Group Name: Chemical Injection Devices For Downhole Applications Chair: John Helge Olsen Scope: Requirements for chemical Injection devices intended for use in the petroleum and natural gas industry. Requirements for specifying, selecting, designing, manufacturing, quality-control, testing and preparation for shipping, performance testing and calibration procedures. Status: 11’th Committee meeting scheduled January 24th – 26nd 2016 Houston, TX. Jan, 2017 Subcommittee 19

3 Task Group API 19 CI Meetings in to date: 10 Date Manufacturers
Consultants Operator/User API Staff Total Number Aug 25, 2014 16 4 1 21 Nov 11, 2014 15 20 Feb 3, 2015 8 5 Apr 21, 2015 10 2 7 19 Jul 07, 2015 Oct 06, 2015 9 11 Feb 02, 2016 Apr 26, 2016 12 Aug 9, 2016 Oct 28, 2016 14 Jan, 2017 Subcommittee 19

4 Task Group API 19 CI Meetings plan for 2017 Plans of meetings
Dates 2016 Task Meeting Host /location 24-26 January Task Group progress mtg, Annex C, D & E Halliburton, Houston 16 February Update mtg McCalvin Enterprises, Stafford Tx 14-16 March Task Group progress mtg, Annex C, D, E & F TBA, Aberdeen UK 20 April 16-19 May Task Group progress mtg, Annex B, C, D, E, F & H TBA, Stavanger Norway 15 June 8-11 August Task Group Progress mtg, prepare for Ballot API, Washington D.C. 17-20 October Task Group progress mtg, Read through for Ballot. WFD, Houston Jan 2017 Subcommittee 19

5 Task Group API 19 CI SC Liaison:
Status: Drafting document, approx. 60% complete Focus of change: New Specification Chair: Have had good progress after Stavanger mtg. Positive involvement from European members, will have more mtg’s in Europe in 2017 due to competency and involvement. Limited operator involvement. Ballot planned for October (Liaison with API 17Y Committee attempted 3 x. No success.) SC Liaison: Ballot likely late 2017 David McCalvin Jan, 2017 Subcommittee 19

6 Sections 1 Scope 2 Normative References 3 Definitions
4 Abbreviations and Symbols 5 Functional Specifications 6 Technical Specifications 6.1 General Requirements 6.2 Product Types 6.3 Design Criteria 6.4 Materials 6.5 Verification 6.6 Design Changes 6.7 Design Validation 6.8 Additional Validation Testing 6.9 Special Features Validation 6.10 Scaling of Validated Designs 6.11 Functional Testing 6.12 Retrievable Design Requirements 7 Manufacturing Jan, 2017 Subcommittee 19

7 Annexes Annex A – Informative - API Monogram Program
Annex B - (normative) - Reverse Flow Prevention Validation and Functional Testing Annex C - (normative) - Back Pressure Retention Design, Validation and Functional Testing Annex D - (normative) - Single Use Pressure Retaining Device Validation and Functional Testing Annex E - (normative) - Secondary Chemical Injection Screen Design, Validation and Functional Testing Annex F - (informative) - Retrievable Chemical Injection Device Design, Interface and Compatibility Annex G - (normative) - Flow and Pressure Control Products Design, Validation and Functional Testing Annex H - (normative) - Combination of Multiple Features in a Single Device Jan, 2017 Subcommittee 19

8 Questions or Comments? Jan, 2017 Subcommittee 19