1 “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed Transmission System.

2 AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE
CALLED Concession to design, finance, build, operate and provide maintenance to an electricity transmission line measuring 132 km long, approximately and with a 75 MVA capacity. The aim is to strengthen supply to the Pucallpa Sub-station, which presently has trouble meeting the rising demand focused on this sub-station. Once this new circuit starts operating in parallel with the current one with the same capacity will provide a greater power transmission capacity and reliability in the power supply from Sub-station Pucallpa. Estimated investment (VAT not included): US$ million Type of concession: Self-sustaining Concession period: 30 years plus the construction period (33 months) Estimated award date: Q I, 2017

3 AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE
PROJECT SUMMARY The main elements and project specifications are as follows: Specification details may be found in Annex 1 of the Concession Contract. The Aguaytía –Pucallpa 138 kV (circuit two) Transmission Line Aproximate Length : 132 km approximately Number of circuits : One Transmission Capacity 150 MVA Conductors per phase : Phase layout : Triangular Shield wire : One: OPGW. Support structures : Self-supported steel towers. Sub-stations connected : Aguaytía Sub-station – Pucallpa Sub-station Sub-stations  Expansions Aguaytía Sub-station– Ucayali Sub-station

4 AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE
TENDER: COMPETITION FACTOR Competition Factor: Lower cost for total service The Total Service cost includes: Yearly cost of investment with General Sales Tax excluded, calculated with a 12% rate and a 30-year period, plus. Yearly operation and maintenance costs excluding General Sales Tax(“CO&M ”). Bid application format: Disaggregated costs for the Electricity Transmission Line must be shown in forms 4-A and 4-B Only bids from bidders showing amounts and numbers for the Cost of Investment and the Cost of Operation and Maintenance (CO&M) that are same or lower the maximum figures established by Proinversion prior to the bid submission date, will be accepted. Additionally it is necessary to submit a Bid Bond for US$ 1.5 million. In numbers (with two decimals) In letters 1) Cost of Investment (US$) * 2) Yearly O&M cost (US$) * Note: * Numbers and amounts calculated to the date of commercial start-up of the Transmission Line 4

5 AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE
TENDER: QUALIFICATION CRITERIA Investors must go through a qualification process to be considered bidders and submit an offer. The finance and operational qualification criteria are the following: In order to certify the technical requirements, bidders have to show certifications or technical statements from third parties. Whoever certifies technical experience may take part in the Tender with only one bidder. This impediment is also for its Related Companies. Legal: No legal impediments to sign contracts with the Peruvian Government. Do not participated with another Bidder in this Tender; others details in the Bidding Documents. REQUIREMENTS Finance: Minimum Net Worth US$ 30 million Minimum Total Assets US$ 90 million Technical: Direct operation or have operated directly in the last two (2) years, electric power systems that meet the following conditions: Length: No less than two hundred fifty kilometers (250 km.) in voltages of no less than or over 220 kV. Transformation capacity: No less than 250 MVA in substations with voltages of 220 kV or more. 5

6 Submission of Bids and Contract Award
AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE (second circuit) TENDER: SCHEDULE Main Schedule Dates: Call for bids Contract First Draft Contract Second Draft Qualification form Contract Final Draft Submission of Bids and Contract Award Closure II Quarter 2016 II Quarter 2016 II Quarter 2016 IV Quarter 2016 I Quarter 2017 II Quarter 2017 PROINVERSION has the authority to change the schedule dates. Should that happen, PROINVERSION will inform all interested parties posting said date changes in its Webpage and, at the same time, will send a letter to all concerned parties before the qualification stage, and to Bidders after that stage. 6

7 AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE
INFORMATION AND CONTACTS Project Manager for Electricity Transmission Matters Aníbal del Águila Acosta Telephone (51-1) annex 1340 7