Presentation is loading. Please wait.

Presentation is loading. Please wait.

DEVRY BSOP 209 W EEK 3 H OMEWORK A SSIGNMENT Check this A+ tutorial guideline at homework-assignment.

Similar presentations


Presentation on theme: "DEVRY BSOP 209 W EEK 3 H OMEWORK A SSIGNMENT Check this A+ tutorial guideline at homework-assignment."— Presentation transcript:

1 DEVRY BSOP 209 W EEK 3 H OMEWORK A SSIGNMENT Check this A+ tutorial guideline at http://www.assignmentcloud.com/bsop-209/bsop-209-week-3- homework-assignment For more classes visit http://www.assignmentcloud.com S7.17 Markland Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding new equipment. Two vendors have presented proposals. The fixed costs for proposal A are $50,000, and for proposal B, $70,000. The variable cost for A is $12.00, and for B, $10.00. The revenue generated by each unit is $20.00. a) What is the break-even point in units for proposal A? b) What is the break-even point in units for proposal B? S7.18


Download ppt "DEVRY BSOP 209 W EEK 3 H OMEWORK A SSIGNMENT Check this A+ tutorial guideline at homework-assignment."

Similar presentations


Ads by Google