Presentation is loading. Please wait.

Presentation is loading. Please wait.

Case Study 1 Problem 5 Styner/Lauder Intersection Moscow, Idaho.

Similar presentations


Presentation on theme: "Case Study 1 Problem 5 Styner/Lauder Intersection Moscow, Idaho."— Presentation transcript:

1 Case Study 1 Problem 5 Styner/Lauder Intersection Moscow, Idaho

2 Problem 5: U.S. 95 South of Moscow How will U.S. 95 operate in the future? 1100 veh/hr in PM peak 700 trips from new development 400 trips from hamlet

3 Problem 5: U.S. 95 South of Moscow How should this problem be defined and analyzed?

4 Problem 5: U.S. 95 South of Moscow What are the possible options? What analysis plan should be followed? Existing analysis of 10-mile segment Future analysis of 10-mile segment Analysis of 10-mile segment with bypass

5 Sub-problem 5a: Existing Analysis of 10-Mile Segment of U.S. 95 What data are required for analysis? What other factors should be considered? What measure should be used to determine the performance of the facility?

6 Sub-problem 5a: Existing Analysis of 10-Mile Segment of U.S. 95 What data are required for analysis? ADT = 600 veh/hr Shoulder widths = 6 ft Lane widths = 12 ft Directional split = 54/46 PHF = 0.88 %trucks/buses = 10% Free flow speed = 60 mph %no pass zones = 30 2 access points/mile

7 Sub-problem 5a: Existing Analysis of 10-Mile Segment of U.S. 95 What other factors should be considered? Class I facility What measure should be used to determine the performance of the facility? Travel speed Percent time following Results 52.4 mph 55.7% time following LOS = C

8 Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet Consider these issues What can be done to assess the future performance characteristics of the one-mile section of U.S. 95 that passes through the hamlet? How can the estimated performance characteristics of the section of U.S. 95 that is within the hamlet be incorporated into an overall assessment of the 10-mile segment?

9 Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet Consider these issues What can be done to assess the future performance characteristics of the one-mile section of U.S. 95 that passes through the hamlet? How can the estimated performance characteristics of the section of U.S. 95 that is within the hamlet be incorporated into an overall assessment of the 10-mile segment?

10 Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet Here are some issues to consider as you proceed with the analysis of the future conditions. What volumes should be used in the future conditions analysis? What additional assumptions are necessary for the analysis? What common measure should be used to determine the performance of the facility throughout the various sections?

11 Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet Input data: Volumes? Other factors?

12 Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet The HCM procedure assumes rank 1 movements do not yield to lower-ranked movements. Why, then, is delay reported for the NB and SB through- and right-turn movements?

13 Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet Overall assessment: one approach

14 Sub-problem 5c: 10-Mile Analysis with a By-Pass

15 Sub-problem 5: Discussion What have we learned in this problem? The existing HCM procedure for two-lane highways has some limitations An alternative methodology might provide important insights The results may be useful in determining the proper course of action


Download ppt "Case Study 1 Problem 5 Styner/Lauder Intersection Moscow, Idaho."

Similar presentations


Ads by Google