Presentation is loading. Please wait.

Presentation is loading. Please wait.

 SCDOT has over 41,000 miles of pavements and over 8,400 bridges.  4 th largest state maintained system in the country.  Started working on the TAMP.

Similar presentations


Presentation on theme: " SCDOT has over 41,000 miles of pavements and over 8,400 bridges.  4 th largest state maintained system in the country.  Started working on the TAMP."— Presentation transcript:

1

2  SCDOT has over 41,000 miles of pavements and over 8,400 bridges.  4 th largest state maintained system in the country.  Started working on the TAMP in 2014.  Currently, wrapping up the Draft of our TAMP in advance of the final rulemaking.

3  State of the System  Whole Life Management  Risk Assessment  Financial Plan  Investment Strategies

4 Strategic Plan The strategic plan establishes SCDOT's transportation vision, mission, values, and goals. MTP The Multimodal Transportation Plan is SCDOT's long-range transportation plan updated every five years to reflect latest information. The current plan has a 2040 horizon and was approved in 2014. TAMP The TAMP is a 10-year tactical document focusing on the day-to-day programs and activities to improve business practices, asset conditions, and system performance. The TAMP is reviewed at two- and four-year intervals to evaluate how the Department is meeting performance targets. STIP The Statewide Transportation Improvement Program is the State's six-year transportation improvement program for all federally funded projects. The STIP covers all federally funded and regionally significant projects improvements for which funding has been approved and are expected to be undertaken during the upcoming six-year period.

5  Focus on maintenance and preservation of existing transportation system  Direct investments based on desired system performance  Use VMT to guide investment decisions  Consider priority networks that support economic competiveness by enhancing the mobility of people and freight  Promote the most efficient use of resources to extend the life of pavements and bridges

6

7

8

9

10

11

12  Consider agency goals  Stress the needs of the NHS to meet Federal reporting requirements  Acknowledge assets on priority networks  Use Vehicle Miles Traveled and condition in funding process  Distribute new funding by need to reach performance goals

13  Adopt Asset/Performance Management as a way of doing business  Update your UPWP’s to reflect performance  Use annual condition reports to select and program projects

14 Kevin L. Gantt, PE Asset Management Engineer (803) 737-4415 ganttkl@scdot.org


Download ppt " SCDOT has over 41,000 miles of pavements and over 8,400 bridges.  4 th largest state maintained system in the country.  Started working on the TAMP."

Similar presentations


Ads by Google